EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Signature:
Title: Engineer Inspector
Materials:
Start
Stop
Date
Doug Nelms
South Broad Street Improvements
Sal Cervantes Labor
Ismeal Moldenaldo Labor
Paul Chavez Labor
Saltero Lopez Labor
Mark Beery - truck Operator
Eddie Mc Caa - truck Operator
5:00:00am
Skip & Drag
Anthony Labor
Daniel TC
Mini Cat skister
Water trucks
Kenny W Operator
Rudy Operator
Becky Operator
Eddie R Operator
Cheeto Truck Driver
Grinder 7' RX-700
Grinder 12' RX -60C
Cat Loader 930G w- broom
4 ton TC Truck
X Broom Sweeper
Light Towers
Bottom Trucks
Farivanti Grinder
grind & pave
Rollers
Rubber tire roller
Paver w winrow
Geosulations
G3
Weather: 57</
Rentals Speeds Trucking
7:00 pm Contractor is setting up TC for grinding operations.
8:00 pm Contractor started grinding at the airport number 16' south bound lane heading twards Tank Farm Road Farrivanti is on site with his 7' grinder. Papish's grinder blew a hydrolic
hose and was down for 2 hours. which delayed paving operations.
8:30 pm Geo techs are on site.
10;30 pm I spoke with Mark & Steve regarding where they wanted to stop paving due to the delay. We all agreed to stop short of Tankfarm to keep gas station D/W open.
Geo techs informed me compaction test are at 94.5 to 97.
7:30 am Contractor is starting to pick up TC.