Loading...
HomeMy WebLinkAboutc4clarifierfacilitypaintingprojectcounci l j acEn6a uEpol2t C I T Y O F S A N L U I S O B I S P O FROM : Jay D . Walter, Director of Public Work s Prepared By :Bridget Fraser, Senior Civil Engineer 0 ~ SUBJECT : WATER RECLAMATION FACILITY : CLARIFIER 5 AND FACILIT Y MAINTENANCE PAINTING PROJECT; SPECIFICATION NO . 9100 1 RECOMMENDATIO N 1.Approve the plans and specifications for "Water Reclamation Facility : Clarifier 5 & Facility Maintenance Painting Project, Specification No. 91001" and authorize staff to advertise for bids . 2.Authorize the City Manager to award the contract if the lowest responsible bid is withi n Engineer's Estimate of $250,000 . DISCUSSIO N This project involves maintenance painting of six areas at the Wastewater Reclamation Facilit y (WRF). More specifically, work will involve cleaning, surface preparation, and recoating of : 1.Clarifier 5 ; 2.Chlorine contact station ; 3.Plant drainage pumping statio n 4. Filter building piping ; 5.Cooling tower station ; and 6. Equalization pond control structure . This project must occur during a time when flows at the facility are at their lowest . During low-flo w periods, one of the two final clarifiers can be taken out of service and the plant can still proces s incoming flows and remain compliant with discharge requirements . Flows at the facility are lowes t during the summer months when the California Polytechnic University is out of session and th e City's population is reduced. Most WRF projects are scheduled to occur during this time period . Clarifier No . 5 Coating Clarifier No . 5 was originally constructed in 1994 as part of a major upgrade to the WRF . After 1 6 years of service, the protective coatings on the walls and equipment are showing signs o f deterioration . The deteriorated coatings need to be replaced to protect the underlying surfaces fro m deterioration and structural damage that would require more costly repairs or replacement . Sacrificial anodes will be installed to provide added protection to the submerged mechanica l equipment . Facility Maintenance Paintin g The WRF has been constructed in phases over the years with major expansions and upgrade s occurring in 1941 through the most recent in 1994 . Facility piping and equipment can be anywher e Meeting Date April 6, 2010 Item NumIer Clarifier 5 and Facility Maintenance Painting Project Page2 from 16 to 70 years old . Much of this equipment is showing signs of rust and corrosion . This is not surprising due to the generally corrosive environment of the facility . Routine cleaning and recoatin g of the facility is essential to slow the rate of corrosion and deterioration of the structures . Recognizing this, WRF staff implemented an annual maintenance painting program to provid e routine painting of these facilities . Areas in need of painting have been identified and prioritized b y WRF staff. Three areas were taken care of in last year's maintenance painting project . Five additional areas will be addressed with this project . Bid Alternates-Award of Contrac t Timing of this project is critical . In order to complete the clarifier coating before students return mid - September the work must begin in early summer . However, if bids come in higher than expecte d requiring staff to return to Council for an award, work would not begin until mid to late July . In thi s case, the contractor will not have enough time to complete the work before students return . To stay on track, it is essential that the City Manager award the contract as this would cut off nearly a mont h of processing time allowing the work to begin early to mid June . To accommodate this, two of th e painting sites are being bid as additive alternates to allow flexibility in awarding a project. Staff recommends that the contract be awarded by the City Manager including or eliminating the bi d alternates, as needed, to keep the award within the Engineer's Estimate of $250,000 . CONCURRENCE S The Utilities Department has reviewed and approved this project . FISCAL IMPACT The Clarifier No . 5 coating and the maintenance painting projects are identified in the 2009-1 1 Financial Plan on pages 3-133 to 3-137 of Appendix B . In the 2009-2010 project list, $175,000 i s identified for cleaning, repairs, and recoating of Clarifier No . 5 and $100,000 is identified fo r maintenance painting for a total budget of $275,000 . The estimated project costs are shown below : Estimated Project Costs : Design Phase Costs $7,00 0 Printing/Misc . $1,00 0 Construction Costs : Clarifier 5 Coating & Repairs (Base) $ 175,00 0 Chlorine Contact Station Coating (Base) $ 25,00 0 Plant Drainage Pumping Station Coating (Base) $ 10,00 0 Fitler Building Piping (Base) $ 5,00 0 Cooling Tower Station Coating (Alt) $ 25,00 0 Equalization Pond Control Strucutre Coating (Alt) $ 10,00 0 Total Engineer's Estimate $250,00 0 Contingencies @ 15%$38,00 0 Construction Management/Inspection @ 15% $38,00 0 Total Estimated Project Costs : $334,000 e..4 Clarifier 5 and Facility Maintenance Painting Project Page 3 The estimated total project cost of $334,000 exceeds the budget of $275,000 . For the most part thi s is due to costs for construction management and higher-than-normal construction contingencie s (15% rather than 10% due to a high potential for unknowns). However, given the competitiv e bidding climate, it is possible that bids could come in lower than the Engineer's Estimate . Due to the specialized nature of industrial coatings work it is recommended that inspection an d construction management be handled by Advantage Technical Services, one of the City's on-cal l inspection firms specializing in industrial coatings work . A work order for this work will be issue d under their current contract . Funding for this project is available in the Water Reclamation Facility Major Equipment Replacemen t Master account which has a current balance of $1,274,809 . At time of award, funds will b e transferred from the Master account to this project's accounts via a budget amendment request . ALTERNATIV E Defer the Project The City Council could choose to deny or defer contract award for the WR F maintenance projects . Staff does not recommend this option due to the advanced age and conditio n of equipment at the facility . If corrosion is allowed to continue, the facility equipment an d components will continue to deteriorate to the point of requiring more costly replacement or repair . ATTACHMEN T Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFIC E Specification s T :\Council Agenda Reports\Public Works CAR\2U10\CIF\91001 Clarifier 5-Facility Maintenance Painting \91U01 CAR Adv Cianrier 5- Painting .doc ATTACHMENT llqr" rn gs oBspo Public Works Departmen t 919 Palm Street, San Luis Obispo, CA 93402 CITY MAP CLARIFIER 5 COATING & FACILIT Y MAINTENANCE PAINTING PROJECT SPECIFICATION NO . 91001 SHEET 117 -0417 0 CITY OF SAN LUIS OBISP O WATER RECLAMATION FACILIT Y 35 PRAM ROAD