Loading...
HomeMy WebLinkAbout09-02-2020 PRC Agenda PacketCity of San Luis Obispo, Agenda, Planning Co mmission Agenda PARKS AND RECREATION COMMISSION SEPTEMBER 2, 2020 PARKS AND RECREATION COMMISSION Based on the threat of COVID-19 as reflected in the Proclamations of Emergency issued by both the Governor of the State of California, the San Luis Obispo County Emergency Services Director and the City Council of the City of San Luis Obispo as well as the Governor’s Executive Order N -29-20 issued on March 17, 2020, relating to the convening of public meetings in response to the COVID-19 pandemic, the City of San Luis Obispo will be holding all public meetings via teleconference. There will be no physical location for the Public to view the meeting. Below are instructions on how to view the meeting remotely and how to leave public comment. Additionally, members of the Parks and Recreation Commission are allowed to attend the meeting via teleconference and to participate in the meeting to the same extent as if they were present. Using the most rapid means of communication available at this time, members of the public are encouraged to participate in Commission meetings in the following ways: 1. Remote Viewing - Members of the public who wish to watch the meeting can view: • View the Webinar (recommended for the best viewing quality): o Registration URL https://attendee.gotowebinar.com/register/7025988562346785295 o Webinar ID 332-147-467 o Telephone Attendee: (562)247-8422; Audio Access Code: 969-887-658 2. Public Comment - The City Council will still be accepting public comment. Public comment can be submitted in the following ways: • Mail or Email Public Comment o Received by 3:00 PM on the day of meeting - Can be submitted via email to advisorybodies@slocity.org or U.S. Mail to City Clerk at 990 Palm St. San Luis Obispo, CA 93401. All emails will be sent to Commissioners and saved as agenda correspondence however we cannot guarantee emails received after 3:00 PM on the day of the meeting we be sent out to Commission or uploaded to the website prior to the meeting starting. • Verbal Public Comment o In Advance of the Meeting - Call (805) 781-7164; state and spell your name, the agenda item number you are calling about and leave your comment. The verbal comments must be limited to 3 minutes. All voicemails will be forwarded to the Council Members and saved as Agenda Correspondence. Voicemails will not be played during the meeting. o During the meeting – Joining the webinar (instructions above). Once the meeting has started please put your name and the item # you would like to speak on in the questions box. During public comment for the item your name will be called, and your mic will be unmuted. Contact the office of the City Clerk at cityclerk@slocity.org for more information. All Comments/Correspondence received will be saved as part of the record for the meeting. Parks and Recreation Committee Agenda for September 2, 2020 2 | P a g e Wednesday, September 2, 2020 5:30 p.m. SPECIAL MEETING Via Webinar CALL TO ORDER: Chair Rodney Thurman ROLL CALL : Commissioners Kari Applegate, Rick Blair, Sommer Sheffield, Adam Stowe, Andrew Webber, Vice Chair Robert Spector, and Chair Rodney Thurman ABSENT: PUBLIC COMMENT: At this time, people may address the Committee about items not on the agenda. Persons wishing to speak should come forward and state their name and address. Comments are limited to three minutes per person. Items raised at this time are generally referred to staff and, if action by the Committee is necessary, may be scheduled for a future meeting. CONSIDERATION OF MINUTES 1. Minutes of the Parks and Recreation Committee of July 8, 2020 CONSENT ITEMS BUSINESS ITEMS 2. Parks and Recreation Master Plan and General Plan Element Update (Scott – 45 minutes) Recommendation: 1. Review, discuss, and provide comments on the Master Plan Draft Capital Improvement Program and Operational Cost Tables. SUBCOMMITTEE LIAISON REPORTS & COMMUNICATIONS Parks and Recreation Committee Agenda for September 2, 2020 3 | P a g e 3. Subcommittee Liaison Reports (Chair) – 15 minutes) a. Adult and Senior Programming: Commissioner Spector b. Active Transportation Committee: Commissioner Webber c. City Facilities (Fields, Golf, Pool, & Joint Use Facilities): Commissioner Applegate d. Jack House Committee: Vacant e. Tree Committee: Commissioner Thurman f. Youth Sports Association: Commissioner Stowe 4. Directors’ Report (Avakian - 15 minutes) 5. Communication ADJOURNMENT To the meeting of the Parks and Recreation Committee as approved by the PRC to Wednesday , October 7 , 2020, at 5:30 p.m., via Webinar. The City of San Luis Obispo wishes to make all of its public meetings accessible to the public. Upon request, this agenda will be made available in appropriate alternative formats to persons with disabilities. Any person with a disability who requires a modification or accommodation in order to participate in a meeting should direct such request to t he Parks and Recreation Department at (805) 781-7300 at least 48 hours before the meeting, if possible. Telecommunications Device for the Deaf (805) 781-7107. Meeting audio recordings can be found at the following web address: http://opengov.slocity.org/WebLink/1/fol/61014/Row1.aspx DRAFT Minutes – Parks and Recreation Commission Meeting of July 8, 2020 Page 1 Minutes - DRAFT PARKS AND RECREATION COMMISSION Wednesday, July 8, 2018 Special Meeting of the Parks and Recreation Commission CALL TO ORDER A Special Meeting of the San Luis Obispo Parks and Recreation Commission was called to order on Wednesday, July 8, 2020 at 5:30 p.m. via telelconference by Chair Thurman. ROLL CALL Present: Commissioners Kari Applegate, Rick Blair, Sommer Sheffield, Andrew Webber, Vice Chair Robert Spector, and Chair Rodney Thurman Absent: Commissioner Adam Stowe Staff: Parks and Recreation Director Greg Avakian and City Clerk Teresa Purrington PUBLIC COMMENT ITEMS NOT ON THE AGENDA None --End of Public Comment-- APPROVAL OF MINUTES 1. Consideration of Minutes of the Parks and Recreation Commission Meeting of March 4, 2020. ACTION: UPON MOTION BY VICE CHAIR SPECTOR, SECONDED BY COMMISSIONER WEBBER, CARRIED 4-0-1-1 (COMMISSIONER STOWE ABSENT AND CHAIR THURMAN ABSTAINING,) the Parks and Recreation Commission approved the Minutes of the Regular Parks and Commission Meeting of March 4, 2020, as presented. BUSINESS ITEMS 2. Parks and Recreation Master Plan and General Plan Element Update Senior Planner Shawna Scott, Recreation Manager Devin Hyfield and Parks and Recreation Director Greg Avakian provided a PowerPoint presentation and responded to Commission inquiries. DRAFT Minutes – Parks and Recreation Commission Meeting of July 8, 2020 Page 2 Public Comment None --End of Public Comment-- ACTION: No action taken recommendation was to receive presentation and provide comments. Commission recessed at 7:13 PM and reconvened at 7:21 PM with all Commissioners present. 3. Parks and Recreation Division Update during COVID-19 March – June 2020 Parks and Recreation Director Greg Avakian provided a PowerPoint presentation and responded to Commission inquiries. Public Comment None --End of Public Comment-- ACTION: No action taken recommendation was to receive presentation. SUBCOMMITTEE LIAISON REPORTS 4. Subcommittee Liaison Reports – No reports provided. a. Adult and Senior Programming: Commissioner Spector b. Active Transportation Committee: Commissioner Webber c. City Facilities (Fields, Golf, Pool, & Joint Use Facilities): Commissioner Applegate d. Jack House Committee: Vacant e. Tree Committee: Commissioner Thurman f. Youth Sports Association: Commissioner Stowe UPDATES 5. Director Report Parks and Recreation Director Avakian provided a brief update of current Parks and Recreation programming. ADJOURNMENT The meeting was adjourned at 8:27 p.m. The next Regular Parks and Recreation Commission meeting is scheduled for Wednesday, September 2, 2020 at 5:30 p.m., in the Parks and Recreation Conference Room, 1341 Nipomo Street, San Luis Obispo, California. APPROVED BY THE PARKS AND RECREATION COMMISSION: XX/XX/2020  Parks and Recreation Commission Agenda Report Meeting Date: 09/02/2020 Item Number: DATE: September 2, 2020 FROM: Greg Avakian, Parks and Recreation Director Prepared By: Shawna Scott, Senior Planner, Community Development SUBJECT: Parks and Recreation Master Plan and General Plan Element Update RECOMMENDATION 1. Review, discuss, and provide comments on the Master Plan Draft Capital Improvement Program and Operational Cost Tables DISCUSSION During the September 4, 2019 public meeting1, the Parks and Recreation Commission (PRC) received a presentation from the project consultant, WRT on the Park-by-Park Assessment, which included: a review of the full list of City park and recreation facilities; identification of the general physical condition of each site; any relevant issues pertaining to site access and use; and park-specific recommendations communicated by members of the public and the PRC during the Plan Update process. Based on these factors, the presentation included preliminary park improvement recommendations and each park was classified according to what type of improvements are needed. The September PRC meeting was the first opportunity for public consideration of these preliminary Master Plan project recommendations, and WRT-recommended tier designations including: Tier 1, Critical Park Improvements (Maintenance); Tier 2, Strategic Park Improvements, Improvement of Existing Parks/Facilities; and Tier 3, “Visionary” Park Improvements, New Opportunities. Following WRT’s presentation and public comment, the PRC provided direction to staff to develop a list of potential Parks and Recreation Element and Master Plan visionary and aspirational programs, parks, facilities, and specific projects. At the November 6, 2019 public meeting, staff presented Draft Themes/Strategies, Goals, and Concepts for PRC and public review, which will further inform the revised project list.2 Based on public comments and questions and statements from the PRC, additional information including presentation of quantified needs and deficiencies based on national standards was identified as a key component to determine what projects should be included and prioritized in the Master Plan and General Plan Element Update.   1 Parks and Recreation Commission Agenda Report, September 2019, available here.  2 Parks and Recreation Commission Agenda Report, November 2019, available here.  City of San Luis Obispo, Title, Subtitle  Parks and Recreation Master Plan and General Plan Element Update Page 2  On March 4, 2020,3 Staff provided additional information for the PRC to consider, including a Recreation Amenities and Level of Service Analysis that identified standards for parkland and recreation and facility amenities based on the City’s current and future resident and daytime populations. Information presented included potential locations for identified new facilities and amenities. It was recognized by Staff and the PRC that these standards provide the base minimum to serve identified populations, and that the City should strive to exceed these standards. In addition to the base needs, aspirational amenities identified by the community were also recognized as important to include in the Master Plan Update. At the July 8, 2020 PRC meeting4, staff presented a Draft Vision, Goals, and Policies document and received comments and direction from the PRC. The Vision statements, Goals, and Policies as amended based on PRC input will be incorporated into the Draft Master Plan Update. The draft cost estimates for park and facilities amenities were also presented for initial introduction and will be discussed further during this current PRC meeting. DRAFT COST ESTIMATES FOR PARK AND FACILITY AMENITIES AND OPERATIONS The City’s consultant team, inclusive of Wallace Group and PROS Consulting, has prepared draft capital and operational cost estimates for park and facility amenities for the PRC’s review (Attachment 1). The identified costs include the initial capital investment, and operation and maintenance of parks and amenities. Please note the draft cost table is not inclusive of all aspirational projects that are anticipated to be included in the Master Plan. For example, projects such as land acquisition for parkland, improvements at the golf course, Sinsheimer Stadium upgrades, or a new community center would require a project-specific cost estimate. The cost estimate document includes guidelines and assumptions that were considered by the consultant team including:  Annual operational funding required to athletic fields and parks per identified unit (field or acre);  Maintenance frequency per facility and park amenity, appliance, and other operational features (i.e. lighting, mirrors, drinking fountains, mechanical systems, etc.);  Estimated maintenance labor hours for parks; and  Estimated lifecycle replacement schedule for facility and park amenities, appliances, and other operational features. The cost estimate document also presents recommendations for maintenance cost savings, such as Adopt-a-Trail Programs, Adopt-a-Park Programs, and operational partnerships. The PRC will receive a presentation on the cost estimates from WRT, Wallace Group, and PROS Consulting, and staff and the consultants will be available to respond to questions raised by the Commissioners and the public. This information is provided to the PRC and the public to help inform future project prioritization to be incorporated into the Master Plan Update. ATTACHMENT 1. Draft Capital and Operational Costs   3 Parks and Recreation Commission Agenda Report, March 2020, available here  4 Parks and Recreation Commission Agenda Report, July 8, 2020, available here  22-Jun-20 Architect: BEK Checked by: EAS NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL DIAMOND ATHLETIC FIELD (ADULT - 350' FOUL LINE, 90' BASE) 1 IRRIGATION SF 86,000 3.50 301,000.00$ 2 TURF (HYDROSEED) SF 86,000 0.50 43,000.00$ 3 INFIELD MIX SF 11,050 3.00 33,150.00$ 4 FIELD SIGNAGE / SCOREBOARD LS 1 45,000.00 45,000.00$ 5 EQUIPMENT ( BASES, PITCHERS MOUND) LS 1 25,000.00 25,000.00$ 6 BACKSTOP, FOUL POLES, DUGOUTS & TEAM BENCHES LS 1 150,000.00 150,000.00$ 7 SPECTATOR SEATING (FREESTANDING BLEACHERS)LS 1 90,000.00 90,000.00$ 8 LIGHTING LS 1 450,000.00 450,000.00$ 9 PERIMETER FENCING (6' CHAIN LINK)LF 1,200 35.00 42,000.00$ Sub Total 1,179,150.00$ PERMITTING / CONSULTING 25%294,787.50$ GENERAL SITE PREP / SUPERVISION 25%294,787.50$ Grand Total 1,768,725.00$ DIAMOND ATHLETIC FIELD (YOUTH/ ADULT - 275' FOUL LINE, 60' BASE) 1 IRRIGATION SF 55,000 3.50 192,500.00$ 2 TURF (HYDROSEED)SF 55,000 0.50 27,500.00$ 3 INFIELD MIX SF 5,400 2.00 10,800.00$ 4 FIELD SIGNAGE / SCOREBOARD LS 1 30,000.00 30,000.00$ 4 EQUIPMENT (BASES, PITCHERS MOUND)LS 1 20,000.00 20,000.00$ 5 BACKSTOP, FOUL POLES, DUGOUTS & TEAM BENCHES LS 1 30,000.00 30,000.00$ 6 SPECTATOR SEATING (FREESTANDING BLEACHERS)LS 1 50,000.00 50,000.00$ 7 LIGHTING LS 1 250,000.00 250,000.00$ 8 PERIMETER FENCING (6' CHAIN LINK)LF 920 35.00 32,200.00$ Sub Total 643,000.00$ PERMITTING / CONSULTING 25%160,750.00$ GENERAL SITE PREP / SUPERVISION 25%160,750.00$ Grand Total 964,500.00$ DIAMOND ATHLETIC FIELDS (YOUTH - 200' FOUL LINE, 60' BASE) 1 IRRIGATION SF 28,200 3.50 98,700.00$ 2 TURF (HYDROSEED)SF 28,200 0.50 14,100.00$ 3 INFIELD MIX SF 3,800 2.00 7,600.00$ 5 EQUIPMENT (BASES, PITCHERS MOUND)LS 1 10,000.00 10,000.00$ 6 BACKSTOP, FOUL POLES, DUGOUTS & TEAM BENCHES LS 1 15,000.00 15,000.00$ 7 SPECTATOR SEATING (FREESTANDING BLEACHERS)LS 1 30,000.00 30,000.00$ 8 LIGHTING LS 1 200,000.00 200,000.00$ 9 PERIMETER FENCING (6' CHAIN LINK)LF 650 35.00 22,750.00$ Sub Total 398,150.00$ PERMITTING / CONSULTING 35%139,352.50$ GENERAL SITE PREP / SUPERVISION 35%139,352.50$ Grand Total 676,855.00$ RECTANGLE ATHLETIC FIELDS (NATURAL TURF) 1 IRRIGATION SF 81,000 3.50 283,500.00$ 2 TURF (HYDROSEED)SF 81,000 0.50 40,500.00$ 3 GOAL/ NET (PAIR)LS 1 8,000.00 8,000.00$ 4 LIGHTING LS 1 400,000.00 400,000.00$ 5 PERIMETER FENCING (6' CHAIN LINK)LF 1,250 35.00 43,750.00$ Sub Total 775,750.00$ PERMITTING / CONSULTING 30%232,725.00$ GENERAL SITE PREP / SUPERVISION 30%232,725.00$ Grand Total 1,241,200.00$ PROJECT: CITY OF SAN LUIS OBISPO PARKS & RECREATION CLIENT: CITY OF SAN LUIS OBISPO PROJECT NO. 1458-0001 CONCEPTUAL STATEMENT OF PROBABLE COSTS PARK FACILITIES / AMENITIES Page 1 of 3 ATTACHMENT 1 NO.ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL RECTANGLE ATHLETIC FIELDS (SYNTHETIC TURF) 1 IRRIGATION SF 81,000 3.50 283,500.00$ 2 TURF (SYNTHETIC WITH STRIPING; 8-YR LIFE SPAN) SF 81,000 14.00 1,134,000.00$ 3 GOAL/ NET (PAIR) LS 1 8,000.00 8,000.00$ 4 LIGHTING LS 1 400,000.00 400,000.00$ 5 PERIMETER FENCING (6' CHAIN LINK)LF 1,250 35.00 43,750.00$ Sub Total 1,869,250.00$ PERMITTING / CONSULTING 10%186,925.00$ GENERAL SITE PREP / SUPERVISION 10%186,925.00$ Grand Total 2,243,100.00$ DISC GOLF COURSE (18 HOLE) 1 DISC GOLF BASKETS EA 18 650.00 11,700.00$ 2 DISC GOLF TEE SIGNS EA 18 200.00 3,600.00$ 3 CONCRETE TEE PADS EA 18 650.00 11,700.00$ Sub Total 27,000.00$ PERMITTING / CONSULTING 50%13,500.00$ GENERAL SITE PREP / SUPERVISION 50%13,500.00$ Grand Total 54,000.00$ PLAYGROUND AREA 1 PLAYGROUND EQUIPMENT LS 1 300,000.00 300,000.00$ 2 PLAYGROUND SURFACING (12" DEEP EWF)SF 10,000 3.00 30,000.00$ 3 CONCRETE CONTAINMENT CURB / RAMP LF 400 75.00 30,000.00$ Sub Total 330,000.00$ PERMITTING / CONSULTING 25%82,500.00$ GENERAL SITE PREP / SUPERVISION 25%82,500.00$ Grand Total 495,000.00$ DOG-PARK / OFF-LEASH DOG AREA 1 FENCING LF 1,000 95.00 95,000.00$ 2 AGILITY EQUIPMENT LS 1 10,000.00 10,000.00$ 3 GATES (2 PED, 2 SERVICE)EA 4 1,200.00 4,800.00$ 4 HOSE BIB / DRY WELL LS 1 2,500.00 2,500.00$ 5 LIGHTING (SAFETY LIGHTING IN KEY AREAS ONLY)LS 1 50,000.00 50,000.00$ Sub Total 112,000.00$ PERMITTING / CONSULTING 25%28,000.00$ GENERAL SITE PREP / SUPERVISION 25%28,000.00$ Grand Total 168,000.00$ TENNIS COURT (60' X 120') 1 FENCING / WINDSCREEN LF 360 110.00 39,600.00$ 1 GATES EA 2 1,200.00 2,400.00$ 2 POST-TENSION SLAB / SURFACING / STRIPING SF 7,200 19.50 140,400.00$ 3 EQUIPMENT (NET, END POSTS, CENTER STRAP)EA 1 3,500.00 3,500.00$ 4 LIGHTING LS 1 150,000.00 150,000.00$ Sub Total 336,000.00$ PERMITTING / CONSULTING 35%117,600.00$ GENERAL SITE PREP / SUPERVISION 35%117,600.00$ Grand Total 571,200.00$ PICKLEBALL COURT (30' X 60') 1 FENCING /GATE / WINDSCREEN LF 180 110.00 19,800.00$ 2 POST-TENSION SLAB / SURFACING / STRIPING SF 1,800 19.50 35,100.00$ 3 EQUIPMENT (NET, END POSTS, CENTER STRAP)EA 1 2,000.00 2,000.00$ 4 LIGHTING LS 1 100,000.00 100,000.00$ Sub Total 157,000.00$ PERMITTING / CONSULTING 35%54,950.00$ GENERAL SITE PREP / SUPERVISION 35%54,950.00$ Grand Total 266,900.00$ Page 2 of 3 ATTACHMENT 1 NO.ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL OUTDOOR BASKETBALL COURT 1 FENCING /GATE (OPTIONAL) LF 300 75.00 22,500.00$ 2 POST-TENSION SLAB / SURFACING / STRIPING SF 5,040 19.50 98,280.00$ 3 EQUIPMENT (POST/HOOP) LS 1 10,000.00 10,000.00$ 4 LIGHTING LS 1 100,000.00 100,000.00$ Sub Total 131,000.00$ PERMITTING / CONSULTING 35% 45,850.00$ GENERAL SITE PREP / SUPERVISION 35% 45,850.00$ Grand Total 222,700.00$ GROUP PICNIC AREA 1 SHELTER LS 1 95,000.00 95,000.00$ 2 PICNIC TABLES - 8' EA 8 4,200.00 33,600.00$ 3 TRASH RECEPTACLES EA 2 3,000.00 6,000.00$ 4 BUILT-IN GRILL EA 1 15,000.00 15,000.00$ Sub Total 150,000.00$ PERMITTING / CONSULTING 35% 52,500.00$ GENERAL SITE PREP / SUPERVISION 35% 52,500.00$ Grand Total 255,000.00$ BIKE PUMP TRACK 1 EARTHWORK/EXCAVATION/GRADING LS 1 90,000.00 90,000.00$ 2 FENCING /GATE LF 500 45.00 22,500.00$ 3 FEATURES /SKILLS AREA LS 1 15,000.00 15,000.00$ Sub Total 128,000.00$ PERMITTING / CONSULTING 35%44,800.00$ GENERAL SITE PREP / SUPERVISION 35%44,800.00$ Grand Total 217,600.00$ ROLLER HOCKEY COURTS 1 FENCING /DASHER BOARDS / GATE LF 424 185.00 78,440.00$ 2 POST-TENSION SLAB / SURFACING / STRIPING SF 11,000 19.50 214,500.00$ 3 LIGHTING LS 1 150,000.00 150,000.00$ 4 SCOREBOARD / SIGNAGE LS 1 45,000.00 45,000.00$ 5 SPECTATOR SEATING (FREESTANDING BLEACHERS)LS 1 30,000.00 30,000.00$ Sub Total 518,000.00$ PERMITTING / CONSULTING 25%129,500.00$ GENERAL SITE PREP / SUPERVISION 25%129,500.00$ Grand Total 777,000.00$ SAND VOLLEYBALL COURTS 1 SAND PLAY SURFACING (24" DEEP)LS 1 45,000.00 45,000.00$ 2 EQUIPMENT (NET, POLES, FOOTINGS AND LIMIT LINES)LS 1 40,000.00 40,000.00$ 3 CONCRETE CONTAINMENT CURB LS 1 10,000.00 10,000.00$ 4 LIGHTING LS 1 100,000.00 100,000.00$ Sub Total 195,000.00$ PERMITTING / CONSULTING 35%68,250.00$ GENERAL SITE PREP / SUPERVISION 35%68,250.00$ Grand Total 331,500.00$ ADDITIONAL NOTES: WALLACE GROUP MAKES NO WARRANTY, EITHER EXPRESSED OR IMPLIED, THAT ACTUAL COSTS WILL NOT VARY FROM THE AMOUNTS INDICATED AND ASSUMES NO LIABILITY FOR SUCH VARIANCES. Page 3 of 3 ATTACHMENT 1 ANNUAL PARK OPERATION AND MAINTENANCE FUNDING It is critically important to view the financial sustainability of the Parks and Recreation System through the concept of “Total Cost of Ownership” as shown in the graphic below. The Parks Division will need to closely monitor resources to ensure that the assets of the park system reach the anticipated lifecycles. It is recommended that the Parks Division maintenance funding grow to accommodate new park development in the future. As the system grows, the following guidelines should be utilized to identify annual operational funding required to maintain additional park acreage: • Athletic Field Parks:  $12,000 - $15,000 per rectangular field;  $18,000 - $20,000 per diamond field;  $5,000 general acreage • Community Parks: $7,500 - $9,000 per acre • Neighborhood Parks: $8,500 - $10,000 per acre • Open Space: $300 - $600 per actively managed acre • Pocket Parks: $10,000 - $12,000 per acre • Special Use Parks: Costs varies dependent upon amenities • Recreation Corridors/Trails: $5-$5,500 per acre • Regional Parks: Costs varies dependent upon amenities *Please note, maintenance costs typically increase 2-3% annually. 1.1.1 MAINTENANCE STANDARDS Maintenance standards are based on a Level (1), (2) and (3) modes (tasks and frequencies of each task) and follow best practices as established by the National Recreation and Park Association. The division can customize the standards based on the park and recreation values of the community and need to be adopted and implemented by staff and followed regardless of whether work is performed by City staff or third-party contractors. It is recommended that the City strive for Level 2 maintenance standards for the division to strive to are found on the following pages: ATTACHMENT 1 STRUCTURES BATHHOUSE Task Frequency Bathhouse - Level 1 Maintenance Goal: Present a neat and clean environment for users to have a valuable experience Clean, sweep and squeegee 7x/week Clean and stock restrooms 7x/week Wipe and clean mirrors 7x/week Remove Graffiti 7x/week Check Lighting / Electrical Outlets 7x/week Trash remove 7x/week Clean Trash Barrels As needed Clean Windows 1x/month Check Heating / cooling 7x/week Major Mechanical System Inspection (Preventative Maintenance)1x/month Seasonal Mechanical System Startup 2x/year Schedule Lighting, Mechanical Systems 1x/week Seasonal start-up and close-up 2x/year Change Rust Filters 1x/3 weeks ATTACHMENT 1 CONCESSION BUILDING FILTER/PUMP ROOM Task Frequency Concession Building - Level 1 Maintenance Goal: Provide a clean, inviting area to eat. Clean, sweep, vacuum 7x/week Remove and/or replace Garbage Bags and Trash cans 7x/week Clean and stock restrooms 7x/week Clean windows 1x/week Check Lighting 7x/week Check Heating / Cooling 7x/week Clean and wipe tables 7x/week Check and clean storage areas 1x/week Wash areas outside concession stands 7x/week Update and paint signage 1x/year Clean Patio 7x/week Major Mechanical System Inspection (Preventative Maintenance)1x/month Seasonal Mechanical System Startup/Closing 2x/year Schedule Lighting, Mechanical Systems 1x/week Replace outdoor carpeting 1x/2 years Clean carpeting 2x/year or as needed Inspect furniture 1x/week Task Frequency Filter/Pump Room Goal: To make the pump room easily accessible for the staff to work in a safe environment Clean/inspect Filters 7x/week Check chemical balance 7x/week Major Mechanical System Inspection (Preventative 1x/month Seasonal Mechanical System Startup 2x/year Inspect Pool Mechanical Systems 7x/week Critical Pump Inspection 1x/5 years (to be verified) ATTACHMENT 1 GAZEBO IRRIGATION PUMP HOUSE Task Frequency Gazebo - Level 2 Maintenance Goal: To present a recreational amenity capable of hosting small weddings and group gatherings Clean and sweep As needed Remove and/or replace Garbage Bags and Trash cans As needed Set-up Site As needed Trim and Landscape As needed Paint/Stain Gazebo 1x/2 years Wash As needed Inspect Electrical Systems 1x/year Remove Graffiti 1x/week or as needed Clean port-a-jons 7x/week Pump port-a-jons 1x/week or as needed Task Frequency Irrigation Pump House Goal: Create a maintenance area that is neat, clean, and efficient. Critical Pump Inspection 1x/5 years (to be verified) Annual Preventative Maintenance/Inspection 1x/year Monthly Preventative Maintenance/Inspection 1x/month Open/Close 2x/year Inspect flow rate/timing 3x/week ATTACHMENT 1 MAINTENANCE BUILDING Task Frequency Maintenance Building - Level 2 maintenance Goal: Create a maintenance area that is neat, clean, and efficient. Clean and sweep 1x/week Store equipment 7x/week Replace tools in original location 7x/week Clean and stock restrooms 7x/week Store supplies As needed Winterize stored equipment As needed Check Lighting 7x/week Check Heating / Cooling 7x/week Junk removal and disposal 1x/week Clean and wash driveways 1x/week Clean and maintain parking lots 1x/week Major Mechanical/Chemical System Inspection (Preventative Maintenance)1x/month Seasonal Mechanical System Startup 2x/year Inspect Lifts/Elevators 1x/year Inspect Fuel Tanks 1x/week State Inspection of Fuel Tanks 1x/year Inspect Used Oil Tanks 1x/monthly Remove Used Oil and Recycle Filters As needed Inspect/clean wash pads 7x/week or as needed Inspect/clean mix/load pads 7x/week or as needed Inspect chemical storage areas 7x/week Review/update emergency response plans (OSHA, MDEQ)1x/year ATTACHMENT 1 SHELTER RESTROOMS Task Frequency Shelter - Level 2 maintenance Goal: To provide a quality picnic or outing experience. Clean and sweep 1x/week Remove and/or replace Garbage Bags and Trash cans 5x/week Set-up Site As needed Trim and Landscape 1x/2 weeks Paint Pavilion 1x/2 years Power wash As needed Clean grills As needed Check/Spray for hornets, wasps As needed Inspect Electrical System 1x/year Clean port-a-jons 7x/week Pump port-a-jons 1x/week or as needed Inspect Picnic Tables 1x/week or as needed Inspect/Remove Debris from Roof 7x/week or as needed Remove Graffiti 1x/week or as needed Setup Tables for Event As needed Inspect windows and building sides 1x/week or as needed Task Frequency Restrooms - Level 2 Goal: Provide a clean, hygienic facility for people to use Clean and restock 5x/day Mow 1x/week Odor removal 5x/week Trim 1x/week Repair vandalism As needed Wash aprons 1x/week Remove and/or replace Garbage Bags and Trash cans 7x/week Paint trash barrels 1x/year Monthly Mechanical Inspection 1x/month Schedule Lighting, Mechanical Systems 1x/week ATTACHMENT 1 STORAGE BUILDINGS Task Frequency Storage Building- Level 3 Maintenance Goal: Provide a safe, clean and accessible storage facility to maximize the County's equipment and supply v alue Inventory and removed unused materials 1x/year Clean 1x/monthly or as needed Check electricity 1x/year Paint 1x/5 years Spray for bugs As needed Major Mechanical/Chemical System Inspection (Preventative Maintenance)1x/month ATTACHMENT 1 PARK GROUNDS DISC GOLF GENERAL TURF INCLUDING DOG PARKS Task Frequency General Park - Warm Weather Grass - Level 2 Goal: Provide a quality park look that is green, safe and enticing to use Mow/Trim (1 1/2") March 1 through March 31 1x/14 days Mow/Trim (2") April 1 through October 31 1x/7 days Mow/Trim (2")November 1 through November 30 1x/14 days Mow/Trim (2") December 1 through February 28 1x/month Overseed As needed Fertilize As needed Apply weed control As needed Prune trees As needed Trim Shrubs As needed Pick up trash prior to mowing Every Mow Control pests As needed Manage leaves 2x/year and as needed Line Trim 1x/week Edge 1x/year Task Frequency Disc Golf Course Goal: To provide a safe area for riders and spectators that is well maintained and provides an enjoyable experience for participants and users Baskets are inspected for damage and replaced 1x/Week Grass for fairways are mowed 1x/Weekly Tee boxes inspected and repaired As needed Signage inspected and repaired 2x/Daily Garbage picked up 1x/Daily Restrooms cleaned 1x/Daily Informational signs inspected and updated 1x/week ATTACHMENT 1 HERBICIDE APPLICATION MULCH Task Frequency Herbicide Application Goal: Provide a quality park look that is weed-free Pre-Emergent Weed Control in Non-Lawn Areas 2x/year Spring and Fall Post-Emergent Weed Control As needed Task Frequency Mulch - Level 2 Goal: To provide a preventative weed supply to reduce staff cost Apply Mulch 2x/year or as needed Weed Control 2x/year or as needed ATTACHMENT 1 NATURAL AREA MAINTENANCE Task Frequency Natural Community Area Goal: Complete inventory and restoration maintenance tasks requisite for the ecological health and function of park natural communities. Treatment Monitoring project-specific Sample Water project-specific Cut/ Herbicide As needed Spray Herbicide As needed Plant/ Seed As needed Collect Seed As needed Create Burn Break As needed Flag/ Mark Features As needed Brush/ Vegetation Removal As needed Tree Removal As needed Install/ Repair Nestbox As needed Install Signage As needed Perimeter Walk As needed Perimeter Clearing As needed Remove Trash As needed Close Trail As needed Mow Trail As needed Mow/ Brushog As needed Suspend Mowing As needed ATTACHMENT 1 ORNAMENTAL ENTRYWAY PLAYING FIELDS Task Frequency Playing Fields - Baseball / Softball / Soccer / Multi-use - Level 2 Goal: To provide a high-quality and safe field that encourages greater use among the community for practice, games and tournaments Mowed 1x/week Overseed 2x/year Fertilizer 2x/year Aerate 2x/year Drag / Line fields for games 7x/week Pick up trash and clean during events 7x/day Inspect bleachers /scoreboards / security lighting 1x/week Water ( 1 inch / week)As needed Paint Backstops 1x/2 years Task Frequency Ornamental - Entryway / Signage Planting: Level 1 Goal: To provide a positive image of a park and / or a hospitality facility that promotes the Gilbert Parks and Recreation brand Plant landscape flowers (annuals)2x/year Perennial Plants/Shrub Maintenance 3x/year Flowerbed preparation 1-2x/year Mulch 1x/year and as needed Aeration, Fertilizer, Weed Control 1x/2 weeks or as needed Create floral display 3x/year Clean weeds from beds 1x/week or as needed Prune and deadhead flowers 1x/week Repaint signs 1x/year Water As needed Trim Trees 1x/year Inspect and adjust irrigation heads 1x/week Replace/supplement Bulbs 1x/2 years Inspect, adjust accent lighting (and timers)1x/month and as needed ATTACHMENT 1 SHRUB MAINTENANCE TRAILS Task Frequency Shrub Maintenance Goal: Ensure proper growth and preserve health of shrubs Removal of Frost Damaged Plants Between March 1 -March 31 General Trimming 3x/year Task Frequency Trail Goal: Hard Surface - To provide a quality surface for walking, running or bicycling for all ages and types of visitors S oft surface: To provide a reasonable level of trail quality for walking, running or biking that does not have to meet ADA standards Trim/Prune 2x/year or as needed Mow 2-4x/month Surface Repair 1x/month and as needed Inspection 1x/week and following major Major Inspection 1x/year Seasonal Maintenance and event preparation 3x/year Spray weed control As needed Inspect/change way-finding signage 3x/year Clean/Blow Paved Trails 1x/week or as needed ATTACHMENT 1 T REE MAINTENANCE Task Frequency Tree Maintenance Goal: Ensure proper growth and preserve health of trees Clearance Pruning As needed Prune small trees Every two years Prune large trees Every seven years Plant trees Annually Order trees As needed Monitor Tree Health Continuously Mulch trees Annually Collect Inventory data As needed Tree removal As needed Stump removal As needed Cite Hazard Trees for removal As needed Water trees 1x/week Weed control 3x/year ATTACHMENT 1 PARK AMENITIES BENCH BIKE RACK DOG WASTE DISPENSER Task Frequency Bench Goal: Ensure they are in good condition, are updated, safe and offer an enjoyable experience to the users Inspect 3x/year Paint, refinish 1x/year or as needed Task Frequency Bike Rack Goal: Ensure they are in good condition, are updated, safe and offer an enjoyable experience to the users Inspect 3x/year Paint, refinish 1x/year or as needed Task Frequency Dog Waste Bag Dispenser Goal: Ensure they are in good condition, are updated, safe and offer an enjoyable experience to the users Inspect, restock 5x/week Replace As needed ATTACHMENT 1 DRINKING FOUNTAIN FENCING Task Frequency Drinking Fountain Goal: Ensure they are in good condition, are updated, safe and offer an enjoyable experience to the users Inspect, clean 7x/week Repair As needed Task Frequency Fence - Level 2 Maintenance Goal: Support the asset for security, image, boundaries, and play areas. Inspect 1x/year and following storms Repair As needed Replace As needed Repaint (potentially through electrostatic technique)As needed Vegetation Control 1x/year and as needed ATTACHMENT 1 GATE GRILL HARDSCAPE - BRIDGE Task Frequency Gate - Level 2 Maintenance Goal: Support the asset for security, image, boundaries, and play areas. Inspect 1x/month and following storms Repair As needed Replace As needed Repaint (potentially through electrostatic technique)As needed Vegetation Control 1x/year and as needed Task Frequency Grill Goal: Ensure they are in good condition, are updated, safe and offer an enjoyable experience to the users Inspect, remove coals 7x/week Paint 1x/year Task Frequency Hardscape - Bridge Goal: To provide a safe high quality amenity for people to walk, bike or run Clean As needed Inspect 1x/week Repair As needed Apply ice solvents (no salt)As needed Structural Inspection 1x/5 years ATTACHMENT 1 HARDSCAPE – PARKING LOT HARDSCAPE – POOL DECK Task Frequency Hardscape -Parking Lot Goal: To provide a quality, pothole free facility to park on Clean 1x/week Stripe Paved, Paint Bumper Blocks 1x/2 years Inspect 7x/week Repair As needed Grade/Chloride gravel parking 2 or 3x/year Inspect Signs 7x/week Major Inspection 1x/year Mill and Cap Asphalt 1x/15-20 years or as needed Fill cracks 1x/year and as needed Seal 1x/2 years Safety Inspection (lighting, vegetation, etc)1x /year Inspect, Repair, Flush Storm Sewer Systems 1x/year Sweep Parking lot 1x/year Plow/salt As needed Task Frequency Hardscape -Pool deck Goal: To provide a safe, quality walking surface for a people to access the aquatic facility Clean and dry 7x/week Inspect 7x/week Repair As needed Paint safety signs and depth levels 1x/year Clean Drains 1x/week Setup/Take down seasonal Amenities 2x/year ATTACHMENT 1 HARDSCAPE - ROAD HARDSCAPE - SIDEWALK Task Frequency Hardscape -Road Goal: Provide a quality surface for people to access for driving, bicycling, walking or running Clean and sweep 1x/year or as needed Marked 1x/two years Mowed on both sides 1x/week Check signs 1x/week Repair As needed Overlays 1x/10 years Seal potholes / cracks 1x/year Inspect and repair gravel edge 1x/year and as needed Task Frequency Hardscape - Sidewalk Goal: Provide a quality surface for people to access for bicycling, rollerblading, walking or running Clean and sweep 1x/year or as needed Repair/Replace As needed Inspect and repair gravel edge 1x/year and as needed Remove Snow As needed Edge 2x/year and as needed Major Inspection 1x/year Weed Control As needed ATTACHMENT 1 HARDSCAPE – WOOD DECK IRRIGATION SYSTEM NETS Task Frequency Hardscape - Wood Deck Goal: Provide a safe amenity for people to enjoy a program for activity or observation Sweep/clean 1x/week Power wash 1x/2 years Reset Nails/Screws 1x/2 years Stain 1x/2 years Remove Snow/Ice As needed Major Inspection 1x/year Repair As needed Task Frequency Irrigation System Goal: To provide a sustainable, well-maintained and water- efficient system for irrigating grounds to ensure high quality surfaces and playing experience Open/Close Irrigation 2x/year Inspect, adjust, water volume 1x/week Task Frequency Nets Goal: Ensure they are in good condition, are updated, safe and offer an enjoyable experience to the users Inspect, restock 1x/week Repair As needed ATTACHMENT 1 PICNIC TABLE PLAYGROUNDS Task Frequency Picnic Table Goal: Ensure they are in good condition, are updated, safe and offer an enjoyable experience to the users Inspect 1x/year Stack/Distribute 2x/year Repair As needed Wash (shelter tables)7x/week Task Frequency Playgrounds and equipment - (All types) - Level 1 Maintenance Goal: To adhere to and exceed National Playground Safety Standards Inspect and document; 1x/month Major Annual Inspection 1x/year Repair Immediately Clean and pickup trash 7x/week Remove vandalism As needed Inspect water fountains, where applicable 7x/week Mow areas around the playground 1x/week Inspect playground parking lot, picnic tables and visitor benches 1x/week Rake sand, woodchips, gravel, fiber mulch 1x/week Seal rubberized, poured in place 1x/year Remove/Replace Fiber Mulch 1x/3-5 years Replace 1x/15 years Inspect for Pests/Bees/etc 1x/2 weeks ATTACHMENT 1 PLAYING COURTS – BASKETBALL/PICKLEBALL/TENNIS PLAYING COURTS – HORSESHOE PIT Task Frequency Playing Courts - Basketball/Pickleball/ Tennis Goal: To provide a safe and quality surface for practice or competitive type events Clean and sweep 5x/week Inspect stripes 1x/year Inspect fences 1x/month Inspect nets and pole, where applicable 1x/week Repair As needed Inspect lighting 1/x week Major Inspection 1x/year Task Frequency Playing Courts - Horseshoe Pit Goal: To provide a safe and quality surface for practice or competitive type events Evaluate stakes for vertical position 1x/month Mow 1x/week Replace backboards 1x/5 years or as needed Update player thrower lanes 1x/year Major Inspection 1x/year Edge and supplement sand 1x/year and as needed Paint Backboards 1x/year ATTACHMENT 1 PLAYING COURTS – SKATE PARK SIGNAGE TRASH CAN Task Frequency Playing Courts - Skate Park Goal: To provide a safe and quality surface for practice or competitive type events Inspect lighting 1x/month Repair As needed Trash pick-up 7x/week Major Inspection 1x/year Seal 1x/2 years Inspect for Pests/Bees/etc 1x/week Inspect skate park features 1x/month Fill Cracks 1x/year Task Frequency Sign Goal: Inform users in a clear concise manner Inspected System-wide 1x/year Inspected by park 1x/week Repair/Level As needed Remove vandalism As needed Transition Summer/Winter sign 2x/year Inspect Entrance Sign 1x/year Paint Entrance Sign 1x/5 years Paint Other Signs 1x/year or as needed Remove/Replace Seasonal Signs 2x/year Task Frequency Trash Cans Goal: Ensure they are in good condition, are updated, safe and offer an enjoyable experience to the users Empty 7x/week Clean 1x/week ATTACHMENT 1 1.1.2 LABOR HOURS • A key driver of establishing operational funding based on maintenance standards is quantity of labor hours required to meet the standards. The number of labor hours, on average, required to manage and maintain the parks system to the standards provided in the previous section is as follows: o Pocket Parks: 323-375 annual labor hours per acre o Neighborhood Parks: 250-300 annual labor hours per acre o Community Parks: 200-250 annual labor hours per acre o Regional Parks: Varies based on amenities o Special Use Parks: Varies based on amenities 1.1.3 PARK MAINTENANCE OTHER RECOMMENDATIONS • Cost Avoidance: Maintenance operations are typically spent in divisions that do not have direct revenue sources that can offset expenditures. There are opportunities, however, to reduce expenditures through the following strategies. • Adopt-a-Trail Programs: These are typically small-grant programs that fund new construction, repair or renovation, maps, trail brochures, and facilities (bike racks, picnic areas, birding equipment, etc.), as well as providing maintenance support. These programs are similar to the popular “adopt-a-mile” highway programs most states utilize. Adopt-a-trail programs can also take the form of cash contributions in the range of $12,000 to $16,000 per mile to cover operational costs. • Adopt-a-Park Programs: These are small-grant programs that fund new construction and provide maintenance support. Adopt-A-Park programs can also take the form of cash contributions in the range of $1,000 to $5,000 per acre to cover operational costs. • Operational Partnerships: Partnerships are operational funding sources formed from two separate agencies, such as two government entities, a non-profit and a public agency, or a private business and a public agency. Two partners jointly share risk, operational costs, responsibilities, and asset management based on the strengths of each partner. 1.1.4 SYSTEMATIC APPROACH TO CONTRACTING SERVICES Through the development of management processes, the Parks Division should track unit activity costs through the implementation of a work order management system and in turn, internally analyze the unit cost to have work performed work by community partners, volunteers or a third-party vendor. ATTACHMENT 1 1.1.5 LIFECYCLE REPLACEMENT SCHEDULE Amenities Unit Suggested Lifecycle (in years) Average Replacement Cost (per Unit) Notes Aquatic Center SF 35 $400-$500 Dependent upon type of pool Recreation Building SF 50 $425 Barricades EA 25 $500 Assume Double swing gates used to close parks Baseball/Softball Field (Lighted) - Metal Halide EA 25 $325,000 To retrofit to LED, cost is $500 more per bulb Basketball - Outdoor Court (Lighted)EA 25 $85,000 BBQ Grill EA 10 $500 Benches EA 15 $1,000 Metal with Powder Coating Bike Rack EA 10 $350 Metal with Powder Coating Concession Stands SF 25 $250 per square foot cost Disc Golf Hole EA 15 $1,000 Per hole cost Dog Parks (Lighted)AC 25 $70,000 per acre cost Drinking Fountain EA 10 $6,000 Emergency Phone EA 15 $1,800 assumes replacement of public phone with emergency phone Fit Course Course 10 $900 Assumes cost of single piece of equipment Flag Pole EA 35 $3,200 Fountain EA 30 $1,500 Highly dependent upon complexity and size of fountain Gardens SF 30 $.02-$.05 Dependent upon type of garden Horseshoe Pit EA 30 $6,000 Rebuild New In-Line Hockey (lighted) EA 20 $75,000 Assumes lighted Lake AC 25 $500,000 per acre Parking Space EA 25 $5,000 New Build Pedestrian Bridge LF 50 $500-$2000 Highly dependent upon complexity of the crossing Picnic Tables EA 15 $1,500 Playground (Shaded)EA 10 $250,000 2-5 year old and 5-12 year old components Racquetball Court EA 25 $50,000 Ramada/Shelter 10 x 10 EA 35 $50,000 Ramada/Shelter 20 x 20 EA 35 $85,000 Restroom EA 25 $250,000 Restroom SF 25 $250-$350 per square foot cost Scoreboard EA 10 $55,000 Digital on pedestal Shade Canopys (separate from Playgrounds)EA 10 $30,000 Shuffleboard Court EA 20 $8,500 Signage (Monument-Park Name)EA 25 $12,000 Signage (Rules & Reg)EA 10 $500 Skate Park above ground SF 10 $30 Skate Park in-ground SF 30 $150 Soccer Field (Lighted) - Metal Halide EA 25 $1,000,000 Buld New; To retrofit to LED, cost is $500 more per bulb Tennis Court (Lighted) EA 20 $140,000 Trail (Decomposed Granite)LF 25 $8-$12 Trail (Paved)LF 25 $60 Material Dependent - assume concrete Trash (Receptacle)EA 15 $1,000 Volleyball Court (Sand)EA 30 $16,000 Walkways LF 25 $60 Assume concrete ATTACHMENT 1