Loading...
HomeMy WebLinkAboutItem 4 - ARCH-0095-2020 (3065 Lucca Lane)PLANNING COMMISSION AGENDA REPORT SUBJECT: Review of a new 100% affordable housing development required to satisfy the inclusionary housing requirement for tract 2428. The project consists of five, two-story structures containing a total of 38 low-income affordable units, a community room, and leasing office, on a site designated for affordable housing. The project includes requested alternative incentives for the provision of 38 low-income affordable housing units, including an 89% density bonus and a proposed reduction in setback requirements, consisting of a setback of four feet where five feet is the minimum required within the Planned Development (PD) overlay zone. PROJECT ADDRESS: 3065 Lucca Lane BY: Kyle Van Leeuwen, Assistant Planner Phone Number: (805) 781-7091 FILE NUMBER: ARCH-0095-2020 & E-mail: kvanleeuwen@slocity.org AFFH- 00096-2020 FROM: Tyler Corey, Principal Planner RECOMMENDATION Adopt the Draft Resolution (Attachment 1) approving the new inclusionary housing development consisting of 38 low-income affordable units, a community room, and leasing office subject to findings and conditions of approval. SITE DATA BACKGROUND AND SUMMARY Vesting Tentative Tract Map No. 2428 was originally approved in 2007, which approved 178 lots. Consistent with the City’s Inclusionary Housing Ordinance, the developer was required to provide for the creation of 26 affordable housing units within the project and did so by agreeing to dedicate five lots to the Housing Authority. In 2017 the final map for phase two of the tract, which included the affordable housing lots, was approved by City Council. At that time, a protected plant species was identified on one of the affordable housing lots and lot lines were adjusted to accommodate its protection. In order to retain the overall square footage required to fulfill the inclusionary housing requirement, the developer dedicated two additional lots for affordable housing. Applicant San Luis Obispo Non-Profit Housing Corporation Representative Aisling Burke, Ten Over Studio Zoning Medium-Density Residential, Specific Plan and Planned Development Overlay zone (R-2-SP-PD) General Plan Medium Density Residential Site Area ~1.21 acres Environmental Status Project is consistent with the Final Program Environmental Impact Report for the Margarita Area Specific Plan and the Mitigated Negative Declaration for Tract Map #2428 (Toscano Development) Meeting Date: September 9, 2020 Item Number: 4 Figure 1: Project location Item 4 Packet Page 213 ARCH-0095-2020 & AFFH-0069-2020 3065 Lucca Lane Page 2 The proposed project will fulfill the required inclusionary housing component of the tract, and consists of five new two-story structures, which will contain 38 low-income affordable units, a community room, and a leasing office. The residential units provided will be a mix of sizes including ten three-bedroom, ten two-bedroom, and 18 one-bedroom units. The project site is within the Toscano residential development, on the seven lots dedicated for affordable housing units, and will be accessed from San Vincenzo Drive by way of Lucca Lane. The project is within the Margarita Area Specific Plan1 (MASP) and part of a Planned Development overlay, which covers all of the Toscano Development. The project proposes 44 surface parking spaces, with 20 compact spaces and 14 spaces provided in a tandem arrangement. The project also provides a play area and outdoor amenity space for tenant use. The project is proposed as a 100% affordable housing project and includes a request for two affordable housing alternative incentives: 1) an 89% density bonus, and 2) an exception to the minimum setback requirements of the Planned Development overlay to allow a four-foot setback where five feet would normally be required (Attachment 2, Project Plans). 1.0 COMMISSION’S PURVIEW Review project for consistency with the General Plan, MASP, Zoning Regulations, Planned Development ordinance, Community Design Guidelines (CDG) and applicable City development standards and guidelines. Planning Commission (PC) review is required for residential developments 1 Margarita Area Specific Plan: https://www.slocity.org/home/showdocument?id=4070 Figure 2: Rendering of project design as seen from parking area within the site Item 4 Packet Page 214 ARCH-0095-2020 & AFFH-0069-2020 3065 Lucca Lane Page 3 with more than ten units (Zoning Regulations § 17.106.030) and for projects that include affordable housing alternative incentive requests (Zoning Regulations § 17.140.070). 2.0 PROJECT STATISTICS The project site is within a Planned Development overlay (PD) and a specific plan overlay (SP). Each overlay, and their associated regulatory documents, provide varying standards applicable to the project. Where the PD overlay provides a specific standard (setback, density, etc.) that standard takes precedent (Attachment 3). Where the PD ordinance does not provide a specific standard, the specific plan standards are applied. Where the PD and specific plan do not provide a specific standard, the Zoning Regulations standards are applied. Site Details Proposed Allowed/Required Street Setback (from center line) 15’ -4” feet 15’ (total easement width) Side Setback 3 4’* 5’ Density (units/acre) 2 28.6 (89% Bonus)* 16 Maximum Height of Structures 1 29 feet 35 feet Max Building Coverage 3 31% 75% Total # Parking Spaces 1 44 38 Environmental Status Project is consistent with previously approved environmental reviews for the Planned Development Overlay and tract map 12019 Zoning Regulations - 2Margarita Area Specific Plan - 3Planned Development ordinance *Incentive or exception requests for PC consideration 3.0 PREVIOUS REVIEWS The Architectural Review Commission (ARC) reviewed the proposed project on June 15, 2020 and unanimously recommended the PC find the project consistent with the CDG and MASP Design Guidelines (Attachment 4, ARC Staff Report and Meeting Minutes). During their review, the ARC provided the following additional comments and recommendations: • Provide screening at second floor decks, possibly in the form of semi-solid deck railings. • Consider speed control or traffic calming measures on Lucca Lane. • Require buffer and screening between tandem parking and the adjacent neighbors. • The Planning Commission should consider connectivity of circulation on this site and public transit opportunities to serve this site. • Consider expanding landing and weather protection aspects at the top of stairs on building one. 4.0 PROJECT ANALYSIS The proposed development must be consistent with the General Plan, MASP, Zoning Regulations, Planned Development ordinance, CDG and applicable City development standards and guidelines (PD, Attachment 3). Staff has evaluated the project’s consistency with relevant requirements and has found it to be in substantial compliance, as discussed in this analysis. Item 4 Packet Page 215 ARCH-0095-2020 & AFFH-0069-2020 3065 Lucca Lane Page 4 4.1 Consistency with the General Plan The Housing Element (HE) provides programs and policies that speak specifically to supporting affordable housing projects. The HE directs decisionmakers to promote higher densities2 and incentivize affordable housing through density bonuses3. The project is also consistent with Conservation and Open Space Element (COSE) Policy 4.4.34, because the project promotes higher- density, compact housing to achieve more efficient use of public facilities and services and to improve the City’s jobs/housing balance. 4.2 Consistency with the PD Overlay, MASP, and Zoning Regulations The project design must comply with the requirements and standards of the PD ordinance, which approved the overlay, the requirements of the MASP and the Zoning Regulations, as applicable. The project complies with lot coverage, building height, and street setback requirements for the location and zone (see Section 2.0 Project Statistics). Density: The applicant is requesting a density bonus of 89 percent. The site, zoned R-2-SP-PD, has an allowed density of 18.4 units based on the site’s net acreage (16 units per acre). The applicant is requesting an 89% density bonus as an alternative incentive for providing affordable housing units. This density bonus increases the total number of density units to 34.78 for the site (30.24 units per acre). The MASP limits the locations of density bonuses within Residential Development Areas due to the need for consistency with the County Airport Land Use Plan; density bonuses are only available in the areas identified in Figure 5 of the MASP. The project is completely with in this identified area. To receive the 89% density bonus as an alternative incentive, the applicant must dedicate a certain percentage of the initially allowed units as affordable housing. In this instance, the project will be 100% affordable. Density bonus percentages for projects that include low-income dedicated units are calculated based on the rates of increase set by Table 8-2 of the Zoning Regulations (see Zoning Regulations §17.140.040(D).). Table 8-2 lists bonus percentages for dedications up to 20% and associated density bonuses up to 35%. Therefore when an applicant is providing a percentage of units that is more than 20%, a density bonus larger than 35% can be requested as an alternative incentive (as outlined in Zoning Regulations § 17.140.040(E)), and staff would expand Table 8-2 to establish the total density bonus that could be attained. By expanding Table 8-2, staff has determined that the applicant could receive up to a 155% density bonus for a 100% affordable project. For this project, the applicant is asking for an 89% density bonus, which is less than the 155% bonus the project could request, per the expanded Table 8-3. Side Setbacks: The PD ordinance requires that a setback no less than five feet be provided for all non- street fronting building walls. The applicant is requesting to reduce this required setback for Building 3 to approximately four feet, adjacent to the eastern pedestrian path. The proposed setback reduction for Building 3 will not alter the overall character of the neighborhood because only a corner of the structure will be setback less than five feet, landscaping will be provided between the pedestrian path and the structure, and the reduction will not deprive any adjacent property of views or reasonable solar access, based on the location of the building. 2 Housing Element Policy 6.10: To help meet the Quantified Objectives, the City will support residential infill development and promote higher residential density where appropriate. 3 Housing Element Program 6.19: Continue to incentivize affordable housing development with density bonuses, parking reductions and other development incentives, including City financial assistance. 4 COSE Policy 4.4.3 Compact, high-density housing: The City will promote higher-density, compact housing to achieve more efficient use of public facilities and services, land resources, and to improve the jobs/housing balance. Item 4 Packet Page 216 ARCH-0095-2020 & AFFH-0069-2020 3065 Lucca Lane Page 5 Parking: The Zoning Regulations Section 17.140.040K (Low-income housing parking) provides alternative parking requirements for a project that provides exclusively very low or low-income housing based on one car and one bicycle space per dwelling unit. Section 17.90.040K also provides the opportunity for the parking requirements to be met by tandem parking. Total required parking for the project includes 38 vehicle parking spaces and 38 bicycle spaces; the project provides 44 vehicle parking spaces on site, and 50 bicycle parking spaces. The community room and a leasing office have also been included in the required parking table shown on the project plans; however, these accessory spaces do not require dedicated parking spaces. 4.3 Architectural Review Commission Directional Items The ARC unanimously recommended approval of the architectural design with the following directional items to be addressed in the final design of the project: ARC Directional Item #1: Provide screening at second floor decks, possibly in the form of semi-solid deck railings. This directional item is intended to provide additional privacy for balconies and reduce the impacts of visual clutter created by items that often accumulate on balconies. While the intent of this direction is to address a valid concern, providing semi-solid deck railings may be inconsistent with the Tuscan architectural style of the project. The Planning Commission should consider the trade-off between providing a consistent style for the structure as a whole and the possible visual impacts of open balconies, and if this direction from ARC should be included as a condition of approval. ARC Directional Item #2: Consider speed control or traffic calming measures on Lucca Lane. This directional item was in response to concerns raised by neighboring residents during the ARC hearing. The larger Toscano Development incorporates traffic calming strategies, including bulb- outs, choke-downs, and tabletops within the development. Additionally, staff has included Condition #6, requiring an additional traffic calming measure, such as a speedbump or tabletop, to be installed near the entrance to the site, which would address the ARC’s comment. ARC Directional Item #3: Require buffer and screening between tandem parking and the adjacent neighbors. This directional item was in response to the concerns of neighboring residences to the west of the site, and the possibility that vehicle headlights would be directed into adjacent backyards and homes when parking in the tandem parking area. Condition #7 has been added requiring a low wall, fencing, or other form of permanent improvement to prevent this intrusion of light from parking vehicles, which would address the ARC’s comment. ARC Directional Item #4: The Planning Commission should consider connectivity of circulation on this site and public transit opportunities to serve this site. This directional item for Planning Commission’s consideration is regarding transit services in the area and the potential options to provide a connection to the pedestrian and bicycle pathway to the west of the site, through the Conservation/Open Space parcel. Item 4 Packet Page 217 ARCH-0095-2020 & AFFH-0069-2020 3065 Lucca Lane Page 6 The Public Works Transit Division has communicated that although no route changes or additional transit stops are currently planned for the immediate five-year horizon, some re-evaluation may occur as other developments in the area progress. Specifically, new route options will be created when the Prado Road overpass is completed. Currently the nearest transit stop is located at 3220 South Higuera, approximately 0.6 mile from the project site. The MASP does identify in its Circulation Plan locations for potential bus stops. The closest of these identified potential spots is located near the corner of Cherry Lane and Junipero Way, which would be approximately 0.3 mile from the site (see Figure 3, Circulation Plan, Margarita Area Specific Plan). Pedestrian access to the residential units is provided through the bicycle and pedestrian path located to the east of the site. This path not only connects to San Vincenzo (the nearest public street) but is also in line with the pedestrian and bicycle path that connects to Calle Jazmin, which then connects to Margarita Avenue. While providing an additional connection to the west that would utilize the other pedestrian and bicycle path may be desirable, this would also create conflicts with past approvals. There are two inconsistencies that expanding pedestrian and/or bicycle access will create. First, the MASP Circulation Plan specifically calls out the path along the eastern drainage parcel, which then connects to Calle Jazmin, as the identified bike route to connect to Margarita Avenue (see Figure 3, Circulation Plan, Margarita Area Specific Plan). Second, creating a connection to the west would be inconsistent with the approved site plan for the development as a whole, which was approved in accordance with the adopted environmental review of the tract map; a Mitigated Negative Declaration (MND) which included the current project site and use. The MND included analysis of wetlands and sensitive areas for plant and wildlife species. Creating a connection would result in disturbance within designated Conservation/Open space lots, which were established for the protection of sensitive resources and are not within the project site. Item 4 Packet Page 218 ARCH-0095-2020 & AFFH-0069-2020 3065 Lucca Lane Page 7 ARC Directional Item #5: Consider expanding landing and weather protection aspects at the top of stairs on building one. The project plans show a five-foot by five-foot area at the top of the stairways to the upper unit of Building 1, which is partially covered and protected by the roof line. The Planning Commission should discuss if this area should be required to be expanded or if more covered area should be provided at the top of these stairs. 4.0 ENVIRONMENTAL REVIEW On October 12, 2004, the City Council certified the Final Program EIR for the Margarita Area Specific Plan through Council Resolution 9615 (2004 Series). On July 3, 2007, the City Council adopted Resolution No. 9917, adopting a Mitigated Negative Declaration (MND), and approving the project’s Vesting Tentative Tract Map (TR, PD, and ER 98- 06). On April 15, 2014, the City Council reviewed an Addendum to the MND in connection to proposed modifications to the conditions of approval for Vesting Tentative Tract Map #2428 and found that no changes to the previously adopted mitigation measures were warranted. City Council Figure 3: Circulation Plan, Margarita Area Specific Plan Item 4 Packet Page 219 ARCH-0095-2020 & AFFH-0069-2020 3065 Lucca Lane Page 8 Resolution No. 10514 (2014 Series) restated all mitigation measures and provided updated conditions of approval for the project. City Council Resolution No. 10514 includes Condition #77 which requires that Lots 171-175 of Tract #2428 be dedicated for affordable housing to provide for the required affordable units of the Toscano development. Minor modifications to the approved tract map were included with the final map approval of the development Phase 2 (Resolution No. 10825), one outcome of these changes was the required dedication of lots was increased from five to seven lots. The project is consistent with the adopted Mitigated Negative Declaration for Tract Map #2428, all mitigation measures adopted as part of the MASP EIR and Subsequent MND that are applicable to the proposed project are carried forward and applied to the proposed project to effectively mitigate the impacts that were previously identified. 5.0 OTHER DEPARTMENT COMMENTS All City Departments have reviewed the project and have provided comments that are incorporated into the staff report and recommended resolution as conditions of approval. 6.0 ALTERNATIVES 6.1 Continue the item. An action to continue the item should include a detailed list of additional information or analysis required. 6.2 Deny the project. An action denying the application should include findings that cite the basis for denial and should reference inconsistency with the General Plan, MASP, Zoning Regulations, Planned Development ordinance, CDG or other policy documents. Should the Planning Commission want to pursue this alternative, staff recommends that the specific findings under Government Code §§ 65915(d)(1)(B) and (d)(3) be adequately addressed. 7.0 ATTACHMENTS 1. Draft Resolution 2. Project Plans 3. Planned Development Ordinance (No. 1506, 2007) 4. ARC Staff Report and Meeting Minutes 6.15.20 Item 4 Packet Page 220 RESOLUTION NO. PC-XXXX-20 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, APPROVING AN INCLUSIONARY HOUSING DEVELOPMENT CONSISTING OF FIVE, TWO-STORY STRUCTURES CONTAINING A TOTAL OF 38 LOW-INCOME AFFORDABLE UNITS, A COMMUNITY ROOM AND LEASING OFFICE, AND ALTERNATIVE INCENTIVES FOR AFFORDABLE HOUSING INCLUDING AN 89% DENSITY BONUS AND A RELAXATION OF DEVELOPMENT STANDARDS TO ALLOW A SETBACK OF FOUR FEET WHERE FIVE FEET IS THE STANDARD, IN ACCORDANCE WITH THE MITIGATED NEGATIVE DECLARATION ER-98-06, AS REPRESENTED IN THE STAFF REPORT AND ATTACHMENTS DATED SEPTEMBER 9, 2020 (3065 LUCCA LANE ARCH-0095-2020/AFFH-0096- 2020) WHEREAS, the City Council of the City of San Luis Obispo conducted a public hearing in the Council Chamber of City Hall, 990 Palm Street, San Luis Obispo, California, on April 15, 2014, approving modified conditions of approval for Vesting Tentative Tract Map 2428 adopted through City Council Resolution No. 10514 (2014 Series) originally approved through City Council Resolution No. 9917 (2007 Series) pursuant to a proceeding instituted under MOD/TR/ER 121-13, Margarita Ranch SLO, LLC, applicant; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a web-based public hearing on June 15, 2020, recommending the Planning Commission find the project consistent with the Community Design Guidelines and Margarita Area Specific Plan Design Guidelines, pursuant to a proceeding instituted under ARCH-0095-2020, and AFFH- 0096-2020, San Luis Obispo Non-Profit Housing Corporation, applicant; and WHEREAS, the Planning Commission of the City of San Luis Obispo conducted a web- based public hearing on September 9, 2020, pursuant to a proceeding instituted under ARCH- 0095-2020, and AFFH-0096-2020, San Luis Obispo Non-Profit Housing Corporation, applicant; and WHEREAS, notices of said public hearings were made at the time and in the manner required by law; and WHEREAS, the Planning Commission of the City of San Luis Obispo has duly considered all evidence, including the testimony of the applicant, interested parties, and evaluation and recommendations by staff, presented at said hearing. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of San Luis Obispo as follows: SECTION 1. Findings. The Planning Commission hereby grants final approval to the Item 4 Packet Page 221 Resolution No. PC-xxxx-20 3065 Lucca Lane, ARCH-0095-2020 & AFFH-0096-2020 Page 2 project (ARCH-0095-2020 & AFFH-0096-2020), based on the following findings: 1. The project will not be detrimental to the health, safety, and welfare of persons living or working at the site or in the vicinity because the project will be compatible with site constraints and the scale and character of the neighborhood. 2. The project is consistent with the Housing Element because the project provides a variety of residential types, sizes, and styles of dwellings (HE 5.4). The project supports Housing Element Policies related to inclusion and expansion of affordable housing units within the City (HE 1.1, 1.2, 2.1, 2.2, 7.1, 7.2, and 8.1). 3. The project is consistent with the Margarita Area Specific Plan because the project site is one of two sites dedicated to provide a minimum of 40 affordable dwellings within the housing tracts of the western enclave of the Margarita Area (Tract 2343, 2353, & 2428), and the proposed project will provide 38 units with the remainder provided on the second site. 4. The project fulfills Condition #77 of Council Resolution No. 10514 (2014 Series), which requires the development of affordable housing units within Tract 2428 (Toscano Development), and is consistent with Council Resolution 10825 (2017 Series) which approved the final map that created the seven lots dedicated to the Housing Authority and are proposed to be developed. 5. The design of the project is consistent with the Community Design standards of the Margarita Area Specific Plan and incorporates articulation, massing, and a mix of color/finish materials that are compatible with the neighborhood and complementary to other development within the immediate vicinity. Density Bonus 6. The requested density bonus is consistent with Housing Element Program 2.17, which encourages the City to consider residential densities above the state density bonus allowance for projects providing housing for low-income households. 7. The requested density bonus is consistent with the intent of Housing Element Policy 6.10 and Program 6.19, because it promotes higher residential densities and incentivizes affordable housing by providing a density bonus. 8. The requested density bonus is consistent with Conservation and Open Space Element Policy 4.4.3 because the project promotes higher-density, compact housing to achieve more efficient use of public facilities and services, land resources, and to improve the City’s jobs/housing balance. 9. The Margarita Area Specific Plan limits the locations of density bonuses within Residential Development Areas due to the need for consistency with the County Airport Land Use Plan, Item 4 Packet Page 222 Resolution No. PC-xxxx-20 3065 Lucca Lane, ARCH-0095-2020 & AFFH-0096-2020 Page 3 and density bonuses are only available in the areas identified in Figure 5 of the Plan. The location of the proposed structures is within the area identified in Figure 5 of the Margarita Specific Plan and is therefore consistent with the County Airport Land Use Plan. 10. The proposed project will provide quality affordable housing consistent with the intent of Chapter 17.140 of the Municipal Code, and the requested density bonus and reduction to site development standards is necessary to facilitate the production of affordable housing units. Setback Exception 11. The proposed project will provide for affordable housing units consistent with the intent of Chapter 17.140 of the Zoning Regulations, and the requested reduction to site development standards, allowing a setback of four feet where five feet is the standard requirement of the Planned Development Ordinance, is necessary to facilitate the production of the affordable housing. 12. The proposed setback of four feet will not alter the overall character of the neighborhood because only a corner of the structure will be setback less than five feet, landscaping will be provided between the pedestrian path and the structure, and based on the location of the building, the reduction will not deprive any adjacent property of views or reasonable solar access. SECTION 2. Environmental Review. On October 12, 2004, the City Council certified the Final Program EIR for the Margarita Area Specific Plan through Council Resolution 9615 (2004 Series). On July 3, 2007, the City Council adopted Resolution No. 9917, adopting a Mitigated Negative Declaration (MND), and approving the project’s Vesting Tentative Tract Map (TR, PD, and ER 98-06). On April 15, 2014, the City Council reviewed an Addendum to the MND in connection to proposed modifications to the conditions of approval for Vesting Tentative Tract Map #2428 and found that no changes to the previously adopted mitigation measures were warranted. City Council Resolution No. 10514 (2014 Series) restated all mitigation measures and provided updated conditions of approval for the project. City Council Resolution No. 10514 includes Condition #77 which requires that Lots 171-175 of Tract #2428 be dedicated for affordable housing to provide for the required affordable units of the Toscano development. Minor modifications to the approved tract map were included with the final map approval of the development Phase 2 (Resolution No. 10825), one outcome of these changes was the required dedication of lots was increased from five to seven lots. The project is consistent with the adopted Mitigated Negative Declaration for Tract Map #2428, all mitigation measures adopted as part of the MASP EIR and Subsequent MND that are applicable to the proposed project are carried forward and applied to the proposed project to effectively mitigate the impacts that were previously identified. SECTION 3. Action. The project conditions of approval do not include mandatory code requirements. Code compliance will be verified during the plan check process, which may include additional requirements applicable to the project. The Planning Commission hereby grants final Item 4 Packet Page 223 Resolution No. PC-xxxx-20 3065 Lucca Lane, ARCH-0095-2020 & AFFH-0096-2020 Page 4 approval to the project with incorporation of the following conditions: Planning Division 1. Final project design and construction drawings submitted for a building permit shall be in substantial compliance with the project plans approved by the Planning Commission (ARCH- 0095-2020). A separate, full-size sheet shall be included in working drawings submitted for a building permit that lists all conditions and code requirements of project approval listed as sheet number 2. Reference shall be made in the margin of listed items as to where in plans requirements are addressed. Any change to approved design, colors, materials, landscaping, or other conditions of approval must be approved by the Director or reviewed by the Architectural Review Commission and approved by the Director or Planning Commission, as deemed appropriate. 2. Plans submitted for a building permit shall call out the colors and materials of all proposed building surfaces and other improvements. Colors and materials shall be consistent with the color and material board presented at the Planning Commission Hearing on September 9, 2020. 3. Plans submitted for a building permit shall include recessed window details and all other details including but not limited to awnings, and railings. Plans shall indicate the type of materials for the window frames and mullions, their dimensions, and colors. Plans shall include the materials and dimensions of all lintels, sills, surrounds, recesses and other related window features. Plans shall demonstrate the use of high-quality materials for all design features that reflect the architectural style of the project and are compatible with the neighborhood character, to the approval of the Community Development Director. 4. All wall-mounted lighting fixtures shall be clearly called out on building elevations included as part of working drawings. All wall-mounted lighting shall complement building architecture. The lighting schedule for the building shall include a graphic representation of the proposed lighting fixtures and cut-sheets on the submitted building plans. The selected fixture(s) shall be shielded to ensure that light is directed downward consistent with the requirements of the City’s Night Sky Preservation standards contained in Chapter 17.70.100 of the Zoning Regulations. 5. A final landscaping plan, including irrigation details and plans, shall be submitted to the Community Development Department along with working drawings. The legend for the landscaping plan shall include the sizes and species of all groundcovers, shrubs, and trees with corresponding symbols for each plant material showing their specific locations on plans. 6. Plans submitted for a building permit shall include a speed bump, tabletop, or other traffic calming measure near the vehicle entrance to the site, to the satisfaction of Transportation Division of the Public Works Department and Community Development Director. Item 4 Packet Page 224 Resolution No. PC-xxxx-20 3065 Lucca Lane, ARCH-0095-2020 & AFFH-0096-2020 Page 5 7. Plans submitted for a building permit shall show a low wall, fence, or other form of permanent improvement near the western edge of the site, adjacent to the tandem parking spaces, to prevent the intrusion of light into nearby homes from vehicle headlights. A section exhibit shall be provided to confirm that the feature would block light intrusion. Engineering Division – Public Works/Community Development 8. The underlying lots shall be merged prior to building permit issuance. A separate Lot Merger application shall be submitted to the Planning Division to merge the lots. 9. The building plan submittal shall show and label all existing property lines and easements in accordance with the map for Tract 2428. 10. The building plan submittal shall include a complete grading and drainage plan showing all existing and proposed contours, walls, grading setbacks, and any wall/fence combinations. Wall/fence combinations shall conform with fence height requirements unless otherwise approved by the Planning Division. 11. The grading plan and supporting drainage report submitted with the building plans shall show and note compliance with the Drainage Design Manual and Post Construction Stormwater Regulations. 12. The building plan submittal shall include a complete site utility plan showing all existing and proposed utilities along with any modifications to the existing infrastructure. 13. Prior to occupancy of the new structures, the developer shall restore all existing improvements damaged or affected during the development of the site, in accordance with the Tract 2428 improvement plans including any private Home Owners Association (HOA) improvements. Separate encroachment permit inspection fees may be required for the Public Works Department inspection/re-inspection of the original subdivision improvements. 14. The building plan submittal shall show and note compliance with the Parking and Driveway Standards unless otherwise approved by the Planning Division. The building plan submittal shall include a Parking Management Plan. The plan shall be approved to the satisfaction of the Planning Division and Transportation Division of Public Works. 15. The building plan submittal, site development plans, and/or landscape plans shall clarify how access controls will be implemented along the creek corridor located westerly of the development. Any proposed plantings and/or fencing shall be approved to the satisfaction of the Planning Division and Sustainability & Natural Resources Official. If approved for deferral, a separate covenant agreement may be required to allow for future access controls implementation to eliminate or reduce encroachment or transit through the creek/riparian corridor. Item 4 Packet Page 225 Resolution No. PC-xxxx-20 3065 Lucca Lane, ARCH-0095-2020 & AFFH-0096-2020 Page 6 16. The building plan submittal shall include a construction management plan to minimize impacts to the existing developed neighborhood including both the public and private improvements, roadways, and driveways. The plan shall be approved to the satisfaction of the Planning Division and Transportation Division of the Public Works Department Building Division – Community Development 17. Construction plans submitted for Building permits shall be designed in accordance with the applicable codes in effect at time of submittal. Review of the general information provided for entitlement is cursory and does not guarantee code compliance for a future construction submittal. Transportation Division – Public Works 18. The property management for the site shall ensure that tandem parking spaces be assigned to a single unit. Plans submitted for a building permit shall show how these spaces will be designated. 19. The property management for the site shall ensure that a bike sharing program is provided to the residents of the development. Prior to occupancy, the applicant shall work with the Transportation Division to develop an appropriate program and provide a document detailing the program to the Community Development Department. Utilities Department 20. The construction plans for sewer and water services shall be in accordance with the engineering design standards in effect at the time the building permit is approved. 21. The proposed utility infrastructure shall comply with the latest engineering design standards effective at the time the building permit is issued and shall have reasonable alignments needed for maintenance of public infrastructure along public roads. 22. The site is within the City’s Water Reuse Master Plan area and landscape irri gation for the project shall utilize recycled water. The project shall connect to the 8” HDPE recycled water main in San Vincenzo Drive to serve the site with recycled water. 23. The project’s estimated total water use (ETWU) to support new ornamental landscaping shall not exceed the project’s maximum applied water allowance (MAWA). Information shall be submitted during the Building Permit Review Process for review and approval by the Utilities Department prior to issuance of a Building Permit to support required water demand of the project’s proposed landscaping. 24. Potable city water shall not be used for major construction activities, such as grading and dust control, as required under Prohibited Water Uses, Chapter 17.07.070.C of the City’s Item 4 Packet Page 226 Resolution No. PC-xxxx-20 3065 Lucca Lane, ARCH-0095-2020 & AFFH-0096-2020 Page 7 Municipal Code. Recycled water is available through the City’s Construction Water Permit program. 25. Projects generating more than two cubic yards of total waste shall comply with AB 1826, and local waste management ordinance to reduce greenhouse gas emissions. 26. Trash enclosure(s) shall conform the requirements by the San Luis Garbage Company and refuse bins shall be sized to provide a reasonable level of service. Separate refuse bins shall be accommodated within the site for the three (3) waste streams, trash, recycling, and organics. 27. Onsite driveways and access routes to all refuse receptacles shall be designed to accommodate the size and weight of the garbage trucks; a written confirmation from the San Luis Garbage Company shall be included in the building permit plans for the proposed project. Indemnification 28. The applicant shall defend, indemnify and hold harmless the City and/or its agents, officers and employees from any claim, action or proceeding against the City and/or its agents, officers or employees to attack, set aside, void or annul, the approval by the City of this project, and all actions relating thereto, including but not limited to environmental review (“Indemnified Claims”). The City shall promptly notify the applicant of any Indemnified Claim upon being presented with the Indemnified Claim and the City shall fully cooperate in the defense against an Indemnified Claim. On motion by ________________, seconded by _________________, and on the following roll call vote: AYES: NOES: REFRAIN: ABSENT: The foregoing resolution was passed and adopted this 9th day of September 2020. _____________________________ Tyler Corey, Secretary Planning Commission Item 4 Packet Page 227 TOSCANO INCLUSIONARY HOUSING entitlements PACKAGE, 09/01/20 Prepared by TEN OVER STUDIO The Toscano Inclusionary Housing Project is designed to bring 38 new affordable residential units to the South Hills area of San Luis Obispo. The buildings are designed to fit in with the existing architectural style of the surrounding neighbors. The site creates new connections to an existing pedestrian pathway and creates pockets of community space that highlight views of the South Hills. Item 4 Packet Page 228 CLIENT HASLO 487 LEFF ST, SAN LUIS OBISPO, CA 93401 CONTACT: MICHAEL BURKE mburke@haslo.org ARCHITECT TEN OVER STUDIO 539 MARSH ST., SAN LUIS OBISPO, CA 93401 805.541.1010 CONTACT: AISLING BURKE aislingb@tenoverstudio.com PROJECT INFO & DATA T1.0 TO T1.1 CONTEXTUAL SITE MAP T1.2 CONTEXTUAL IMAGES T1.3 PRELIM. GRADING & DRAINAGE PLAN C1.0 PRELIM. UTILITY PLAN C2.0 PRELIM. SITE CROSS SECTION C3.0 LANDSCAPE PLAN L1.0 LANDSCAPE PALETTE L1.1 LANDSCAPE PRECEDENTS L1.2 IRRIGATION CALCULATIONS L1.3 SITE PLAN A1.0 BUILDING 01 FIRST FLOOR PLAN A2.0 BUILDING 01 SECOND FLOOR PLAN A2.1 BUILDINGS 02 - 04 FIRST FLOOR PLAN A2.2 BUILDING 05 FIRST FLOOR PLAN A2.3 BUILDINGS 02 - 05 SECOND FLOOR PLAN A2.4 BUILDINGS 01 - 05 ROOF PLANS A2.5 BUILDING 01 ELEVATIONS A3.0 BUILDING 05 ELEVATIONS, 02 - 04 SIM. A3.1 SITE ELEVATIONS A3.2 MATERIAL BOARD A3.3 BUILDING SECTIONS A4.0 ENLARGED FLOOR PLANS A5.0 TO A5.2 PROJECT IMAGES A6.0 TO A6.2 CONTACTS index Item 4 Packet Page 229 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 T1.0 VICINITY MAP SOUTH HILLS OPEN SPACE N MARGARITA AV E . SAN VINCENZO DR.LUCCA LANEPRA D O R D .S. HIGUERA ST.PROJECT LOCATION 3051, 3053, 3055, 3057, 3058, 3065, AND 3067 LUCCA LANE APN's CURRENT USE N/A 50300 SF 1.15 ACRE MAX SITE COVERAGE ALLOWABLE 60%PROPOSED 32.1%, 16157 SF FAR ALLOWABLE N/A PROPOSED N/A DENSITY ALLOWABLE 16/ACRE PROPOSED 30.12/ACRE AFFORDABLE UNITS PROPOSED 38 INCENTIVES PURSUED DENSITY BONUS SETBACK REDUCTION HEIGHT LIMIT ALLOWABLE 35' MAXIMUM PROPOSED 28'-8" MAXIMUM ADJACENT ZONES NORTH EAST SOUTH WEST R-2 C/OC R-2 C/OS SETBACKS FRONT 15' DWELLING, 10' FRONT PORCH OR 20' 17.18.020.A MEDIUM DENSITY SIDE 5' MINUMUM, REFER TO 17.18.020.B TABLE 2-7 REAR 5' MINUMUM, REFER TO 17.18.020.B TABLE 2-8 LAND USE REQUIREMENTS ZONING OVERLAY ZONES SPECIFIC AREA DESIGN GUIDELINES COMBINED LOT SIZE R-2 SP-PD MARGARITA AREA SPECIFIC PLAN ADDRESS PROPOSED USE MULTI-UNIT RESIDENTIAL ALLOWED USE IN ZONE Y ENTITLEMENTS/USE PERMIT REQUIRED N 053-025-038; 053-025-039; 053-025-040; 053-025-041; 053-025-042; 053-025-043; 053-025-044 BUILDING 01 OCCUPANCY R-2, A, B CONSTRUCTION TYPE V-B SPRINKLER SYSTEM NFPA 13 STORIES PROPOSED 2 HEIGHT PROPOSED 28'-4" BUILDING AREA SF 5585 SF BUILDINGS 02-05 OCCUPANCY R-2 CONSTRUCTION TYPE V-B SPRINKLER SYSTEM NFPA 13 STORIES PROPOSED 2 HEIGHT PROPOSED 28'-8" BUILDING AREA SF 5675 SF BUILDING INFO PROJECT DESCRIPTION The project site is an inclusionary housing parcel(s) of a previously approved housing subdivison. The project proposes (5) buildings consisting of (38) low income affordable housing units. The project provides a common area and leasing office of approximately 1009 sf, a play area of approximately 624 sf, and an outdoor amenity space of approximately 750 sf for tenant use. (44) parking spaces will be provided on site and will serve the tenant and common area uses of the project. The proposed tandem spaces will be assigned by the on-site manager, prioritizing three bedroom units. The project will comply with the Tax Credit Large Family Standard by providing minimum 25% of two bedrooms, minimum 25% of three bedrooms, (10) units of each respectively, and the remaining (18) as one bedroom units. This project is located within the City of San Luis Obispo's Airport Area Zone, and the Margarita Area Specific Plan. The project will require review and approval from the Architectural Review Commission hearing and Planning Commission hearing. This project is asking for the following affordable housing concessions: - Density bonus of 89% - Setback reduction A lot merger is forthcoming under a separate planning application to merge 7 parcels into 1. Item 4 Packet Page 230 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 T1.1 DENSITY CALC UNIT TYPE STUDIO / 1 BED 14 0.5 7 1 BEDROOM >600 SF 4 0.66 2.64 2 BEDROOM 10 1 10 3 BEDROOM 10 1.5 15 4+BEDROOM 0 2 0 TOTAL PROPOSED 38 34.64 DENSITY BONUS PROPOSED DENSITY:30.12 UNITS/ACRE 89% 18.40 UNITS DENSITY DENSITY ALLOWED: 16 / ACRE DENSITY ALLOWED: UNIT COUNT DU FACTOR DENSITY CALCULATIONS TOTAL DENSITY ALLOWED COMBINE LOT SIZE: 1.15 ACRE REQUESTED DENSITY BONUS: % LOW INCOME UNITS:100% BUILDING 01 COV'D DECK SF MAIN OCC. SF INCIDENTAL SF ACCESSORY SF BLDG. TOTAL FIRST FLOOR 0 2898 0 0 2,898 SECOND FLOOR 0 2687 0 0 2,687 0 5585 0 0 5585 BUILDINGS 02 - 05 COV'D DECK SF MAIN OCC. SF INCIDENTAL SF ACCESSORY SF BLDG. TOTAL FIRST FLOOR 0 2876 0 0 2,876 SECOND FLOOR 0 2799 0 0 2,799 0 5675 0 0 5675 BUILDING AREA BLDG. TOTAL BUILDING 01 5,585 BUILDING 02 5,675 BUILDING 03 5,675 BUILDING 04 5,675 BUILDING 05 5,675 SITE TOTAL 28,285 SITE BUILDING AREA PARKING PROVIDED RESIDENTIAL USE UNIT COUNT (OR SF) PARKING FACTOR SPACES REQUIRED 1 BEDROOM 18 1 / UNIT 18 2 BEDROOM 10 1 / UNIT 10 3 BEDROOM 10 1 / UNIT 10 BUSINESS 1009 SF 1 SPACE / 300 SF 3 GUEST/COMM.N/A - NOT REQ'D 3 REQUIRED TOTAL 41 PROVIDED TOTAL 44 COMPACT*20 STANDARD 20 ACCESSIBLE 4 ADA SPACES USE # OF SPACES ADA FACTOR ADA REQUIRED RESIDENTIAL 44 1 / 25 SPACES 2 REQ'D TOTAL 2 PROVIDED TOTAL 1 VAN, 1 STD EV READY REQ'D USE # OF REQ'D PKG FACTOR EV READY REQ'D ZONING MULTIFAMILY 44 10% OF SPACES 4 REQ'D TOTAL 4 PROVIDED TOTAL 1 VAN, 1 STD, 2 EV EV CAPABLE REQ'D USE # OF REQ'D PKG FACTOR EV CAPABLE REQ'D ZONING (MORE RESTRICTIVE) MULTIFAMILY 44 50% OF REQ'D SPCS 22 REQ'D TOTAL 22 PROVIDED TOTAL 22 MOTORCYCLE USE # OF SPACES PARKING FACTOR MOTORCYCLE REQ'D RESIDENTIAL 44 1 / 20 @ 10+SPCS 2 REQ'D TOTAL 2 PROVIDED TOTAL 2 PARKING CALCULATIONS *50% ALLOWED TO BE COMPACT IN RESIDENTIAL APARTMENT PROJECTS PER SLO CITY ENGINEERING STANDARD 2230 BICYCLE PARKING REQ'D UNIT COUNT (OR SF) RESIDENTIAL BUILDING 01 6 6 1 / UNIT 6 BUILDING 02 8 8 1 / UNIT 8 BUILDING 03 8 8 1 / UNIT 8 BUILDING 04 8 8 1 / UNIT 8 BUILDING 05 8 8 1 / UNIT 8 BUSINESS 1009 1 1 / 1000 SF 1 GUEST 11 N/A - NOT REQ'D 11 REQUIRED TOTAL 39 1 38 PROVIDED TOTAL 50 12 38 BICYCLE PARKING CALCULATIONS SHORT TERM LONG TERMTOTAL BICYCLE Item 4 Packet Page 231 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 T1.2 contextual SITE map N Item 4 Packet Page 232 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 T1.3 CONTEXTUAL IMAGES Our site is surrounded by newly constructed residences, with more under cosntruction. The buildings range from 2 to 3 stories. The surrounding material pallette is bright- colored stucco and stone with tile roofs and tuscan-style details such as shutters, arched windows and doors, and wood accents. SUMMARY OF CONTEXT Item 4 Packet Page 233 GRADING LEGEND GENERAL LEGEND STORM DRAIN LEGEND: 99 100 GRADING LEGEND GENERAL LEGEND STORM DRAIN LEGEND: 99 100 44 43 42 41 40 39 38 37 36353433323130292827262524232221 20 19 18 17 16 15 1413 1211 109 87 65 43 21 M UP UP UP UP COMPACTCOMPACT COMPACT COMPACT M EV READY EV READY EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE UP UP MAILBOXES FF 178.50 FF 178.45 FF 177.90 FF 177.80FF 176.70 GRADING KEY NOTES: 00 20'40' 20'SCALE: 1" = C1.0 PRELIMINARY GRADING & DRAINAGE PLAN Item 4 Packet Page 234 GENERAL LEGENDGENERAL LEGENDGENERAL LEGEND STORM DRAIN LEGEND: WATER LEGEND: SANITARY SEWER LEGEND: DRY UTILITY LEGEND: STORM DRAIN LEGEND: WATER LEGEND: SANITARY SEWER LEGEND: DRY UTILITY LEGEND: STORM DRAIN LEGEND: 44 43 42 41 40 39 38 37 36353433323130292827262524232221 20 19 18 17 16 15 1413 1211 109 87 65 43 21 M UP UP UP UP COMPACTCOMPACT COMPACT COMPACT M EV READY EV READY EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE UP UP MAILBOXES FF 178.50 FF 178.45 FF 177.90 FF 177.80FF 176.70 WATER KEY NOTES CAUTIONARY KEY NOTES UTILITY GENERAL NOTES SANITARY SEWER KEY NOTES STORM DRAIN KEY NOTES WATER KEY NOTES C2.0 PRELIMINARY UTILITY PLAN 00 20'40' 20'SCALE: 1" = Item 4 Packet Page 235 44 4342 4140 3938373635343332313029282726252423MUPUPUPCOMPACTCOMPACTCOMPACT COMPACTEVREADYEVREADYEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEUPUPMAILBOXESElevationStation BUILDING 01 FF 178.50 BUILDING 04 FF 177.80 DESIGNED BY: CHECKED BY: ISSUED BY: DATE: DAP KDG KDG 09/01/2020 00 20'40' 20'SCALE: 1" = PRELIMINARY SITE CROSS SECTION C3.0 Item 4 Packet Page 236 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 LANDSCAPE PLAN SCALE: 1” = 30’-0” N L1.0 KEYNOTES 1. LOW LANDSCAPE WALL 2. SHADED SEATING / GATHERING SPACE 3. SCREENING VEGETATION 4. PRIVATE BALCONY / PATIO, TYP. 5. MAIN PEDESTRIAN ENTRY 6. PARKING LOT LIGHTING 7. SITE / STRUCTURAL RETAINING WALL 8. OPEN METAL ROD FENCING 9. WOOD SCREEN FENCING OPEN METAL ROD FENCING WOOD SCREEN FENCING (TYP) (TYP) L1 LANDSCAPE LIGHTING SCHEDULE MARK MFR REMARKS CATALOG MUNBER VOLTAGE WATTAGE LAMPING MOUNTING L1 TBD PARKING LOT LIGHTING, MAX. HEIGHT 12' -- - LED CONCRETE FOOTING L2 TBD OUTDOOR PATHWAY LIGHTING -- - LED CONCRETE FOOTING L1 L1 L2 L1 L1 L2 L2 L2 L2 L2 L2L2 L2 L2 L2 L2 L2 L2 L1NO PARKING EV CHARGINGONLYEV CHARGINGONLYUP UP MAILBOXES UP UP UPUP BUILDING 05-C 5675 SF BUILDING 04-B 5675 SF BUILDING 01-A 5585 SF BUILDING 02-B 5675 SF BUILDING 03-A 5675 SF PLAY AREA 640 SF ALLEY LUCCA LANEPRIVATEPARKING 44 SPACES PRIVATE RESIDENCE DRAIN A GE PEDESTRIAN TRAIL& GREENWAYPRIVATE RESIDENCE PRIVATE RESIDENCE PRIVATE RESIDENCE SOUTH HILLS73 1 1 5 2 4 4 3 3 3 3 3 8 99 9 8 8 8 9 6 (TYP) Item 4 Packet Page 237 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 L1.1 LANDSCAPE palette plant palette plant SCHEDULE hardscape palette LIGHTING palette sweet bay concrete-stamped or salted finish, integral color parking lot lighting max. height 12’ pathway lighting options paver: belgard cambridge pattern: cobble color: 50/50 - toscana/ victorian block: split face block color: Margarita cbrw cream brown decomposed granite tan OR GREY, stabilized deer grass gray lavender cottonwhite sage COAST LIVE OAKcallery pear jasmine pink rockrose bee’s bliss sage lavender OLIVEbrisbane box rosemary mock orange amole TREES QTY BOTANICAL / COMMON NAME REMARKS 9 Laurus nobilis / Sweet Bay SIZE: 10`-20` WIDE, 20-30` TALL WUCOLS PF: .1 - .3 20 Lophostemon confertus / Brisbane Box SIZE: 15`-25` WIDE, 40-60` TALL WUCOLS PF: .4 - .6 18 Olea europaea `Swan Hill` TM / Swan Hill Olive SIZE: TO 25` TALL & WIDE WUCOLS PF: <.1 27 Pittosporum tobira / Mock Orange SIZE: 8`-12` WIDE, 12`-16` TALL WUCOLS PF: .1 - .3 6 Pyrus calleryana / Ornamental Pear SIZE: TO 50` TALL & WIDE WUCOLS PF: .4-.6 7 Quercus agrifolia / Coast Live Oak SIZE: TO 40` TALL & WIDE WUCOLS PF: <.1 SHRUB AREA BOTANICAL / COMMON NAME Low Water Use Shrubs and Grasses PLANT SCHEDULE Item 4 Packet Page 238 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 L1.2 LANDSCAPE PRECEDENTS Item 4 Packet Page 239 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 Instructions Plant Water Use Type Plant Factor Cells with blue background are for entering data Very Low 0 - 0.1 Results show in cells with tan background Low 0.1 - 0.3 Errors will show in RED text.Moderate 0.3 - 0.6 High 0.6 - 1.0 1) Enter Plant Factor (PF) The plant factor used shall be from WUCOLS or from horticultural researchers with academic institutions or professional associations as approved by the California Department of Water Resources (DWR). (23 CCR § 492.4)Hydrozone Plant Water Use Type (low, moderate, high) Plant Factor (PF) Hydrozone Area (HA) (ft2) Without SLA Enter Irrigation Type (PF x HA (ft2))/IE Zone 1 Low 0.30 2,472 Drip Irrigation 915.56 2) Enter non-SLA Hydrozone Area (HA) in square feet.Zone 2 Low 0.20 13,452 Drip Irrigation 3321.48 Zone 3 3) Select Irrigation Type from drop-down menu.Zone 4 Drip System Irrigation Efficiency (IE) 0.81 Zone 5 Spray System Irrigation Efficiency (IE) 0.75 Zone 6 Zone 7 4) ETWU results show at the bottom of the page Zone 8 Zone 9 Total Landscape Area (LA) must be equal to the LA in the MAWA calculator.Zone 10 ETWU must be equal to or less than MAWA. Mistakes will show in RED.Zone 11 Zone 12 Zone 13 Zone 14 Zone 15 Zone 16 Zone 17 Zone 18 Zone 19 Zone 20 HA Area 15,924 4,237.04 SLA Total LA 15,924 Results:MAWA= 237,837.7 ETWU= 115,061.0 Gallons 153.8 HCF (Hundred Cubic Feet) per year 0.3531 Acre-feet per year Estimated Total Water Use Enter Values in Blue Cells Tan Cells Show Results ETWU complies with MAWA ETo x 0.62 x [((PF x HA)/IE) + SLA] L1.3 IRRIGATION CALCULATIONS Type of Project Residential ETo of City from MWELO data 43.80 ETo (inches/year)  Overhead Landscape Area (ft2) 15924 Drip Landscape Area (ft2) SLA (ft2) Total Landscape Area 15,924 ft2 as as ere turf Results: (ETo) x (0.62) x [(ETAF x LA) + (1.0 - ETAF) x SLA]237,837.7 Gallons per year 318 HCF (Hundred Cubic Feet) per year 0.730 Acre-feet per year San Luis Obispo Tan Cells Show Results Enter Value in Blue Cells Maximum Applied Water Allowance Calculations Item 4 Packet Page 240 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A1.0 78'-6"57'-10"55'-4"4'-10"SETBACK14'-0" 17'-0" 20'-5"4'-2 1 2"SE TBACK 6'-10" SETBACK20'-812"SETBACK20'-5"SETBACK20'-2"SETBACK20'-2"SETBACK11'-512" SETBACK 5 ' - 5 " 4'-2"5'-0"5'-0"9'-10" 12'-8"10'-8"4'-6"5'-0"32'-212" 23'-3" 22'-0" 7'-6" NO PARKING EV CHARGINGONLYEV CHARGINGONLY20'-5" 44 43 42 41 40 39 38 37 36353433323130292827262524232221 20 19 18 17 16 15 1413 1211 109 87 65 43 21 M UP UP UP UP UP 20'-1012"SETBACK4'-6"4'-1"9'-8" 6'-10"15'-0" PRIVATESLOPE EASEMENT15'-5"5'-0" UTILITYEASEMENT5'-0"4'-0" UTILITY & PEDESTRIAN EASEM E N T COMPACT 15'-5"7'-6"COMPACT COMPACT COMPACTCOMPACT COMPACTCOMPACT COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTM 21'-5"SETBACKUP BUILDING 01-A 5585 SF BUILDING 02-B 5675 SF BUILDING 03-A 5675 SF BUILDING 04-B 5675 SF BUILDING 05-C 5675 SF ALLEY LUCCA LANEPRIVATEPLAY AREA 624 SF PARKING 44 SPACES 5 6 RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT 7 10 2 1 4 3 8 9 9 1 A3.0 2 A3.0 3 A3.0 4 A3.0 1 A3.1 4 A3.1 3 A3.0 REFER TO A2.0 - A2.1 REFER TO A2.2 - A2.3, SIM. REFER TO A2.2 - A2.3, SIM. REFER TO A2.2 - A2.3REFER TO A2.2 - A2.3 2 A3.1 EV READY EV READY EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEEVCAPABLEA B C D E 1 BEDROOM 605 SQ. FT. 1 BEDROOM 605 SQ. FT.1 BEDROOM605 SQ. FT.1 BEDROOM605 SQ. FT. 10 1010 11 10 1 A3.2 2 A3.2 3 A4.05 A4.0 4 A4.0 2 A4.0 1 A4.0 SOUTH HILLS 12 12 N SCALE: 1" = 30'-0"03015 60 1 SITE PLAN SITE PLAN SCALE: 1” = 30’-0” N KEYNOTES 1. PRIVATE BALCONY / PATIO, TYP., SCREEN PATIOS WITH LANDSCAPING 2. MAIN PEDESTRIAN ENTRY 3. SITE / STRUCTURAL RETAINING WALL 4. (E) ALLEY AND PEDESTRIAN CONNECTION TO PEDESTRIAN TRAIL 5. TRANSFORMER 6. TRASH ENCLOSURE AND PAIR GATES WITH ADA ACCESS AT BACK; SIZED FOR (3) 4-YARD DUMPSTERS FOR TRASH, RECYCLING, AND ORGANICS 7. FIRE TRUCK TURNAROUND 8. (E) PEDESTRIAN / BIKE PATH 9. (E) DRAINAGE SWALE 10. SHORT TERM BIKE PARKING, TYP. OF (2) SPACES FOR A TOTAL OF (10) SPACES 11. MAILBOXES, TYP. OF (3) FOR (39) BOXES 12. FENCE AND LANDSCAPING TO SCREEN TANDEM PARKING SPACES, REFER TO L1.0 LANDSCAPE PLAN SETBACKS REFER TO A4.0 SECTIONS A. SETBACK: 5’-5” ALLOWED HEIGHT: 1’ – 12’ ACTUAL HEIGHT: 8’-6” B. SETBACK: 11’-6” ALLOWED HEIGHT: 23’ – 24’ ACTUAL HEIGHT: 20’-3” C. SETBACK: 6’-10” ALLOWED HEIGHT: 1’ – 12’ ACTUAL HEIGHT: 17’-6” HEIGHT EXCEPTION: ADJACENT TO OPEN SPACE D. SETBACK: 4’-2” REQ’D MIN. SETBACK: 5’-0” EXCEPTION: ADJACENT TO OPEN SPACE ALLOWED HEIGHT: 1’ – 12’ ACTUAL HEIGHT: 20’-4” HEIGHT EXCEPTION: ADJACENT TO OPEN SPACE E. SETBACK: 4’-10” ALLOWED HEIGHT: 1’ – 12’ ACTUAL HEIGHT: 24’-9” SETBACK CONCESSION REQUEST BUILDING COLOR LEGEND REFER TO A3.3 MATERIAL BOARD COLOR SCHEME A: BUILDINGS 1 & 3 COLOR SCHEME B: BUILDINGS 2 & 4 COLOR SCHEME C: BUILDING 5 Item 4 Packet Page 241 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A2.0 BUILDING 01 first FLOOR PLAN SCALE: 3/32” = 1’-0” N LEASING OFFICE 133 SQ. FT. ADA BATHROOM 75 SQ. FT. COMMUNITY ROOM 1009 SQ. FT. UP UP 3 BEDROOM 902 SQ. FT. 2 BEDROOM 775 SQ. FT. 28'-112" 38'-712"39'-8" 11'-612"10'-512"24'-6"78'-312" 19'-2"5'-0"16'-6"1'-612"47'-612"4'-10" 24'-412"10'-512"15'-8"8'-1112"5'-0" 38'-712"34'-10"5'-0"3'-0"3'-0"17'-312"13'-6"1'-012"23'-012"39'-612"1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 A B C D E F G H A B C D E F G H 9'-0" 9'-0"3'-0"MECH./ ELEC. 65 SQ. FT. LAUNDRY 147 SQ. FT. MAILBOXES Item 4 Packet Page 242 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A2.1 BUILDING 01 second FLOOR PLAN SCALE: 3/32” = 1’-0” N DN DN 2 BEDROOM 775 SQ. FT. 3 BEDROOM 902 SQ. FT. 1 BEDROOM 485 SQ. FT. 1 BEDROOM 531 SQ. FT. DECK DECK 28'-112" 29'-712"39'-8" 11'-612"10'-512"7'-2"24'-6"69'-312" 12'-0"5'-0"16'-6"1'-612"4'-10" 24'-412"10'-512"11'-312"12'-0"1'-4" 5'-0"24'-712"34'-10"5'-0"3'-0"14'-0"5'-0"16'-6"1'-012"47'-612"22'-612"17'-0"2'-0"3'-0"2'-0"1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 A B C D E F G H A B C D E F G H 23'-012"Item 4 Packet Page 243 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 SCALE: 3/32” = 1’-0” A2.2 N BUILDING 04 first FLOOR PLAN, buildings 02 & 03 sim. 1 BEDROOM 571 SQ. FT. 2 BEDROOM 854 SQ. FT. MECH./ELEC. 100 SQ. FT. FIRE RISER 47 SQ. FT. PATIO PATIO PATIO PATIO UP 3 BEDROOM 1021 SQ. FT.4'-3"23'-712"10'-11"22'-11"33'-10"13'-2"10'-512"4'-6"26'-0"12'-0"66'-212"66'-212"1 2 3 5 6 1 2 3 5 6 53'-0" 6'-0"17'-5"3'-7" 20'-612"5'-0"6'-512" 21'-0"3'-0" 56'-0"24'-1"4'-112"A B C D E F G A B C D E F G 56'-0" 26'-0" 3'-0" 4 4 24'-0"8'-9"1 BEDROOM 605 SQ. FT.38'-0"Item 4 Packet Page 244 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 SCALE: 3/32” = 1’-0” A2.3 N BUILDING 05 first FLOOR PLAN4'-3"23'-712"10'-11"22'-11"33'-10"13'-2"10'-512"4'-6"26'-0"12'-0"66'-212"38'-0"66'-212"1 2 3 5 6 1 2 3 5 6 53'-0" 6'-0"17'-5"3'-7" 20'-612"5'-0"6'-512" 21'-0"3'-0" 56'-0"24'-1"4'-112"A B C D E F G A B C D E F G 56'-0" 26'-0" 3'-0" 4 4 24'-0"8'-9"ELEC. 73 SQ. FT. FIRE RISER 47 SQ. FT. PATIO PATIO PATIO PATIO MECH. 66 SQ. FT. UP 3 BEDROOM 933 SQ. FT. 1 BEDROOM 501 SQ. FT. 1 BEDROOM 533 SQ. FT. 2 BEDROOM 738 SQ. FT. Item 4 Packet Page 245 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A2.4 BUILDINGs 04 & 05 second FLOOR PLAN, buildings 02 & 03 sim. SCALE: 3/32” = 1’-0” N DECK DECK DECK DECK DN 1 BEDROOM 627 SQ.FT.4'-3"23'-712"10'-11"10'-11"33'-10"13'-2"10'-512"4'-6"26'-0"12'-0"66'-212"38'-0"66'-212"1 2 3 5 6 1 2 3 5 6 6'-0" 17'-5"3'-7" 20'-612" 5'-0" 6'-512" 21'-0"3'-0" 56'-0"24'-1"4'-112"A B C D E F G A B C D E F G 51'-0" 26'-0" 3'-0" 4 4 2'-0"12'-0"12'-1"12'-0"24'-0" 2'-0" 24'-0"8'-9"2 BEDROOM 738 SQ. FT. 3 BEDROOM 933 SQ. FT. 1 BEDROOM 501 SQ. FT. Item 4 Packet Page 246 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A2.5 preliminary solar placement SCALE: N.T.S. N BUILDINGs 01 - 05 roof plans buildings 04 & 05building 03building 02building 01 Item 4 Packet Page 247 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A3.0 SECOND FLOOR 11'-0" FIRST FLOOR 0'-0" MAX. ALLOWABLE BLDG. HEIGHT 35'-0" MAX. EAVE HEIGHT 24'-9" MAX. RIDGE HEIGHT 28'-4" 87654321 8 7 6 5 4 3 2 1 H G F E D C B A HGFEDCBA 4. EAST ELEVATION 2. west ELEVATION BUILDING 01 elevations SCALE: 3/32” = 1’-0” 3. north ELEVATION 1. south ELEVATION Item 4 Packet Page 248 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A3.1 SECOND FLOOR 11'-0" FIRST FLOOR 0'-0" MAX. ALLOWABLE BLDG. HEIGHT 35'-0" MAX. EAVE HEIGHT 24'-9" MAX. RIDGE HEIGHT 28'-8" 1 2 3 4 5 6 123456 G F E D C B A GFEDCBA 4. south ELEVATION 2. north ELEVATION SCALE: 3/32” = 1’-0” BUILDING 05 elevations, buildings 02 - 04 sim. 3. EAST ELEVATION 1. west ELEVATION Item 4 Packet Page 249 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A3.2 building 5 SCALE: 1/16” = 1’-0” site elevations building 4building 3 1. SOUTH elevation 2. NORTH elevation building 2building 1 COLOR SCHEME A COLOR SCHEME A COLOR SCHEME B COLOR SCHEME C COLOR SCHEME B Item 4 Packet Page 250 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A3.3 MATERIAL BOARD SIMILAR TO EXISTING TBD - LOCALLY SOURCED SIMILAR TO EXISTING MATCHES EXISTING SIMILAR TO EXISTING MATCHES EXSITING DECORATIVE TILE RISERS ALTERNATING PATTERN AND COLOR STONE SIDING - ALL BUILDINGS CULTURED STONE BY BORAL, PRO-FIT LEDGESTONE SOUTHWEST BLEND ROOF TILE MCA SUPERIOR CLAY ROOFING TILE OLD SANTA BARBARA BLEND STUCCO SIDING COLOR SCHEME A: BUILDINGS 01 & 03 INTEGRAL STUCCO, COLOR TO MATCH SW 7104 STUCCO SIDING COLOR SCHEME C: BUILDING 05 INTEGRAL STUCCO, COLOR TO MATCH SW 7078 STUCCO SIDING COLOR SCHEME B: BUILDINGS 02 & 04 INTEGRAL STUCCO, COLOR TO MATCH SW 0068 Item 4 Packet Page 251 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A4.0 4'-10" SETBACK 23'-812" BLDG. HT.@ SETBACK4'-10" SETBACK 24'-812" BLDG. HT.@ SETBACK35'-0" MAX. ALLOW. BLDG. HT.ABOVE A.N.G.28'-512" MAX. BLDG. HT.176.72' A.N.G. 177.8' FF 35'-0" MAX. ALLOW. BLDG. HT.ABOVE A.N.G.29'-512" MAX. BLDG. HT.174.63' A.N.G. 176.7' FF9'-0"11'-0"9'-0"9'-0"11'-0"9'-0"180.95' A.N.G.178.5' FF 35'-0" MAX. ALLOW. BLDG. HT.ABOVE A.N.G.20'-212" BLDG. HT.@ SETBACK24'-812" MAX. BLDG. HT.21'-812" SETBACK 8"3'-612"7'-1034"1'-4"183.58' A.N.G. 178.45' FF 17'-6" BLDG. HT.@ SETBACK6'-912" SETBACK 35'-0" MAX. ALLOW. BLDG. HT.ABOVE A.N.G.23'-6" MAX. BLDG. HT.SETBACK EXCEPTION, REFER TO A1.0 REQUIRED SIDE SETBACK, REFER TO CITY OF SLO ZONING REGULATIONS 17.18.020.B TABLE 2-7 35'-0" MAX. ALLOW. BLDG. HT.ABOVE A.N.G.24'-7" MAX. BLDG. HT.180.22' A.N.G.177.9' FF SETBACK EXCEPTION, REFER TO A1.0 20'-4" @ SETBACK5'-2" SETBACK 9'-0"11'-0"9'-0"9'-0"11'-0"9'-0"9'-0"11'-0"9'-0"BUILDING SECTIONS 01 02 03 0405 1. building 1 NORTH-SOUTH SECTION 2. building 2 EAST-WEST SECTION 3. building 3 NORTH-SOUTH SECTION 4. building 4 NORTH-SOUTH SECTION 5. building 5 NORTH-SOUTH SECTION Item 4 Packet Page 252 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A5.0 enlarged floor plans 1. THREE BEDROOM UNIT TYPICAL BUILDINGS 2-5 2. three bedroom unit TYPICAL BUILDING 1 CL KITCHENLIVING ROOM BED 1 BED 2 BED 3 CL CL BATH BED 1 BED 2 BED 3 BATH KITCHEN LIVING ROOM CL CL CL SCALE: 3/16” = 1’-0” Item 4 Packet Page 253 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A5.1 enlarged floor plans 1. TWO BEDROOM UNIT TYPICAL BUILDING 1 2. TWO bedroom unit TYPICAL BUILDING 2-5 SCALE: 3/16” = 1’-0” KITCHEN LIVING ROOM BED 1 BED 2 CL CL BATH LIVING ROOM KITCHEN BATH BED 1 BED 2 CL CL Item 4 Packet Page 254 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A5.2 enlarged floor plans 1. ONE BEDROOM UNIT TYPICAL BUILDING 1 2. ONE bedroom unit 3. ONE bedroom unit TYPICAL BUILDING 1 TYPICAL BUILDING 2-5 SCALE: 3/16” = 1’-0” BED 1 LIVING ROOM LIVING ROOM LIVING ROOM BED 1 BED 1 KITCHEN KITCHEN KITCHEN CL CL CL BATH BATH BATH Item 4 Packet Page 255 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 A6.0 AERIAL VIEW 01 02 03 0405 Item 4 Packet Page 256 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 01 02 03 0405 A6.1 VIEW FROM sidewalk Item 4 Packet Page 257 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com TOSCANO SUBDIVISION SAN LUIS OBISPO, CA DATE: 09/01/20 01 02 03 0405 A6.2 VIEW FROM pedestrian site entry Item 4 Packet Page 258 Item 4 Packet Page 259 Item 4 Packet Page 260 Item 4 Packet Page 261 Item 4 Packet Page 262 Item 4 Packet Page 263 Item 4 Packet Page 264 Meeting Date: June 15, 2020 Item Number: 2 Item No. 1 ARCHITECTURAL REVIEW COMMISSION REPORT 1.0 PROJECT DESCRIPTION AND SETTING The proposed project consists of five new two-story structures, which will contain 38 low income affordable units, a community room, and a leasing office. The residential units provided will be mix of sizes including ten three-bedroom, ten two-bedroom, and 18 one-bedroom units. The new structures are proposed within the Toscano residential development, on lots dedicated for affordable housing units, and will be accessed from San Vincenzo Drive by way of Lucca Lane. The project is within the Margarita Area Specific Plan (MASP) and part of Planned Development overlay, which covers all of the Toscano Development. The project proposes 44 surface parking spaces, with 20 compact spaces and 14 spaces provided in a tandem arrangement. The also project provides a play area and outdoor amenity space for tenant use. The project is proposed as a 100% affordable housing project and includes two affordable housing incentives requests, which are subject to Planning Commission review: 1) a standard incentive, 80% density bonus; and 2) an alternative incentive, exception to the minimum setback requirements of the Planned Development overlay to allow a four-foot setback where five feet would normally be required (Attachment 1, Project Plans). The Planning Commission will review these aspects of the proposal at an upcoming commission hearing. General Location: The 1.21-acre project site is comprised of seven existing parcels with access from San Vincenzo Drive, by way of Lucca Lane, which is a private street. The project site is flanked on the east and west by dedicated open space (drainage and pedestrian trails). The uses of the two adjacent properties to the north and three properties to the south are single family residences, either built or under construction. The property has a slight slope from south to north, as the area leads up to South Hills Open Space. The project site is within an area of the MASP where affordable housing density bonuses are available. Present Use: Undeveloped lots Zoning: Medium-Density Residential, Specific Plan and Planned Development Overlay zone (R-2-SP-PD) FROM: Shawna Scott, Senior Planner BY: Kyle Van Leeuwen, Assistant Planner PROJECT ADDRESS: 3065 Lucca Lane FILE NUMBER: ARCH-0095-2020, AFFH-0096-2020 APPLICANT: Scott Smith, San Luis Obispo REPRESENTATIVE: Aisling Burke, Ten Over Studio Non-Profit Housing Corporation ____________________________________________________________________________________________________ For more information contact: (Kyle Van Leeuwen) at 781-7091 or kvanleeuwen@slocity.org Figure 1: Subject Property Item 4 Packet Page 265 ARCH-0095-2020, AFFH-0096-2020 3065 Lucca Lane Page 2 General Plan: Medium Density Residential Surrounding Uses: East: Dedicated Open Space West: Dedicated Open Space North: Single-Unit Dwellings (under construction) South: Single-Unit Dwellings 2.0 PROPOSED DESIGN Architecture: Tuscan Style Design details: Two-story structures with one-, two-, and three-bedroom units, and a 1,009-square foot community room and leasing office, with outdoor amenities including a children’s play area. Structures feature low-pitched roofs, window awnings, porches, and balconies, with exterior stairs for access to second floor units. Materials: Stucco and stone exterior walls, clay tile roofs, and decorative tiles on external stairways. Colors: Cotton White, Copen Blue (light green), Minute Mauve Figure 2: Rendering of project design as seen from parking area within the site Item 4 Packet Page 266 ARCH-0095-2020, AFFH-0096-2020 3065 Lucca Lane Page 3 3.0 FOCUS OF REVIEW The ARC’s role is to review the project in terms of its consistency with the Margarita Area Specific Plan, Community Design Guidelines and applicable City policies and standards. As noted above, the proposed affordable housing incentive requests for a reduced setback 80% density bonus will be reviewed by the Planning Commission at a subsequent hearing. Margarita Area Specific Plan: https://www.slocity.org/home/showdocument?id=4070 Community Design Guidelines: https://www.slocity.org/home/showdocument?id=2104 4.0 MARGARITA AREA SPECIFIC PLAN AND COMMUNITY DESIGN GUIDELINES DISCUSSION ITEMS The proposed development must be consistent with the requirements of the General Plan, Zoning Regulations, Margarita Area Specific Plan (MASP) and Community Design Guidelines (CDG). While the architectural styles identified in the MASP are preferred, .the specific plan does not mandate a specific design but instead encourages flexibility in design with an emphasis on details and construction materials leading to environmentally superior projects, including higher density and increased affordability. The MASP does state that building designs must be consistent with the CDG. Staff has identified and focused the discussion items below related to consistency with the CDG. Highlighted Sections Discussion Items Chapter 5 – Residential Project Design §5.2.E.2 Open space and natural features The project is located between two areas dedicated as open space. The ARC should discuss how well the project is designed to provide maximum visibility of these areas. §5.2.F Exterior finish materials (c.) The project primarily utilizes two materials, stucco and stone, on the exterior of the structures, to providing visual interest. The ARC should discuss whether all sides of the structure employ the same materials, design details, and window treatments, ensuring that the structure looks like the same building from all sides. §5.4.B Parking and driveways (2.) Entrance to the project site is by way of an existing private street consisting primarily of pavers, and the project proposes the use of pavers for the parking spaces. The ARC should discuss if the paving treatments proposed create an attractive entry drive to the site. §5.4.C.3 Balconies porches and patios The project includes the use of patios and balconies for the residences. The ARC should discuss whether their use efficiently breaks up large wall masses and adds human scale to the structures. §5.4.C.5 Exterior stairways The ARC should discuss if the external stairways provide residents and visitors protection from weather, and if the materials and accents match the main structure. Item 4 Packet Page 267 ARCH-0095-2020, AFFH-0096-2020 3065 Lucca Lane Page 4 5.0 PROJECT STATISTICS The project site is within a Planned Development overlay (PD) and a specific plan overlay (SP). Each overlay, and their associated regulatory documents, provide varying standards applicable to the project. Where the Planned Development overlay provides a specific standard (setback, density, etc.) that standard takes precedent (Attachment 2). Where the Planned Development does not provide a specific standard, the specific plan standards are applied. Where the Planned Development and specific plan do not provide a specific standard, the Zoning Regulations standards are applied. Site Details Proposed Allowed/Required Street Setback (from center line) 15’ -4” feet 15’ (total easement width) Side Setback 3 4’* 5’ Density (units/acre) 2 28.6 (80% Bonus)* 16 Maximum Height of Structures 1 29 feet 35 feet Max Building Coverage 3 31% 75% Total # Parking Spaces 1 44 41 Environmental Status Project is consistent with previously approved environmental reviews for the Planned Development Overlay and tract map 12019 Zoning Regulations - 2Margarita Area Specific Plan - 3Planned Development ordinance *Incentive or exception requests for PC consideration 6.0 ACTION ALTERNATIVES 6.1 Recommend approval of the project, based on consistency with the Margarita Area Specific Plan and Community Design Guidelines. 6.2 Continue the project. An action continuing the application should include specific direction to the applicant and staff on pertinent issues, including references to design guidelines. 6.3 Recommend denial of the project based on inconsistency with the Margarita Area Specific Plan and Community Design Guidelines. An action recommending denial should cite the basis of the recommendation and reference inconsistency with the General Plan, CDG, MASP, Zoning Regulations or other policy documents. 7.0 ATTACHMENTS 1. Project Plans 2. City Council Ordinance No. 1506 (2007) Item 4 Packet Page 268 Minutes ARCHITECTURAL REVIEW COMMISSION Monday, June 15, 2020 Regular Meeting of the Architectural Review Commission CALL TO ORDER A Regular Meeting of the Architectural Review Commission was called to order on Monday, June 15, 2020 at 5:00 p.m. via teleconference, by Chair Allen Root. ROLL CALL Present: Commissioners Richard Beller, Michael DeMartini, Mandi Pickens, Micah Smith, Vice Chair Christie Withers and Chair Allen Root Absent: None Staff: Senior Planner Shawna Scott and Deputy City Clerk Megan Wilbanks PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA None End of Public Comment-- PUBLIC HEARING 1.Project Address: 3065 Lucca (Toscano Development); Case #: ARCH -0095-2020 & AFFH-0096-2020; Zone: R-2-SP-PD; Housing Authority of San Luis Obispo, owner/applicant. Review of a new inclusionary housing development consisting of five, two- story structures containing a total of 38 low-income affordable units, community room, and leasing office, on a site designated for affordable housing. The project includes an 80% density bonus, as a standard incentive for projects consisting of 100% affordable housing. The project also includes a reduction in setback requirements, requested as an alternative incentive, allowing a setback of four feet, where five feet is the minimum required within the Planned Development (PD) overlay zone. This project is consistent with the Mitigated Negative Declaration approved with the PD rezone and Map No. 2428 (CEQA). Assistant Planner Kyle Van Leeuwen presented the staff report and responded to Commissioner inquiries. Applicant representative, Joel Snyder, responded to Commissioner inquiries. Item 4 Packet Page 269 Minutes – Architectural Review Commission Meeting of June 15, 2020 Page 2 Public Comments: Dave Menghrajani Gail Ryff Shelby Ohyama End of Public Comment-- ACTION: MOTION BY COMMISSIONER WITHERS FAILED FOR LACK OF A SECOND. ACTION: MOTION BY COMMISSIONER PICKENS SECOND BY COMMISSIONER WITHERS, CARRIED 6-0-0, to recommend that the Planning Commission approve the project with the following recommendations: Provide screening at second floor decks (semi-solid deck railings) Consider speed control (traffic calming) Require buffer and screening between tandem parking and the adjacent neighbors Recommend the Planning Commission consider connectivity of circulation on this site and public transit opportunities to serve this site Consider expanding landing and weather protection at top of stairs on Building one COMMENT AND DISCUSSION Senior Planner Shawna Scott provided a brief agenda forecast. ADJOURNMENT The meeting was adjourned at 6:28 p.m. The next Regular meeting of the Architectural Review Commission is scheduled for Monday, July 7, 2020 at 5:00 p.m. via teleconference. APPROVED BY THE ARCHITECTURAL REVIEW COMMISSION: 07/06/2020 Item 4 Packet Page 270 3065 Lucca LaneARCH-0095-2020, AFFH-0096-2020Review of a new inclusionary housing development consisting of five, two-story structures containing a total of 38 low-income affordable units, community room, and leasing office, on a site designated for affordable housing, with two requested incentives; an 89% density bonus and a reduction in setback standards. September 9, 2020Applicant: San Luis Obispo Non-Profit Housing Corporation1 Focus of Review2PC review due to: New residential development of more than 10 units, Request for density bonus as an alternative incentive. PC Purview:Review the project in terms of its consistency with the General Plan, Margarita Area Specific Plan, Zoning Regulations, and applicable City standardsEvaluate requested density bonus and incentives. 9-9-2020 Item 4 - Staff Presentation3 Project Description4Five New Two-Story Residential Buildings38 Low-Income Units; mix of one-, two-, and three-bedroom apartmentsCommunity Room and Leasing OfficePlay Area44 Surface Parking Spaces Vehicle Access from Lucca LaneBicycle and Pedestrian Access from San Vincenzo Drive via Pedestrian Trail (east edge of site) 9-9-2020 Item 4 - Staff Presentation5 9-9-2020 Item 4 - Staff Presentation6 Affordable Housing Alternative Incentives789% Density Bonus Allow a four-foot side setback where five feet is the normal requirement AB 1763 & Gov. Code 659158As of Jan. 1st, projects that are 100% affordable can receive an 80% Density Bonus as a Standard Incentive. A development may provide onsite parking through tandem parking or uncovered parking, but not through on street parking 9-9-2020 Item 4 - Staff Presentation9 Previous Review: ARC10June 15, 2020, Found the project consistent with Community Design Guidelines and Margarita Area Specific Plan. Screening at second floor decksConsider speed control or traffic calming measuresRequire buffer/screening at tandem parking Consider connectivity/circulation and public transit Consider expanding landing and weather protection Previous Review: ARC11Screening at second floor decksProvide additional privacy for balconies Reduce the impacts of visual clutterMay be inconsistent with the Tuscan architectural style of the project Previous Review: ARC12Consider speed control or traffic calming measuresCondition #6: Plans submitted for a building permit shall include a speed bump, tabletop, or other traffic calming measure near the vehicle entrance to the site, to the satisfaction of Transportation Division of the Public Works Department and Community Development Director Previous Review: ARC13Require buffer/screening at tandem parkingCondition #7:Plans submitted for a building permit shall show a low wall, fence, or other form of permanent improvement near the western edge of the site,parallel and directly adjacent to the tandem parking spaces… Previous Review: ARC14Consider connectivity/circulation and public transit No route changes or additional transit stops are currently planned for the immediate five-year horizonre-evaluation may occur as other developments in the area progressPedestrian access to the residential units is provided through the bicycle and pedestrian path located to the east of the site, consistent with MASP Previous Review: ARC15Consider expanding landing and weather protectionFive-foot by five-foot area at the top of the stairways of Building 1 is partially coveredPC should discuss if expansion of this area is warrented 20079-9-2020 Item 4 - Staff Presentation16 32 Multifamily Units20079-9-2020 Item 4 - Staff Presentation17 201626 Multifamily Units9-9-2020 Item 4 - Staff Presentation18 201738 Multifamily Units (proposed)9-9-2020 Item 4 - Staff Presentation19 Toscano Website9-9-2020 Item 4 - Staff Presentation20 Creek Setback21The PD Ordinance (2007) was approved to accommodate Creek Protection:Finding 3 …The approved modifications to the development standards of Zoning Regulations through the PD Overlay are necessary and appropriate to accommodate (…) successful mitigation of environmental impacts, because doing so enables concentrating more units with in the central portion of the site to achieve higher densities prescribed by the MASP while (…) allowing the open space lots to be centered on the alignment of the three drainage ways in their natural state. Creek Setback22Planning Commission Staff Report (2007):The proposed subdivision design shows roughly 10 to 20-foot setbacks from the top of creek bank or edge of riparian vegetation to building envelopes consistent with Section 17. 16. 025 of the zoning regulations (creek setback ordinance). Exception approved with map addressed bike/ped trail on conservation/open space lots RecommendationAdopt the Draft Resolution approving the new inclusionary housing development consisting of 38 low-income affordable units, a community room, and leasing office subject to findings and conditions of approval. 9-9-2020 Item 4 - Staff Presentation Disclosure RequirementCondition 16.  The building plan submittal shall include a construction management plan to minimize impacts to the existing developed neighborhood including both the public and private improvements, roadways, and driveways. The plan shall be approved to the satisfaction of the Planning Division and Transportation Division of the Public Works Department. The approved construction management plan, as well as an approximate timeline for construction activities, shall be shared with all residential units that take access from Lucca Lane and with the Toscano Homeowners Association. 9-9-2020 Item 4 - Staff Presentation 9/9/2020 Item 4 ‐ Applicant Presentation 1 1 2 9/9/2020 Item 4 ‐ Applicant Presentation 2 3 4 9/9/2020 Item 4 ‐ Applicant Presentation 3 Project Description 6 Five New Two-Story Residential Buildings 38 Low-Income Units; mix of one-, two-, and three- bedroom apartments Community Room and Leasing Office Play Area 44 Surface Parking Spaces Vehicle Access from Lucca Lane Bicycle and Pedestrian Access from San Vincenzo Drive via Pedestrian Trail (east edge of site) 5 6 9/9/2020 Item 4 ‐ Applicant Presentation 4 7 8 9/9/2020 Item 4 ‐ Applicant Presentation 5 Affordable Housing Alternative Incentives 9 89% Density Bonus Allow a four-foot side setback where five feet is the normal requirement AB 1763 & Gov. Code 65915 10 As of Jan. 1st, projects that are 100% affordable can receive an 80% Density Bonus as a Standard Incentive. A development may provide onsite parking through tandem parking or uncovered parking, but not through on street parking 9 10 9/9/2020 Item 4 ‐ Applicant Presentation 6 Previous Review: ARC 12 June 15, 2020, Found the project consistent with Community Design Guidelines and Margarita Area Specific Plan. Screening at second floor decks Consider speed control or traffic calming measures Require buffer/screening at tandem parking Consider connectivity/circulation and public transit Consider expanding landing and weather protection 11 12 9/9/2020 Item 4 ‐ Applicant Presentation 7 Previous Review: ARC 13 Screening at second floor decks Provide additional privacy for balconies Reduce the impacts of visual clutter May be inconsistent with the Tuscan architectural style of the project Previous Review: ARC 14 Consider speed control or traffic calming measures Condition #6: Plans submitted for a building permit shall include a speed bump, tabletop, or other traffic calming measure near the vehicle entrance to the site, to the satisfaction of Transportation Division of the Public Works Department and Community Development Director 13 14 9/9/2020 Item 4 ‐ Applicant Presentation 8 Previous Review: ARC 15 Require buffer/screening at tandem parking Condition #7: Plans submitted for a building permit shall show a low wall, fence, or other form of permanent improvement near the western edge of the site, parallel and directly adjacent to the tandem parking spaces… Previous Review: ARC 16 Consider connectivity/circulation and public transit No route changes or additional transit stops are currently planned for the immediate five-year horizon re-evaluation may occur as other developments in the area progress Pedestrian access to the residential units is provided through the bicycle and pedestrian path located to the east of the site, consistent with MASP 15 16 9/9/2020 Item 4 ‐ Applicant Presentation 9 Previous Review: ARC 17 Consider expanding landing and weather protection Five-foot by five-foot area at the top of the stairways of Building 1 is partially covered PC should discuss if expansion of this area is warrented 2007 17 18 9/9/2020 Item 4 ‐ Applicant Presentation 10 32 Multifamily Units2007 2016 26 Multifamily Units 19 20 9/9/2020 Item 4 ‐ Applicant Presentation 11 2017 38 Multifamily Units (proposed) Toscano Website 21 22 9/9/2020 Item 4 ‐ Applicant Presentation 12 Creek Setback 23 The PD Ordinance (2007) was approved to accommodate Creek Protection: Finding 3 …The approved modifications to the development standards of Zoning Regulations through the PD Overlay are necessary and appropriate to accommodate (…) successful mitigation of environmental impacts, because doing so enables concentrating more units with in the central portion of the site to achieve higher densities prescribed by the MASP while (…) allowing the open space lots to be centered on the alignment of the three drainage ways in their natural state. Creek Setback 24 Planning Commission Staff Report (2007): The proposed subdivision design shows roughly 10 to 20-foot setbacks from the top of creek bank or edge of riparian vegetation to building envelopes consistent with Section 17. 16. 025 of the zoning regulations (creek setback ordinance). Exception approved with map addressed bike/ped trail on conservation/open space lots 23 24 9/9/2020 Item 4 ‐ Applicant Presentation 13 Recommendation Adopt the Draft Resolution approving the new inclusionary housing development consisting of 38 low- income affordable units, a community room, and leasing office subject to findings and conditions of approval. Disclosure Requirement Condition 16.  The building plan submittal shall include a  construction management plan to minimize impacts to the existing  developed neighborhood including both the public and private  improvements, roadways, and driveways. The plan shall be  approved to the satisfaction of the Planning Division and  Transportation Division of the Public Works Department. The  approved construction management plan, as well as an  approximate timeline for construction activities, shall be shared  with all residential units that take access from Lucca Lane and with  the Toscano Homeowners Association.  25 26