Loading...
HomeMy WebLinkAboutDiaries & Notes_Daily Papich South Broad Improvements 8-7-19 1 1 8/7/2019 19:00:00 1 12 1 1 12 1 12 1 12 1 12 1 12 1 12 1 12 1 12 1 12 1 12 1 12 1 12 1 12 12 12 2 12 1 12 1 12 1 12 1 12 4 12 19 12 1 1 2 12 1 1 1 8 1 1 8 1 12 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Signature: Title: Engineer Inspector Materials: Start Stop Date Doug Nelms South Broad Street Improvements Sal Cervantes Labor Ismeal Moldenaldo Labor Paul Chavez Labor Saltero Lopez Labor Mark Beery - truck Operator Eddie Mc Caa - truck Operator 5:00:00am Skip & Drag Anthony Labor Daniel TC Mini Cat skister Water trucks Kenny W Operator Rudy Operator Becky Operator Eddie R Operator Cheeto Truck Driver Grinder 7' RX-700 Grinder 12' RX -60C Cat Loader 930G w- broom 4 ton TC Truck X Broom Sweeper Light Towers Bottom Trucks Farivanti Grinder grind & pave Rollers Rubber tire roller Paver w winrow Geosulations G3 Weather: 57</ Rentals Speeds Trucking 7:00 pm Contractor is setting up TC for grinding operations. 8:00 pm Contractor started grinding at the airport number 16' south bound lane heading twards Tank Farm Road Farrivanti is on site with his 7' grinder. Papish's grinder blew a hydrolic hose and was down for 2 hours. which delayed paving operations. 8:30 pm Geo techs are on site. 10;30 pm I spoke with Mark & Steve regarding where they wanted to stop paving due to the delay. We all agreed to stop short of Tankfarm to keep gas station D/W open. Geo techs informed me compaction test are at 94.5 to 97. 7:30 am Contractor is starting to pick up TC.