Loading...
HomeMy WebLinkAboutDiaries & Notes_Daily Papich South Broad Improvements 8-5-19 1 1 19:00:00 1 9 1 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 9 9 2 9 1 9 1 9 1 9 1 9 4 9 18 9 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Signature: Title: Engineer Inspector Materials: Start Stop Date Doug Nelms South Broad Street Improvements Sal Cervantes Labor Ismeal Moldenaldo Labor Paul Chavez Labor Saltero Lopez Labor Mark Beery - truck Operator Eddie Mc Caa - truck Operator 5:00:00am Skip & Drag Anthony Labor Daniel TC Mini Cat skister Water trucks Kenny W Operator Rudy Operator Becky Operator Eddie R Operator Cheeto Truck Driver Grinder 7' RX-700 Grinder 12' RX -60C Cat Loader 930G w- broom 4 ton TC Truck X Broom Sweeper Light Towers Bottom Trucks Rentals grind Weather: 70's </ 7:00 pm Contractor is setting up TC for grinding operations. 8:00 pm Contractor started grinding at the airport number 2 north bound lane. The 12' grinder is not operating properly. Contractor informed me the belts are slipping and causing the grinder to grind much slower. 11:00 pm Mark Informed me they are looking for another grinder for tomorrow. I also spoke with Mark about more lighting needed on site. I asked for 6 more light towers total of 10. Mark & Steve also informed me the 2" grind will not be completed tonight and plans to grind 2" again tomorrow night. 6:00 am Contractor picked up TC and signal lights are operating