Loading...
HomeMy WebLinkAbout4. Location of Project (PLANS)1 TITLE SHEET 2 abbreviations AP - ANGLE POINT BB - BEGIN BRIDGE BC - BEGIN OF CURVE OR BACK OF CURB Bk SW - BACK OF SIDEWALK BVCE - BEGIN OF VERTICAL CURVE ELEVATION BVCS - BEGIN OF VERTICAL CURVE STATION C&G - CURB AND GUTTER EB - END BRIDGE ELEV/Elev - ELEVATION Eng - ENGINEERING ETW - EDGE OF TRAVEL WAY EVCE - END VERTICAL CURVE ELEVATION EVCS - END VERTICAL CURVE STATION Exist - EXISTING FG - FINISHED GRADE FL - FLOWLINE K - HORIZONTAL DISTANCE REQUIRED FOR 1% CHANGE IN SLOPE OF A VERTICAL CURVE LIP - LIP OF GUTTER LVC - LENGTH OF VERTICAL CURVE MAX - MAXIMUM MOD - MODIFIED OG - ORIGINAL GROUND "PC" - PROPOSED CENTERLINE ALIGNMENT PCC - PORTLAND CEMENT CONCRETE PG - PROFILE GRADE PRC - POINT OF REVERSE CURVE PVI - POINT OF VERTICAL INTERSECTION R/W - RIGHT OF WAY STA - STATION Std - STANDARD SW - SIDEWALK TC - TOP OF CURB UPRR - UNION PACIFIC RAILROAD 7 SURVEY CONTROL LAYOUT - "PC" 9+60 TO 14+50 Reference Documents: City Standard Specifications - May 2018 Edition City Engineering Standards - May 2018 Edition Caltrans Standard Plans - 2018 (State R/W only) Caltrans Standard Specifications - 2018 (State R/W only) UPRR - BNSF Railway Guidelines for Railroad Grade Separation Projects - January 2016 http://www.up.com/customers/ind-dev/operations/specs/track CPUC General Orders - http://www.cpuc.ca.gov/generalorders/ 1.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR PERMITTEE TO CONTACT "UNDERGROUND SERVICE ALERT OF NORTHERN CALIFORNIA" BY PHONE AT 8-1-1 FORTY-EIGHT (48) HOURS PRIOR TO START OF CONSTRUCTION FOR LOCATION OF POWER, TELEPHONE, OIL AND NATURAL GAS UNDERGROUND FACILITIES. CONTRACTOR OR PERMITEE SHALL ALSO CONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OF CABLE T.V., WATER, SEWER, DRAINAGE OR UNDERGROUND FACILITIES. 2.THE CONTRACTOR SHALL POSSESS A CLASS 'A' LICENSE AT THE TIME THE CONTRACT IS AWARDED. sheet no.description 1 10680 White Rock Rd., Suite 100 Rancho Cordova, California 95670 4/30/2020 1 85 APPROVED BY SPECIFICATION NO. FILE NO./LOCATION DATE OF SHEET San Luis Obispo County, California Manuel Guzman, Construction Engineering Manager for Matthew Horn City Engineer Railroad Safety Trail Taft to Pepper Project general notes: 15-22 CONSTRUCTION DETAILS TEMPORARY WATER POLLUTION CONTROL PLAN 32 DRAINAGE PLAN 24-27 DRAINAGE PROFILES UTILITY PLAN SANITARY SEWER PLAN 34-37 38-39 33 3-6 TYPICAL SECTIONS WATER LINE PLAN & PROFILE40 DETOUR PLAN PAVEMENT DELINEATION & SIGN PLAN TREE REMOVAL PLAN SUMMARY OF QUANTITIES LIGHTING PLAN 41 49-52 42-45 62-63 PAVEMENT DELINEATION & SIGN QUANITITES46-48 91375 53-54 BRIDGE PLANS64-85 28-31 CONTOUR GRADING 23 PICKET RAILING 14 PROFILE - "PC" 23+50 TO 27+62 13 PROFILE - "PC" 19+50 TO 23+50 12 PROFILE - "PC" 14+50 TO 19+50 11 PROFILE - "PC" 9+60 TO 14+50 8 LAYOUT - "PC" 14+50 TO 19+50 9 LAYOUT - "PC" 19+50 TO 28+65 10 LAYOUT - U.S. ROUTE 101 ON/OFF RAMP "R1" 50+00 TO 53+25 LANDSCAPE SHEETS55-61 R.C.E. C78236 Approval Date CONFORMED DRAWINGS ////// ///WMJP WVWV/// ////// S ///////////////////// FO ELEC S S S S DD FO WV 2-ICV ICV ICV WV WV S S CO ///WMWMWMWMJP JPJP WV WV GwTEL G3429265.549TOP RR RAIL S6 3464265.727TOP RR RAIL S6 3465265.710TOP RR RAIL S6 3484265.745TOP RR RAIL S6 //////////////////////// / /////////////// // ///// //////////////////////WV WV WV WV WV WV WM WM JP JPCOWV JP ///wJPPGETEL2-WM CATV AT&T CATV JPG TVG D CO WMCATV COGWMGVGTVTELPGECOWMTELWMCATV PGE FOFOFO ///WV WV COS ////////// / / / / /////////////JPT / / ////(3) REC ICV IRR H20 REC ICV //////////////////////////////////////////WMJP WVWVS /// FO ELEC S S S S DD FO WV 2-ICV ICV ICV WV WV S S CO WMWMWMWMJP JPJP WV WV GwTEL G3429265.549TOP RR RAIL S63464265.727TOP RR RAIL S6 3465265.710TOP RR RAIL S6 3484265.745TOP RR RAIL S6 //// ///////////WV WV WV WV WV WV WM WM JP JPCOWV JPwJPPGETEL2-WM CATV AT&T CATV JPG TVG D CO WMCATV CO G WM GVGTVTELPGECO WMTELWMCATVPGE FOFOFO WV WV COS JPT (3) REC ICV IRR H20 REC ICV CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85SURVEY CONTROL1" = 100' 2PC-1 PAVEMENT STRUCTURAL SECTIONS: "PC" LINE"PC" LINE "PC" LINE CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 NOTES:TYPICAL SECTIONSN.T.S 3X-1 "PC" LINE "PC" LINE "PC" LINE "PC" LINE CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85TYPICAL SECTIONSN.T.S 4X-2 NOTES: "PC" LINE "PC" LINE "PC" LINE "PC" LINE CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85TYPICAL SECTIONSN.T.S 5X-3 NOTES: "PC" LINE "PC" LINE "PS" LINE "R1" LINE "R1" LINE CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85TYPICAL SECTIONSN.T.S 6X-4 NOTES: // / /////////////////////////// /// /// ///////////////////// S /////////////////////////////////////////////////////////////////////////// /////////FO ELEC WVWV ///////// / /////////////// /// /// CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN LEGEND LAYOUT - "PC" 9+60 TO 14+501"=20' 7L-1 NOTES:PAVEMENT STRUCTURAL SECTIONS SECTION A-A DETAIL 1 / / / /// //////////// /////////ELEC S FO ICV ICV WV 3484265.745TOP RR RAIL S6///////// /// /// / // / // / ///// / // / /// // / ///// //////////////////////////////////////////////////////////////////////////////WV /// /// /// /// /// / // /// CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN LAYOUT - "PC" 14+50 TO 19+501"=20' 8L-2 NOTES: DETAIL 3 DETAIL 4 DETAIL 2 UTL UTLUTLUTL S WV 2-ICV 3429265.549TOP RR RAIL S6 3464265.727TOP RR RAIL S6 3465265.710TOP RR RAIL S6 ////////////////////////////////////////////////////////////////////////JP WVWVS DD S S //////////////////CO ///////////////////// / //WMWMWMWMJP JPJP WV WV GwTEL G///////// / /// ///////////JP G D ////// /// COWMCATV PG E FOFOFO ////////////////////////COD //////////////////Δ CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85LAYOUT - "PC" 19+50 TO 28+651"=20' 9L-3 DETAIL A NOTES: ///////////// // / // / ///// /// ////// /////////////////////////////////WV WV WV WM GWM////////////// / / / / / / / / / / / / / / / / / /// / / / / / / / /// ////////////////////////////////////////JPT / / / / / ////IRR H20 REC ICV // / / / ////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN LAYOUT - U.S. ROUTE 101 ON/OFF RAMP "R1" 50+00 TO 53+251"=20' 10L-4 CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PROFILE PROFILE - "PC" 9+60 TO 14+501"=20' H & 1'=2' V 11P-1 "PC" LINE CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PROFILE PROFILE - "PC" 14+50 TO 19+501"=20' H & 1'=2' V 12P-2 "PC" LINE CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PROFILE PROFILE - "PC" 19+50 TO 23+501"=20' H & 1'=2' V 13P-3 "PC" LINE CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PROFILE PROFILE - "PC" 23+50 TO 27+621"=20' H & 1'=2' V 14P-4 "PC" LINE / / / / / /////////////////////////// /// /// ///////////////////// S //////////////////////////////////////////////////////////////////////////////// /////////FO WVWV /////////////// / /////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN LEGENDNOTES:CONSTRUCTION DETAILS - REMOVAL PLAN15 1"=20' CD-1 / / / /// //////////// /////////ELEC S FO ICV ICV WV 3484265.745TOP RR RAIL S6///////// /// /// / // /// / ///// / // / /// // /// ////// /////////////////////////////////////////////////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85CONSTRUCTION DETAILS - REMOVAL PLAN16 1"=20' CD-2 PLAN UTL UTLUTLUTL S WV 2-ICV 3429265.549TOP RR RAIL S6 3464265.727TOP RR RAIL S6 3465265.710TOP RR RAIL S6 //////////////////////////////////// ///////////////////////////JP WVWVS DD S S CO ///////////////WMWMWMWMJP JPJP WV WV GwTEL G///////// // /////////////JP G DWMCATV // / /// COTELWMCATV PGE FOFOFO ///////////////WVCO CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85CONSTRUCTION DETAILS - REMOVAL PLAN17 1"=20' CD-3 PLAN PLAN ///////////////// // / // / // / ////////////// //////////////////////////////WV WV WV WM GWM//////////////////////////////////////////////////////////// / / / / / / / / / / / / / / / / / / / / / / / / / / / / / ///////////////////////////////////////////JPT / / / / / ///////////////////IRR H20 REC ICV // / / / /////////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85CONSTRUCTION DETAILS - REMOVAL PLAN18 1"=20' CD-4 PLAN ///////////////////// S ////// WV / /// / / / / / PG E CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PATH ENDING DETAIL "PC" 27+38 T0 27+79.33 SIDEWALK ACCESS DETAIL "PC" 12+88 TO 13+04 ACCESS RAMP DETAIL "PC" 10+33 PHILLIPS LANE CONNECTION DETAIL "PC" 24+12.50 CONSTRUCTION DETAILSAS SHOWN 19CD-5 NOTES: xxxxxxWV /// /// /// / // CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PATH CROSSING DETAIL "PC" 16+35.31 TO 16+92.36 CONSTRUCTION DETAILS1"=20' 20CD-6 NOTES: ////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85CONSTRUCTION DETAILS1"=20' 21CD-7 CURB RAMP 1 "R1" 52+48.99 TO 52+55.35 NOTES: CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 CURB TRANSITION MODIFIED CURB (TYPE A3-8) WROUGHT IRON FENCE DETAIL NOTE:CONSTRUCTION DETAILSAS SHOWN 22CD-8 STAIRWAY PLAN DETAIL ELEVATION A-A INTERFACE BETWEEN WALL & PATH CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 ELEVATION SECTION A-A SECTION B-B AT BRIDGE DECK SECTION B-B AT ROADWAY TYPICAL TOP RAIL DETAIL TYPICAL BOTTOM RAIL DETAIL SECTION D-D SECTION C-C BASE PLATE DETAIL PICKET RAILING- 23CD-9 PLAN-STAGGER DETAIL / / / /////////////////////////// /// /// ///////////////////// S /////////////////////////////////////////////////////////////////////////// /////////FO ELEC WVWV ///////// / ////// CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN TEMPORARY WATER POLLUTION CONTROL PLAN1"=20' 24WPC-1 LEGENDNOTES: / / / /// //////////// /////////ELEC S FO ICV ICV WV 3484265.745TOP RR RAIL S6///////// /// / // / // /// / // / // / // / // / // / // ////// /////////////////////////////////////////////////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN TEMPORARY WATER POLLUTION CONTROL PLAN1"=20' 25WPC-2 LEGENDNOTES: UTL UTLUTLUTL S WV 2-ICV 3429265.549TOP RR RAIL S6 3464265.727TOP RR RAIL S6 3465265.710TOP RR RAIL S6 ////////////////////////////////////JP DD S ///////////////////////// / / /////////////JP G D ////// /// COWMCATV PGE FOFOFO /////////COCITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85TEMPORARY WATER POLLUTION CONTROL PLAN1"=20' 26WPC-3 LEGEND NOTES: PLAN PLAN ///////////////// // / // / // / ////////////// //////////////////////////////WV WV WV WM GWM//////////////////////////////////////////////////////////// / / / / / / / / / / / / / / / / / / / / / / / / / / / / / ///////////////////////////////////////////JPT / / / / / ///////////////////IRR H20 REC ICV // / / / /////////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85TEMPORARY WATER POLLUTION CONTROL PLAN1"=20' 27WPC-4 PLAN LEGENDNOTES: / / / /////////////////////////// /// /// ///////////////////// S /////////////////////////////////////////////////////////////////////////// /////////FO ELEC WVWV ///////// / ///CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN CONTOUR GRADING PLAN1"=20' 28G-1 / / / /// //////////// /////////ELEC S FO ICV ICV WV 3484265.745TOP RR RAIL S6///////// /// / // / // /// / // / // / // / // / // / // ////// /////////////////////////////////////////////////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN CONTOUR GRADING PLAN1"=20' 29G-2 UTL UTLUTLUTL S WV 2-ICV 3429265.549TOP RR RAIL S6 3464265.727TOP RR RAIL S6 3465265.710TOP RR RAIL S6 ////////////////////////////////////JP DD S ///////////////////////// / / /////////////JP G D ////// /// COWMCATV PGE FOFOFO /////////COCITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85CONTOUR GRADING PLAN1"=20' 30G-3 PLAN PLAN ///////////////// // / // / // / ////////////// //////////////////////////////WV WV WV WM GWM//////////////////////////////////////////////////////////// / / / / / / / / / / / / / / / / / / / / / / / / / / / / / ///////////////////////////////////////////JPT / / / / / ///////////////////IRR H20 REC ICV // / / / /////////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85CONTOUR GRADING PLAN1"=20' 31G-4 PLAN / ///// ////////////xxxxxxxxxxxxxxxxxxxxxxxxxxxx////////// /// / // /// / // / // / // SS //////////////////////////////////////////xxxxxxxxxxxxxxxxxxDD ////////////////////////////////////// / / //////////////////////////////////////////D ////// /////////S CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN DRAINAGE PLAN1"=20' 32D-1 PLAN DRAINAGE PLAN SHEETS LEGEND AND NOTES NOTES: DRAINAGE SYSTEM No. CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 DRAINAGE SYSTEM No.DRAINAGE PROFILES1"=10' H & 1'=5' V 33DP-1 NOTES: / / / /////////////////////////// /// /// /////////////// S //////////////////////////////////////////////////////////////////////// /////////FO ELEC WVWV ////// / ///CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN LEGEND UTILITY PLAN1"=20' 34U-1 ABBREVIATION NOTE / / / /// //////////// /////////ELEC S FO ICV ICV WV 3484265.745TOP RR RAIL S6///////// /// /// / // /// / // / // / // / // / // / // ////// /////////////////////////////////////////////////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN UTILITY PLAN1"=20' 35U-2 NOTE UTL UTLUTLUTL S WV 2-ICV 3429265.549TOP RR RAIL S6 3464265.727TOP RR RAIL S6 3465265.710TOP RR RAIL S6 //////////////////////////////S S S //////////////////////////////////////////JP WVWVS DD S S //////////////////CO ////////////////WMWMWMWMJP JPGwTEL G/////// / / ////////////JP G D ////// /// CO PG E FOFOFO /////////COCITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85UTILITY PLAN1"=20' 36U-3 ///////////////// // / // / // / ////////////// //////////////////////////////WV WV WV WM GWM//////////////////////////////////////////////////////////// / / / / / / / / / / / / / / / / / / / / / / / / / / / / / ///////////////////////////////////////////JPT / / / / / ///////////////////IRR H20 REC ICV // / / / /////////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85UTILITY PLAN1"=20' 37U-4 PLAN / ///// //////////// S S FO ICV ICV WV////////// /// / // /// / // / // / // S //////////////////////////////////////////WMJP WVWVS DD WV 2-ICV S S ///////////////////////////WMWMWMJP JPGwTEL G////// / / //////////////////JP////////////////////////G D ////// /// CO PGE FOFOFO //COS CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN SANITARY SEWER PLAN1"=20' 38SS-1 PLAN NOTES: CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PROFILE SANITARY SEWER PROFILE1"=10' 39SS-2 SEWER SYSTEM ////////////////////////////////////////////////WMJP WVWVxxxxxxS DD S S //////////////////CO ///////////////WMWMWMWMJP JPGwTEL GJP ////////////PG E FOFOFO /////////S CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN WATER LINE PLAN & PROFILE1"=20' 40W-1 PROFILE CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85DETOUR PLAN1"=40' 41DE-1 NOTES: LEGEND CONSTRUCTION AREA SIGNS ↑ //////////////////////////////////////////////////////////// S ////// /// /////////FO ELEC WVWV CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN PAVEMENT DELINEATION AND SIGN PLAN1"=20' 42PD-1 NOTES:LEGEND: DETAIL A DETAIL B / / / /// //////////// /////////xxxxxxxELEC S FO ICV ICV WV //////////////////////////////////////////////// /// / // / // / ///// /// ////////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN PAVEMENT DELINEATION AND SIGN PLAN1"=20' 43PD-2 xxxxxS WV 2-ICV /////////////////////////////////////////////////////////////////////JP WVWVS D S S CO ///////////////////// / /WMWMWMWMJP JPJP WV WV GwTEL G/////// / / // / ////////////JP G D ////// /// COWMCATV PGE FOFOFO ////////////////////////COCITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85PAVEMENT DELINEATION AND SIGN PLAN1"=20' 44PD-3 PLAN PLAN //////////////////////////////////////////////////////// // / // / // / //////// ////////////////////////////////////WV WV WV WM GWM///////////////////////////////////////////////////////// /// // / / / ///////////////////////////////////////// / / / / ///////////////////IRR H20 REC ICV CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN PAVEMENT DELINEATION AND SIGN PLAN1"=20' 45PD-4 CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85PAVEMENT DELINEATION AND SIGN QUANTITIESNTS 46PDQ-1 CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85PAVEMENT DELINEATION AND SIGN QUANTITIESNTS 47PDQ-2 CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85PAVEMENT DELINEATION AND SIGN QUANTITIESNTS 48PDQ-3 / / / /////////////////////////// /// /// /////////////// S //////////////////////////////////////////////////////////////////////// /////////FO ELEC WVWV ////// / ///CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN LEGEND TREE REMOVAL PLAN1"=20' 49PR-1 / ///// //////////// /////////ELEC S FO ICV ICV WV 3484265.745TOP RR RAIL S6///////// /// / // /// / // / // / // / // / // /// / // /// /// //////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 PLAN TREE REMOVAL PLAN1"=20' 50PR-2 LEGEND UTL UTLUTLUTL S WV 2-ICV 3429265.549TOP RR RAIL S6 3464265.727TOP RR RAIL S6 3465265.710TOP RR RAIL S6 ////////////////////////////////////JP DD S ///////////////////////// / / /////////////JP G D ////// /// COWMCATV PG E FOFOFO /////////COCITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85TREE REMOVAL PLAN1"=20' 51PR-3 LEGEND ///////////// // / // / ///// /// ////// /////////////////////////////////WV WV WV WM GWM////////////// / / / / / / / / / / / / / / / / / /// / / / / / / / /// ////////////////////////////////////////JPT / / / / / ////IRR H20 REC ICV // / / / ////////////////////////////////////////////CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85TREE REMOVAL PLAN1"=20' 52PR-4 LEGEND PLAN SUMMARY OF QUANTITIESN.T.S 53Q-1 CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 NOTES: NOTES:SUMMARY OF QUANTITIESN.T.S 54Q-2 CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 4/30/20 A. BEDAL A. BEDAL J. CONKLIN M. IMBRIANI (CITY USE) of 85 STATION L-1 6' Rt "PC" 12+88 1 L-2 6' Rt "PC" 16+80.60 1 L-2 6' Lt "PC" 16+80.60 1 L-3 10.08' Lt "PS" 102+67.80 1 L-3 19.22' Rt "PS" 102+67.80 1 L-4 62.17' Rt "R1" 52+55.35 1 6 CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 01/24/2020 P. BOYD K. JONES P. BOYD M. IMBRIANI (CITY USE) of 85IRRIGATION LEGEND 55IL-1 ////////////////////////////////////WV WV WV WM GWM///////////////////////////////////////////// /// // / / / /////////////////////////////////////////////////////////////////////////JPT / / / / / / / / / / / / / / /////////////////////////////////////(3) REC ICV IRR H20 REC ICV * * CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 01/24/2020 P. BOYD K. JONES P. BOYD M. IMBRIANI (CITY USE) of 85IRRIGATION PLAN56 1" =20'-0" IP-1 CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 01/24/2020 P. BOYD K. JONES P. BOYD M. IMBRIANI (CITY USE) of 85IRRIGATION QUANTITIES57IQ-1 CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 01/24/2020 P. BOYD K. JONES P. BOYD M. IMBRIANI (CITY USE) of 85PLANT LEGEND58PL-1 ////////////////////////////////////WV WV WV WM GWM///////////////////////////////////////////// /// // / / / /////////////////////////////////////////////////////////////////////////JPT / / / / / / / / / / / / / / /////////////////////////////////////(3) REC ICV IRR H20 REC ICV CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 01/24/2020 P. BOYD K. JONES P. BOYD M. IMBRIANI (CITY USE) of 85PLANTING PLAN59 1" =20'-0" PP-1 / ///// //////////// S S FO 2-ICV ICV ICV WV /// / // /// / // / // / // / // / /// // /// / ///////////////UTL UTLUTLUTL WV 2-ICV S ////////// / / /// //////////////////////////////////////////G D CATV ////// /// COTELWMCATV PGE COCITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 01/24/2020 P. BOYD K. JONES P. BOYD M. IMBRIANI (CITY USE) of 85PLANTING PLAN60 1" =20'-0" PP-2 CITY SPECIFICATION NO. DATE:PROJECT TITLE:RAILROAD SAFETY TRAIL - TAFT TO PEPPERSHEET TITLE:SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 91375 01/24/2020 P. BOYD K. JONES P. BOYD M. IMBRIANI (CITY USE) of 85PLANT QUANTITIES61PQ-1 SFOICVICVWVUPPRSWV2-ICVUPPRLEGEND (THIS SHEET ONLY) CONSTRUCTION NOTES (THIS SHEET ONLY)CITY SPECIFICATION NO.DATE:PROJECT TITLE: RAILROAD SAFETY TRAIL - TAFT TO PEPPER SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONSPEC NO02-14-2085JRAMJRM. IMBRIANI(CITY USE)LIGHTING PLANSCALE: 1" = 20'62MATCH LINE - STA 19+50 SEE BELOW LEFT CALIFORN IA BOULEVARDE-1SEE ABOVE RIGHTMATCH LINE - STA 19+50 MATCH LINE - STA 23+50 SEE SHEET E-2 NOTE: PLAN SCALE: 1" = 20' PLAN SCALE: 1" = 20' JPWVWVSDDSSCOWMWM WM WMJPJP Gw TELG JPPGETELJPTVSIGNGDAC PATCHWMCATVCO PGECOWMTELWMCATVPGE FO FO FOCOUPPR BRIDGE LIGHT DETAILSNOT TO SCALEFRONT VIEWSIDE VIEWANCHOR BOLT ENLARGEMENTLEGEND (THIS SHEET ONLY) CONSTRUCTION NOTES (THIS SHEET ONLY)CITY SPECIFICATION NO.DATE:PROJECT TITLE: RAILROAD SAFETY TRAIL - TAFT TO PEPPER SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONSPEC NO02-14-2085JRAMJRM. IMBRIANI(CITY USE)LIGHTING PLANSCALE: 1" = 20'63SEE SHEET E-1MATCH LINE - STA 23+50PEPPER STREETPHILLIPS LANE GENERAL NOTES (SHEETS E-1 & E-2 ONLY)E-2 PLAN SCALE: 1" = 20'REPLACED PER ADDENDUM NO. 2DATED JUNE 16, 2020REPLACED PER ADDENDUM NO. 6DATED JULY 1, 20202112 WMJP DD WV 2-ICV S S JP G D CO PG E COPLAN DEVELOPED ELEVATION TYPICAL SECTION GENERAL PLAN NO. 164B-1 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERPROFILE GRADE BENTS 2 THRU 4 SDCOPGETYPICAL SECTION PLAN ELEVATION PROFILE GRADE UPRR TOR PROFILE GRADE GENERAL PLAN NO. 265B-2 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERRR SUBDIVISION: COAST RR MILE POST: 251.15 LATITUDE: 35.287769 LONGITUDE: -120.657885 1 DATED JULY 9, 2020 1 REPLACED PER ADDENDUM No.71 MINIMUM CONSTRUCTION CLEARANCE ENVELOPE CALTRANS STANDARD PLANS DATED 2015 INDEX TO PLANS PILE DATA TABLE GENERAL NOTES LOAD AND RESISTANCE FACTOR DESIGN UPRR GENERAL NOTES GENERAL NOTES66B-3 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERSPREAD FOOTING DATA TABLE φ φ ARS CURVE DECK CONTOURS67B-4 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERPLAN CONCRETE STRENGTH AND TYPE LIMITS TYPICAL SECTIONS AT PREFAB TRUSS AT APPROACH STRUCTURES APPROACH STRUCTURE DECK ELEVATIONS68B-5 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERPLAN PLAN PLAN WMJP S DD WV 2-ICV S S JP G D COWMCATV PGE FOFOCOPLAN FOUNDATION PLAN69B-6 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPER ABUTMENT LAYOUT70B-7 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERABUTMENT 1 ABUTMENT 8 ELEVATIONELEVATION PLAN PLAN ABUTMENT DETAILS71B-8 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERWINGWALL DETAILS ELEVATION PLAN SECTION A-A SHEAR KEY DETAILS PARTIAL ELEVATION PARTIAL PLAN POST POCKET DETAIL SECTION C-C SECTION B-B SECTION D-D BENTS 2 THRU 4 LAYOUT AND DETAILS72B-9 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERELEVATION PLAN SECTION C-C SECTION D-D SECTION E-E BENT 5 LAYOUT73B-10 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERELEVATION PLAN VIEW F-F SECTION G-G BENT 5 DETAILS74B-11 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERSECTION J-JSECTION H-H SECTION K-K BENT 6 LAYOUT75B-12 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERELEVATION PLAN VIEW L-L SECTION M-M BENT 6 DETAILS76B-13 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERSECTION N-N SECTION P-P SECTION Q-Q BENT 7 LAYOUT AND DETAILS77B-14 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERELEVATION PLAN SECTION R-R SECTION A-A CIDH CONCRETE PILING DETAILS78B-15 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERPILE DETAIL SECTION S-S EXCAVATION AND BACKFILL LIMITS OF PAYMENT FOR TYPICAL SECTIONS79B-16 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERAPPROACH STRUCTURE No. 2 TYPICAL SECTION APPROACH STRUCTURE No. 1 TYPICAL SECTION PREFAB STEEL TRUSS TYPICAL SECTION DRAINAGE DETAILS80B-17 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERABUTMENT 1 DRAINAGE ABUTMENT 8 DRAINAGE PLANPLAN ELEVATIONELEVATION SECTION T-T SECTION U-U ELEVATED SIDEWALK LAYOUT AND DETAILS81B-18 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERSECTION Y-Y SECTION X-X PLAN SECTION W-W TYPE A SEAL WV RETAINING WALL No. 16 GENERAL PLAN82B-19 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERDEVELOPED ELEVATION PLAN TYPICAL SECTION D RETAINING WALL No. 26 GENERAL PLAN83B-20 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERMIRRORED ELEVATION PLAN TYPICAL SECTION D RETAINING WALL No. 27 GENERAL PLAN84B-21 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: B. SCHOPPE DRAWN BY: A. CARDOZA CHECKED BY: F. ARIDI APPROVED BY: M. IMBRIANI SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERELEVATION PLAN TYPICAL SECTION //////////////////////////////x/////////////// / ///////////////////////////// / //////////////////B-6 B-4 B-5 91375 CITY SPECIFICATION NO. 4/29/20 DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. 85 DESIGNED BY: M. DOGAN DRAWN BY: A. CARDOZA CHECKED BY: S. LECK APPROVED BY: S. LECK SCALE: AS SHOWN PLAN FILE NO. / LOCATION (CITY USE)RAILROAD SAFETY TRAIL - TAFT TO PEPPERLOG OF TEST BORINGS85B-22 PLAN PROFILE