HomeMy WebLinkAboutREDbochumb1Potential Phase Criteria for Phase I -*Full Signa l
Draft
RED FIL E
MEETING AGENDA
DATES,//'lo ITEM #/
/01 C'P 1
min/___
'COUNCIL a'CDD DI R
ru6/Z [3-FIN DI R
E AGAeA -ar/rn6e.aFIRE CHIE F
[3-ATTORNEY EE PW DI R
`a-CLERK/ORI G
7 DEPT HEADS~.p«3
NC-to-n tn6„S
9-POLICE CH F
CfiREC DI R
E'1UTIL DI R
C KR DIR
L~Z'iCCriteriaSampling Periods Action Rationale
Transition from Phase I to Full Signa l
Right angle Collisions 5 right angle collisions in a twelve month
period; or,
3 within a 6 month period
Ongoing If 3 or more collisions staff wil l
review location to mak e
corrective measures if identified ,
if 5 or more that are correctibl e
by signal, implement Ful l
signalization
3 or more in six months is proactive in nature and i s
the minimum amount to list in the Annual Traffi c
Safety Report. 5 collisions would require som e
form of mitigation pursuant to MUTCD.
Significant imbalance of
Madonna/LOVR left tom lanes
The #1 WB Left turn lane A t
Madonna/LOVR is blocked by queue d
vehicles 5 or more times in a peak period
City to sample every 3 month s
on a Tuesday or Wednesday
starting 3 months after initial
improvements completed.
City to consider making stripin g
conversion to have the two WB
left turn lanes trap into the dua l
left turn lanes at Madonna/LOVR
If imbalanced flow occurs, no signal alternative wil l
improve access from LVSC driveway into turn
lanes
One or more of the following in conjunction with each other or other agreed upon criteria by ATE and the City (example : available gaps). It is likely that a combination of the following would indicate th e
need for a signal at the location however, if one criteria is significantly exceeded it may be a basis, in and of itself, to move forward to phase II :
Signal Warrant Criteria Driveway volumes and Madonna Roa d
conditions maintain satisfaction of one o r
more warrant criteria Both urban and rura l
warrants will be reviewed .
12 month review . Volumes wil l
be collected on an averag e
Wednesday and Thursday for
review with Wednesday bein g
the default study day .
Review other measures under
this section and gap analysis,
Driveway needs to maintain characteristics tha t
need signalization in order to justify additiona l
delay and other issues along Madonna Road an d
LOVR.
Vehicles stacked past the driveway from
Madonna/LOVR
Queues from Madonna/LOVR stacked pas t
the driveway 6 or more times in any pea k
period on an average day .
Sample at 6 months with full
review at 12 month review .
Volumes will be collected on a n
average Wednesday and
Thursday for review wit h
Wednesday being the default
study day .
Review driveway delay an d
queue lengths to determine i f
queues from Madonna/LOVR ar e
affecting driveway performanc e
for left/thru vehicles .
6 or more times is roughly 20% of a 120 secon d
signal cycle length that would be required if
driveway is signalize d
LVSC Excessive Queue Length Queue length of 6 or more left turn/ thr u
vehicles stacked in the driveway for greate r
than 90 seconds and unable to access gap s
available on Madonna twice or more durin g
a peak period on an average day
Sample at 6 months with full
review at 12 months, annually
thereafter
Review driveway delay ho w
much peaking is occurring in th e
driveway. Investigate alternative s
if possible . Implement Phase I I
option
Threshold is slightly below signal queue length s
and delay that has been simulated
LVSC Excessive delay 50 second/vehicle average delay fo r
left/thru LVSC driveway egress vehicle s
calculated by actual (not estimated )
methodology
12 month review, annually
thereafter
implement full signal ATE has forecast up to 100 sec/vehicle delay i f
driveway is not signalized . 50 sec/veh is 50% o f
that forecast.
Also, 50 sec/veh average is slightly above LOS D/E
cusp (55 sec/veh avg) that is City threshold fo r
signal ization (however, that would be for the entir e
intersection). 50 sec/vehicle is also the uppe r
threshold of LOS E for unsignalized locations .
RECEIVE D
MAR 16 201 0
SLO CITY CLERK
Potential Phase Criteria for Phase II -*Half Signal
Draft
Transition from Full Signal to half
Signal
Criteria Sampling Periods Action Rationale
Collisions Rear end or angle collisions increases tha t
occur are higher than existing . (3 rear end
or angles in a six month period or 5 in a
twelve month period)
Ongoing Convert to Half Signa l
alternative (immediate)
Full signal alternative should not degrade collisions
below current conditions. Half Signal will remov e
potential for rear ends in EB direction .
EB Left turn Lane volumes excee d
storage length for LVSC driveway
approach
Queues from left turn vehicles excee d
storage length and stack into the #1 EB thru
lane on Madonna more the 2 times in a pea k
period or over the course of the day .
Ongoing with City to sampl e
every 3 months on a Tuesday o r
Wednesday starting 3 month s
after Phase II completed.
1) Convert to Half Signa l
Alternative, or
2) Remove left turn lane into th e
center and maintain full signal .
The full signal alternative can not break dow n
operations along Madonna Road . Timing
alternatives at this location are limited due t o
additional delay to Madonna and LOVR .
EB "Pass Through" vehicles o n
Madonna at driveway
2 or more observed "Pass through" of E B
vehicles that violate the red indication at the
full signal approach during any hour perio d
of day.
Ongoing . Every 3 months after
Phase II improvements are
completed .
Convert to half signal.Violations of signal indications may indicate drive r
inabilities to observe signal indications in time t o
make necessary decisions for stop conditions.
Vehicle/Pedestrian Conflicts 2 or more EB or WB vehicle/pedestria n
conflicts observed during any period wher e
either the pedestrian or vehicle violates the
red indication .
Sampled at 3 months intervals
after Phase II improvements ar e
completed . 12 month afte r
report.
Ongoing thereafter .
Consider removing pedestria n
crossing.
If EB vehicle violations, conver t
to half signal .
Vehicle/Pedestrian conflicts would need immediat e
remediation at the locatio n
Emergency Access impairment Fire Station #4 or other emergency respons e
hindered by congestion and queues alon g
Madonna Roa d
Determination of effect at sole discretion o f
Fire Department.
Ongoing .Implement Half signal .
If problem persists, may need t o
remove all signalization at
location .
Significant impairment to emergency response ca n
not be allowed .
Neighborhood Traffic Intrusion Complaint increase by north or south
Oceanaire neighborhoods that cut throug h
traffic has increased .
Ongoing Center may pay to augmen t
existing PD resources to enforce
speed the areas or other NTM
devices.
If problem persists, implemen t
half signal.
The full signal may cause diversion into th e
neighborhoods and should be mitigated by the
center.
Note : LVSC will be consulted of any determination by the City that conversion of a the full signal to '/z signal is necessary . In the event that staff
determines that further less extensive modifications or revisions can not resolve certain criteria/problems that develop, then at the direction of Council ,
LVSC shall convert the full traffic signal to median half signal . LVSC may review this determination and recommend to staff and Council alternatives ,
if any, that may mitigate problematic issues . Coucnil determination on this issue will be final .