HomeMy WebLinkAboutDiaries & Notes_Daily Papich South Broad Improvements 8-5-19
1
1
19:00:00
1
9
1
1
9
1
9
1
9
1
9
1
9
1
9
1
9
1
9
1
9
1
9
1
9
1
9
1
9
9
9
2
9
1
9
1
9
1
9
1
9
4
9
18
9
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Signature:
Title: Engineer Inspector
Materials:
Start
Stop
Date
Doug Nelms
South Broad Street Improvements
Sal Cervantes Labor
Ismeal Moldenaldo Labor
Paul Chavez Labor
Saltero Lopez Labor
Mark Beery - truck Operator
Eddie Mc Caa - truck Operator
5:00:00am
Skip & Drag
Anthony Labor
Daniel TC
Mini Cat skister
Water trucks
Kenny W Operator
Rudy Operator
Becky Operator
Eddie R Operator
Cheeto Truck Driver
Grinder 7' RX-700
Grinder 12' RX -60C
Cat Loader 930G w- broom
4 ton TC Truck
X Broom Sweeper
Light Towers
Bottom Trucks
Rentals
grind
Weather: 70's </
7:00 pm Contractor is setting up TC for grinding operations.
8:00 pm Contractor started grinding at the airport number 2 north bound lane. The 12' grinder is not operating properly. Contractor informed me the belts are slipping and causing the
grinder to grind much slower.
11:00 pm Mark Informed me they are looking for another grinder for tomorrow. I also spoke with Mark about more lighting needed on site. I asked for 6 more light towers total of 10.
Mark & Steve also informed me the 2" grind will not be completed tonight and plans to grind 2" again tomorrow night.
6:00 am Contractor picked up TC and signal lights are operating