Loading...
HomeMy WebLinkAboutItem 12 - Approval of the Final Map for Tract 3063, Phase 3 for 3987 Orcutt Road (FMAP 1959-2018) Department Name: Community Development Cost Center: 4003 For Agenda of: January 21, 2020 Placement: Consent Estimated Time: N/A FROM: Michael Codron, Community Development Director Prepared By: Steve LaChaine, Senior Civil Engineer SUBJECT: APPROVAL OF THE FINAL MAP FOR TRACT 3063 - PHASE 3, 3987 ORCUTT ROAD (FMAP 1959-2018) RECOMMENDATION Adopt a draft Resolution (Attachment A) approving the Final Map for Tract 3063 – Phase 3 located at 3987 Orcutt Road (Attachment B) and authorize the Mayor to execute a Subdivision Agreement and Easements shown on the Final Map in accordance with Section 16.04.010.A.2 of the City’s Subdivision Regulations. REPORT-IN-BRIEF A vesting tentative map for Tract 3063 (all phases) was approved by the City Council on May 19, 2015 (Attachment C). Amended conditions and mitigation measures were approved by the City Council on February 15, 2018 per Resolution No. 10861 (Attachment D). Phase 3 of the final map has been submitted and the Public Works Director has determined that the Phase 3 final map is in substantial compliance with the tentative map in accordance with Section 16.04.040.A.3 of the City’s Subdivision Regulations. Once the map is approved by the City Council and all the appropriate fees and securities are submitted to guarantee completion of the Phase 3 improvements, the map can be recorded. DISCUSSION Background Tract 3063-Phase 3 Tract 3063-Phase 3 (FMAP 1959-2018) is located at 3987 Orcutt Road. This subdivision is commonly referred to as Righetti Ranch. A vesting tentative map for Tract 3063 (all three phases) was approved by the City Council on May 19, 2015, by Resolution No. 10619 (2015 Series), with approved amendments to mitigation measures and conditions by Resolution No 10861 (2018 series). The tentative map for phase 3 approved the creation of 34 single-family residential lots, one lot for private street, one lot for public park, two lots for public open space, and one lot for private open space. Due to the size of the tentative map, only the “sheets” of the tentative map that are pertinent to the final map approval are included (Attachment E). Tract 3063-Phase 3 will therefore create 39 lots consisting of: Item 12 Packet Page 259 1. 34 single-family lots 2. One private street lot 3. One public park lot 4. Two public open space lots 5. One private open space lot There are many curb, gutter, sidewalk, street, bikeway, and traffic circulation improvement requirements for the project as established by the conditions of approval including mitigation measures from the Initial Study/Mitigated Negative Declaration that was approved with the Tentative Map. Righetti Ranch LP (Subdivider) previously requested, and the City Council approved, deferment of some of the public improvements for the project to better match the scope of development in each of the three phases. All deferred improvements will now be completed with construction of Phase 3. The deferred improvements that will now be completed include: Tank Farm Road Frontage Improvements (from Phase 1) Frontage improvements on Tank Farm Road are near completion. The roundabout allows pedestrians to cross Tank Farm Road at Righetti Ranch Road and travel on the south side of the street to Islay Park and/or French Park. This reduced the need for the full sidewalk connection on the north side of Tank Farm Road all the way to Orcutt Road as part of Phase 1 or Phase 2. Left-turn pockets (interim) at the Brookpine and Wavertree intersections were completed with Phase 1, improving the safety at these intersections by removing the turn queues in the through lanes that existed. The remainder of the Tank Farm Road frontage improvements, from the railroad tracks to Orcutt Road, including permanent left-turn pockets for Brookpine and Wavertree, will be completed with this final Phase 3 map. The City is guaranteed this completion via the subdivision improvement bonds. Orcutt Road Frontage Improvements Conditions #27 and #116 of the tentative map for Tract 3063 require construction of all the improvements on Orcutt Road from Tiburon Way to Tank Farm Road (noted above) and along the Tract 3066 (Jones) frontage with Phase 1 unless otherwise deferred by the Public Works Director and Community Development Director. This requirement was established prior to finalization of phasing for all the subdivisions in the area. In order to make the project economically viable, the Subdivider had requested that some of the frontage improvements be deferred to spread out the costs among the various phases of the project. The City supported the deferral request. The balance of Orcutt Road improvements required by Tract 3063 will be completed with this final Phase 3 map. The City is guaranteed this completion via the subdivision improvement bonds. Item 12 Packet Page 260 Tank Farm/Orcutt Intersection Improvements The City and Subdivider have agreed to a roundabout in-lieu of a signalized intersection and dedicated right-turn pocket at this location. Off-site construction of the Tank Farm/Orcutt Intersection Improvements are required to be constructed and completed prior to building permit issuance of Tract 3063 Phase 3. Per the conditions of approval for the project, the City has taken the lead with preparing construction documents (plans, specifications and estimates) for the roundabout and has provided these materials to project applicant. Public Works staff and the applicant team are currently coordinating on final refinements to the construction documents with a targeted construction start date of summer 2020. Funding for the roundabout construction includes a combination of a direct contribution from the applicant, and transportation impact fee credits/reimbursements via the Citywide and OASP Transportation Impact Fee programs. The current construction cost is estimated at $3.3 million. Bicycle and Pedestrian Access Condition #32 for tentative Tract 3063 requires completion of bicycle and pedestrian paths to connect Tracts 3063, 3066, and adjoining OASP neighborhoods with Islay Park. A mix of pedestrian/bicycle trails, sidewalks, and on-street bike lanes have been constructed in Phase 1 and Phase 2 to satisfy this condition. These paths provide connectivity from Islay Park to the Tract 3063 central neighborhood park and to future OASP developments immediately adjacent to Tract 3063. A pedestrian/bike path will connect the private streets in Phase 3 with Tract 3063 Phase 1 and Phase 2 neighborhoods. The City is guaranteed this completion via the subdivision improvement bonds. The other OASP neighborhoods currently under construction will provide additional bike and pedestrian connectivity to the northerly OASP limits. The City is guaranteed this completion via the subdivision improvement bonds. Reimbursement Agreement Conditions #36 and #117 of the Tract Map, allowed the Subdivider to present financing and reimbursement programs for infrastructure improvements to be considered with any final map application. The reimbursement has been approved per City Council Resolution No. 10812 (2017 series), dated June 7, 2017 (Attachment G). Approving the Final Map The tentative map was approved May 19, 2015. The tentative map had an initial two-year life per Municipal Code Section 16.10.150. A two-year extension was granted by the City (TIME- 0431-2017) to May 19, 2019. Per Subdivision Map Act Section 66452.6, a phased map allows for a 36-month extension with the filing of each map phase. Therefore, the tentative map life for this 3rd and final phase is extended to May 19, 2022. Item 12 Packet Page 261 The final map for Tract 3063-Phase 3 is ready to be approved and recorded. Pursuant to Section 16.14.080 of the Municipal Code, the Public Works Director has determined that the final map is in substantial compliance with the tentative map and approved modifications thereof. Section 66474.1 of the Subdivision Map Act states that “a Legislative body shall not deny approval of a final or parcel map if it has previously approved a tentative map for the proposed subdivision and if it finds that the final or parcel map is in substantial compliance with the previously approved tentative map.” The approval of a final map is considered a ministerial action. Appropriate securities will be submitted prior to map recordation to guarantee completion of the required subdivision improvements as shown in the Subdivision Agreement (Attachment F). The resolution approving the final map also authorizes the Mayor to sign the Subdivision Agreement requiring the Subdivider to complete the subdivision improvements. Previous Council Action The tentative subdivision map for Tract 3063 (Righetti Ranch) was approved by City Council on May 19, 2015, by Resolution No. 10619 (2015 Series). The final map for Phase 1 was approved by City Council on February 21, 2017, by Resolution No. 10772 (2017 Series). The final map for Phase 2 was approved by City Council on October 1, 2019, by Resolution No. 11047 (2019 Series). Policy Context The City Council approves final maps as a follow-up action to their tentative map approval in accordance with the Subdivision Map Act and the City’s Subdivision Regulations. Public Engagement Public engagement was completed with the approval of the Tentative Map and the development of the Orcutt Area Specific Plan. CONCURRENCES The Public Works Department and Sustainability and Natural Resources Official concur with the recommended action. ENVIRONMENTAL REVIEW The Orcutt Area Specific Plan and an associated Final Environmental Impact Report (FEIR) were approved and certified in March 2010. The Righetti Vesting Tentative Tract Map #3063 (VTM) was analyzed in a project-specific Initial Study/Mitigated Negative Declaration (IS/MND), which tiered off the 2010 FEIR. The VTM was approved and the IS/MND was adopted on May 19, 2015. Both the 2010 FEIR and subsequent IS/MND constitute the complete environmental determination for the project. Item 12 Packet Page 262 Approval of the final map is statutorily exempt under the California Environmental Quality Act (CEQA) pursuant to Section 15268(b)(3) Ministerial Projects (approval of final subdivision maps) of Title 14 of the California Code of Regulations (State CEQA Guidelines). Therefore, no further environmental review is required. FISCAL IMPACT Budgeted: N/A Budget Year: 2019-20 Funding Identified: Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund N/A 0 0 0 State Federal Fees Other: Total $0 $0 $0 $0 There is no direct financial impact to the City associated with approving the final map for Tract 3036-Phase 3. As previously discussed in this report, there is a City funding obligation towards construction of the Tank Farm Road/Orcutt Road roundabout via the credits or reimbursements from the Citywide and OASP Transportation Impact Fee programs. Staff is currently analyzing the timing of fees in conjunction with the non fair-share costs and Staff may recommend one-time funding to complete the project as part of the mid-year budget review. In addition, the public improvements that will be constructed with this phase will result in an increase in maintenance costs for the public streets, public utilities, open space, parks and other infrastructure upon acceptance of the improvements by the City. The costs associated with additional maintenance of parks, open space, and infrastructure, together with the additional employees needed to perform the maintenance are typically funded through the normal budget process. As the facilities are accepted and begin to require standard maintenance, resources will be requested in future Financial Plans to meet the need. Overall, the fiscal impact of development in the Orcutt Area Specific Plan was evaluated when the plan was adopted, and again when the General Plan was updated in 2014. An analysis prepared by Applied Development Economics (ADE) concluded that build-out of land uses in the General Plan will generate sufficient revenue to maintain existing levels of service throughout the community. Item 12 Packet Page 263 ALTERNATIVES Deny approval of the final map. Denying approval of the final map can apply if findings are made that the requirements or conditions of the tentative map have not b een met or performed (Section 66473 of the Subdivision Map Act) or if findings are made that the final map is not in substantial compliance with the previously approved tentative map (Section 66474.1 of the Subdivision Map Act). Since the final map is in substantial compliance with the tentative map, Sections 66474.1 and 66473 of the Subdivision Map Act require that City Council approve the map. Therefore, denying approval of the final map is not a recommended alternative unless the required findings are made. Attachments: a - Draft Resolution b - Vicinity Map TR 3063-Phase 3 c - COUNCIL READING FILE - Resolution 10619 (2015 Series) d - COUNCIL READING FILE - Resolution 10861 (2018 Series) e - COUNCIL READING FILE - Final Map f - Subdivision Agreement for Tract 3063 Phase 3 g - COUNCIL READING FILE - Resolution 10812 (2017 Series) h - COUNCIL READING FILE - Excerpted Pages from Tentative Map i - COUNCIL READING FILE - Tentative Map of all phases j - Ambient Communities PFFP letter dated June 28, 2017 Item 12 Packet Page 264 R _____ RESOLUTION NO. ______ (2020 SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, APPROVING THE FINAL MAP FOR TRACT 3063-PHASE 3 (3987 ORCUTT ROAD, FMAP-1959-2018) WHEREAS, the City Council made certain findings concerning the vesting tentative map for Tract 3063, as prescribed in Resolution No. 10619 (2015 Series); and WHEREAS, all the requirements, conditions and mitigation measures of said Resolution No. 10619 (2015 Series) that are applicable to Phase 3 are completed or appropriate securities will be in place prior to map recordation to guarantee their completion; and WHEREAS, the subdivider has completed all required subdivision improvements applicable to Phase 3 or will submit appropriate securities to guarantee installation of the required subdivision improvements as shown on the approved plans prior to map recordation, and all fees have been received or will be received prior to map recordation, as prescribed in the Subdivision Agreement; and WHEREAS, the Orcutt Area Specific Plan and an associated Final Environmental Impact Report (FEIR) were approved and certified in March 2010. The Righetti Vesting Tentative Tract Map #3063 (VTM) was analyzed in a project-specific Initial Study/Mitigated Negative Declaration (IS/MND), which tiered off the 2010 FEIR. The VTM was approved and the IS/MND was adopted on May 19, 2015. Both the 2010 FEIR and subsequent IS/MND constitute the complete environmental determination for the project. Approval of a final map is statutorily exempt under the California Environmental Quality Act (CEQA) pursuant to Section 15268(b)(3) Ministerial Projects (approval of final subdivision maps) of Title 14 of the California Code of Regulations (State CEQA Guidelines). NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1. The final map for Tract 3063-Phase 3 is found to be in substantial compliance with the tentative map. SECTION 2. The Subdivision Agreement for Tract 3063-Phase 3 is approved and the Mayor is authorized to approve minor revisions to the agreement and execute the document. SECTION 3. Approval of the final map for Tract 3063-Phase 3 is hereby granted. SECTION 4. The Mayor and City staff are authorized to take action necessary to carry out the intent of this resolution. Item 12 Packet Page 265 Resolution No. ______ (2020 Series) Page 2 R _____ SECTION 5. Environmental Review. The 2010 Final Environmental Impact Report for the Orcutt Area Specific Plan and the Initial Study/Mitigated Negative Declaration for Vesting Tentative Tract Map 3063 constitute the complete environmental determination for the project. Approval of a final map is statutorily exempt under the California Environmental Quality Act (CEQA) pursuant to Section 15268(b)(3) Ministerial Projects (approval of final subdivision maps) of Title 14 of the California Code of Regulations (State CEQA Guidelines). Upon motion of _______________________, seconded by ________________________, and on the following roll call vote: AYES: NOES: ABSENT: The forgoing resolution was adopted this ______ day of ______________ 2020. ____________________________________ Mayor Heidi Harmon ATTEST: ____________________________________ Teresa Purrington City Clerk APPROVED AS TO FORM: _____________________________________ J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, this ____________ day of __________________________, 2020. ____________________________________ Teresa Purrington City Clerk Item 12 Packet Page 266 Date: 10/2/2019 b - Vicinity Map – Tract 3063-Phase 3 Item 12 Packet Page 267 1 SUBDIVISION AGREEMENT THIS AGREEMENT is dated this __th day of ______ 20__ by and between Righetti NC, LLC, a Delaware limited liability company, herein referred to as "Subdivider," and the CITY OF SAN LUIS OBISPO, herein referred to as the "City." RECITALS REFERENCE IS HEREBY MADE to that certain proposed subdivision of real property in the City of San Luis Obispo, County of San Luis Obispo, State of California, a description of which is shown on the Final Map of Tract 3063-Phase 3, City of San Luis Obispo, California, as approved by the City Council on the ____ day of _________ 20__. The Subdivider desires that said Tract 3063-Phase 3 be accepted and approved as a Final Map pursuant to the Subdivision Regulations of the City of San Luis Obispo (Title 16 of the San Luis Obispo Municipal Code), and It is a condition of said regulations that the Subdivider agree to install the improvements as set forth on the plans therefore. TERMS AND CONDITIONS: In consideration of the foregoing, the Subdivider does hereby agree to construct and install the following subdivision improvements in accordance with said subdivision regulations, and in accordance with approved plans and specifications and any revisions thereto on file in the office of the City Engineer, City of San Luis Obispo, to wit: 1. CURB, GUTTERS AND SIDEWALKS 2. STREET BASE AND SURFACING 3. WATER MAINS and SEWER MAINS, including sewer laterals to the property line and water services to the curb stop. 4. LANDSCAPING Item 12 Packet Page 268 2 5. DRAINAGE STRUCTURES 6. STREET LIGHTS 7. ELECTRIC, GAS, TELEPHONE AND CABLE TELEVISION: In addition to the inspection and approval of such facilities by the City, each public utility shall be required to file a letter stating that the developer has properly installed all facilities to be provided by him, and that the said utility is prepared to provide service to residents upon request. 8. ANY & ALL OTHER IMPROVEMENTS shown on plans or required by project approvals. All of the above facilities shall be installed in the locations designated and to the plans and specifications on file and approved by said City Engineer. The lines and grades for all of said improvements shall be established by the Subdivider in accordance with said approved plans and specifications. The Subdivider agrees that the work of installing the above improvements shall begin within thirty (30) days from the date of recording of the Tract 3063-Phase 3 final map, and that the work shall be completed within twelve (12) months of said recording date, unless an extension has been granted by the City, provided that if completion of said work is delayed by acts of God or labor disputes resulting in strike action, the Subdivider shall have an additional period of time equivalent to such period of delay in which to complete such work. Any extension of time hereunder shall not operate to release the surety on the Improvement Security filed pursuant to this agreement. In this connection, the surety waives the provisions of Section 2819 of the Civil Code of the State of California. No building permits will be issued nor occupancy granted after the expiration date of the agreement until completion and acceptance of all subdivision improvements unless specifically approved by the City. Item 12 Packet Page 269 3 The Subdivider does also agree to comply with the conditions established by the City Council and has paid the necessary fees as indicated on the attached Exhibits 1 and 2. Setting of new survey monuments or resetting of disturbed monuments shall be in accordance with Article 5, paragraph 8771 et seq., of the Professional Land Surveyors Act, Chapter 15 of the Business and Professions Code of the State of California. The Subdivider attaches hereto, as an integral part hereof, and as security for the performance of this agreement, instrument(s) of credit or bond approved by and in favor of the City of San Luis Obispo, and conditional upon the faithful performance of this agreement. Said instrument of credit or bond is/are in the amount of $__________ shown in Exhibit 2, which is the amount of the estimated cost of said improvements. Subdivider agrees to remedy any defects in the improvements arising from faulty workmanship or materials or defective construction of said improvements occurring within twelve (12) months after acceptance thereof. In accordance with Sections 66499.7 and 66499.9 of the Government Code of the State of California, upon final completion and acceptance of the work, City will release all but 10% of the improvement security, that amount being deemed sufficient to guarantee faithful performance by the Subdivider of his obligation to remedy any defects in the improvements arising within a period of one year following the completion and acceptance thereof. Completion of the work shall be deemed to have occurred on the date which the City Council shall, by resolution duly passed and adopted, accept said improvements according to said plans and specifications, and any approved modifications thereto. Neither periodic nor progress inspections or approvals shall bind the City to accept said improvements or waive any defects in the same or any breach of this agreement. Item 12 Packet Page 270 4 “AS-BUILT” record drawings are to be submitted within four weeks of completion of construction and prior to City acceptance of the public improvements. If the Subdivider fails to complete the work within the prescribed time, the Subdivider agrees that City may, at its option, declare the instrument of credit or bond which has been posted by Subdivider to guarantee faithful performance, forfeited and utilize the proceeds to complete said improvements, or city may complete said improvements and recover the full cost and expense thereof from the Subdivider or his surety. The Subdivider has deposited with the City a labor and materials surety or sureties in the amount of 50% ($___________) of the above described subdivision improvements in accordance with State law. Said Subdivider shall pay an inspection fee for City to inspect the installation of said subdivision improvements, and to verify that they have been completed in accordance with the plans and specifications. If off-site dedication of property is necessary to facilitate the construction of the required subdivision improvements, the subdivider shall exhaust all avenues available to acquire said off-site dedication. In the event the subdivider is unable to acquire said property, the City may lend the subdivider its powers of condemnation to acquire the off-site dedication, including any necessary construction, slope, and drainage easements. The Subdivider shall pay for all costs incurred by the City to acquire the off-site dedication, including, but not limited to, all costs associated with condemnation through the condemnation process. Prior to proceeding with the condemnation process, the Subdivider shall deposit with the City all or a portion of the anticipated costs, as determined by the City Attorney, of the condemnation proceedings. The City does not and Item 12 Packet Page 271 5 cannot guarantee that the necessary property rights can be acquired or will, in fact, be acquired. All necessary procedures of law would apply and would have to be followed. Title 16 of the San Luis Obispo Municipal Code, entitled "Subdivision," all plans and specifications on file with said City Engineer as a part of said Subdivision Map, and all other documents filed with the City by the Subdivider and approved by the City Engineer are hereby referred to for further particulars in interpreting and defining the obligations of the Subdivider under this agreement. Pursuant to Government Code Section 66474.9(b), the subdivider shall defend, indemnify and hold harmless the City and/or its agents, officers and employees from any claim, action or proceeding against the City and/or its agents, officers or employees to attack, set aside, void or annul, the approval by the City of this subdivision, and all actions relating thereto, including but not limited to environmental review (“Indemnified Claims”). The City shall promptly notify the subdivider of any Indemnified Claim upon being presented with the Indemnified Claim and City shall fully cooperate in the defense against an Indemnified Claim. It is understood and agreed by and between the Subdivider and the City hereto that this agreement shall bind the heirs, executors, administrators, successors and assigns of the respective Parties to this agreement. It is agreed that the Subdivider will furnish copies of the successful bidder's contract unit prices and total bid prices for all of the improvements herein referred to. Item 12 Packet Page 272 6 IN WITNESS WHEREOF, this agreement has been executed by: SUBDIVIDER RIGHETTI NC LLC, a Delaware limited liability company By: Righetti Ranch, LP, a Delaware limited partnership Its: Sole Member By: NRE Manager LLC, a Delaware limited liability company Its: General Partner By: Ambient Righetti Manager, LLC, a California limited liability company Its: Sole Member By: _____________________________ Print Name: __________________ Title: _______________________ By: _____________________________ Print Name: __________________ Title: _______________________ CITY OF SAN LUIS OBISPO MAYOR Heidi Harmon ATTEST: CITY CLERK Teresa Purrington APPROVED AS TO FORM: CITY ATTORNEY Christine Dietrick Item 12 Packet Page 273 7 EXHIBIT 1 TRACT 3063-PHASE 3 SUBDIVISION AGREEMENT 1. The Subdivider has deposited a monumentation security in the amount of $________ to guarantee the installation of survey monuments in accordance with the approved map and payment for same. Said guarantee will be released once the installation of monuments has been verified and that existing monuments have not been disturbed, and upon receipt by the City of a letter from the Surveyor indicating that they have completed the work and have been paid. Subdivider shall adhere to the requirements of California Business and Professions Code Section 8771 with regards to monument preservation. The monumentation security also guarantees the replacement of any monuments that were disturbed during construction, along with filing of Records of Survey or Corner Records required by said Section 8771. 2. Plancheck and inspection fees for the subdivision improvements have been paid as listed in the attached Exhibit 2. 3. Park-in-lieu fees will be paid at time of issuance of building permit per the fee schedule in effect at the time the Vesting Tentative Map was approved (adjusted for CPI increases), unless the vesting rights have expired as set forth in Government Code Section 66498.5(b) through (d). If the vesting rights have expired, the fees shall be paid at the rate in effect at time of building permits. Credit is available to subdivider for dedication of approved parkland. 4. Water and sewer impact fees shall be paid at time of building permits through the Community Development Department per the fee schedule in effect at the time the Vesting Tentative Map was approved (adjusted for CPI increases), unless the vesting rights have expired as set forth in Government Code Section 66498.5(b) through (d). If the vesting rights have expired, the fees shall be paid at the rate in effect at time of building permits. 5. Transportation impact fees shall be paid at time of building permits through the Community Development Department per the fee schedule in effect at the time when the Vesting Tentative Map was approved (adjusted for CPI increases), unless the vesting rights have expired as set forth in Government Code Section 66498.5(b) through (d). If the vesting rights have expired, the fees shall be paid at the rate in effect at time of building permits. 6. The subdivider shall comply with all requirements of Council Resolution No. 10619 (2015 Series) approving the tentative map, and Council Resolution No. 10861 (2018 Series) amending the conditions and mitigation measures. 7. The Subdivider has elected to pay a roadway maintenance fee to satisfy Condition #49. The fee of $____________ was approved by the City Engineer in accordance with City Engineering Standards and guidelines and satisfies the requirements of Condition #49. The Subdivider will be required to review this condition with the City Engineer upon each subsequent phase of development to determine if additional fees, testing, or pavement repair will be required as a result of impacts from future phases. Item 12 Packet Page 274 8 EXHIBIT 2 TRACT 3063-PHASE 3 - FEE AND BOND LIST 3987 Orcutt Amount Form Date Received Bond Release Status Bonds and Guarantees: Faithful Performance to guarantee construction and completion of the subdivision improvements (FMAP-1955- 2018) $3,934,156 xxx xxx Can be released upon City acceptance of improvements, deposit of one-year warranty surety, and approval of record drawings. Labor & Materials (50% of total cost of above improvements) (FMAP-1955- 2018) $1,967,078 xxx xxx Can be released 90 days after acceptance of improvements, if no claims. (Civil Code Section 8412) Faithful Performance to guarantee construction and completion of the Tank Farm/Orcutt Road Construction Phase 3 Improvements (FMAP-1718-2015) $1,131,932 (Pending) xxx xxx Labor & Materials (50% of total cost of above improvements) (FMAP-1718- 2015) $565,966 (Pending) xxx xxx Offsite Water Main Extension (FMAP-2242-2015/ FMAP-4024-2016) See Tract 3063 Phase 1 $775,000 Bond 4/3/18 Transferred from Tract 3063 Phase 1 Monument Guarantee $TBD xxx xxx Can be released upon verification that monuments have been set and surveyor has been paid. 10% Warranty $506,609 xxx To be collected prior to release of Faithful Performance Bond Can be released one-year after acceptance of improvements, if no defects, and approval of record drawings. Fees: Map Check Fee $20,811.25 Check 10/26/18 Paid in Full 10-26-18 Item 12 Packet Page 275 9 Plan Check Fee (Fmap-1955-2018) $48,065.92 xxx xxx Deposit of $25,000 made on 10-25-18 TBD Construction Inspection Fee $138,080.71 xxx xxx TBD Leave blank for miscellaneous Roadway Maintenance Fee $_______ xxx xxx Deposit in Acct # 40050300-90346953 Streets Reconstruction and Resurfacing Master per Matt Horn Park In-Lieu Fee1 To be collected with building permit. Credit to be given for approved parkland dedication. Affordable Housing Requirements See Affordable Housing Agreement Water Impact Fee1 To be collected with building permit Wastewater Impact Fee1 To be collected with building permit Transportation Impact Fee1 To be collected with building permit 1 All Impact Fees are adjusted annually (July 1) based on CPI. Credit given for demolished units. Item 12 Packet Page 276 Item 12 Packet Page 277 Item 12 Packet Page 278 Item 12 Packet Page 279 Page intentionally left blank. Item 12 Packet Page 280