8/9/2019
19:00:00
1
10
1
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
10
10
2
10
1
10
1
10
1
10
1
10
4
10
19
10
1
1
8
2
10
1
1
1
8
1
1
8
1
1
8
1
12
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Signature:
Title: Engineer Inspector
Materials:
Start
Stop
Date
Doug Nelms
South Broad Street Improvements
Sal Cervantes Labor
Ismeal Moldenaldo Labor
Paul Chavez Labor
Saltero Lopez Labor
Mark Beery - truck Operator
Eddie Mc Caa - truck Operator
5:00:00am
Skip & Drag
Anthony Labor
Daniel TC
Mini Cat skister
Water trucks
Kenny W Operator
Rudy Operator
Becky Operator
Eddie R Operator
Cheeto Truck Driver
Grinder 7' RX-700
Grinder 12' RX -60C
Cat Loader 930G w- broom
4 ton TC Truck
X Broom Sweeper
Light Towers
Bottom Trucks
Farivanti Grinder
grind & pave
Rollers
Rubber tire roller
Paver w winrow
Geosulations
G3
Weather: 57</
Rentals Speeds Trucking
Burke rental
D38
mechanic
7:00 pm Contractor is setting up TC for grinding operations.
8:00 pm Contractor started grinding at Tank Farm twards Airport number center lanes 16' south bound lane.
9:30 pm Geo techs are on site.
10:30 pm HMA arrived on site.
Contractor called me at 1:00 am grinder hit 4" conduity at Airport Drive . I directed contractor to cover conduit with pbase and pave over it. Wire was not damaged signal is operating
correctly after I tested signal cycle.
4:15 am contractor completed paving operations. Airport enterance was not closed at any time tonight.
4:30 contractor is placing temp striping and cleaning up site for the weekend