Loading...
HomeMy WebLinkAboutApplications (WO)Active Applications - by Status Walter Oetzell, Assistant Planner Friday, May 1, 2020 Completeness Check 2 FiledCompleteLast DIR-0177-2020 (1101 Pacific) Reduction in parking by a total of 1 space to provide room for a single ADA Van Accessible parking space. Re-striping of the existing parking lot to allow for 1 way traffic to flow correctly from Pacific Street to Osos Street 4/15/2020 Kris Kroll (Will Ruoff) ARCH-0187-2020 (1941 Monterey) Add decorative Board & Batten facade on lobby building adjacent to street. 4/27/2020 Sean Willard, PRG SLO, LLC (Jackie Nieto) Under Review 6 FiledCompleteLast SBDV-0731-2019 (2600 Broad) Voluntary lot merger 10/30/2019 5/21 follow up: Pending receipt of final documents from applicant for Engineering review and recordation 11/27/2019 NHC SLO LLC (Leaha Magee, MBS Land Surveys) HIST-0036-2020 (1156 Peach) A historic significance determination request to remove the property at 1156 Peach Street from the City’s Contributing historic properties list 1/21/2020 5/16 notification form for 6/7 Council; 4/27 CHC 2/13/2020 Ivan L. Lapidus (Charles Crotser) HIST-0048-2020 (858 Toro) Mills Act Historical Property Contract for the Virginia Levering Latimer House 1/29/2020 5/11 notification form for 6/2 Council; 4/27 CHC 2/14/2020 Eric Blair HIST-0127-2020 (778 Higuera) A historic significance determination request to remove the property at 778, 782, 786, and 790 Higuera from the City’s Contributing historic properties list 3/4/2020 5/1 noticing for 5/18 CHC (continuance); 6/2 CC? Randy Russom, RRM Design Group SBDV-0762-2019 (1422 Monterey) LLA - PRELMINARY MAP SLOAL 19-0100: Proposed lot line adjustment at 1422 Monterey Street, between parcels 1 and 4 11/13/2019 5/9 45 days from completeness 3/25/2020 2/24/2020 Monterey Plaza Enterprises, LLC (Harry Hamilton, Above Grade Engineering) HIST-0144-2020 (1789 Santa Barbara) A request to designate the single-family dwelling at 1789 Santa Barbara Avenue (The Lozelle and Katie Flickinger Graham House) as a Master List Resource and include the property in the City’s Inventory of Historic Resources 3/12/20204/11/2020 Michael Hughes (James Papp) Ready for Action 2 FiledCompleteLast SBDV-0819-2019 (664 Upham) Merge two lots into a single lot 12/10/2019 5/7 Follow up (Eng needs recording fee): 4/2 Final merger documents received, forwarded to Eng (SL) for signature and recordation 1/9/2020 Studio Prime, Inc. ARCH-0022-2020 (1140 Iris) Rucker Shop/Garage & Apartment: New two-story two-bedroom apartment with an attached three- story tower feature, and ground-level garage, workshop, and craft room space, on a Contributing List Historic Property 1/13/2020 5/7 letter due for 5/11 action; 4/27 CHC Review; Minor 2/13/2020 Dave & Karen Rucker (Greg Wynn) Action Pending 1 FiledCompleteLast MOD-0153-2020 (280 Higuera) Modification of Architectural Review approval (ARCH 0426-2019) : new building entry; relocated signage area; and revisions to the design of the roof parapet, awnings, and tile bulkhead 3/30/2020 4/27 draft letter w/TC; Modifies ARCH-0426-2019 4/16/2020 Megan Souza, MOM SLO LLC Action Taken 1 FiledCompleteLast ARCH-0150-2019 (564 Higuera) The Lofts at the Creamery: A four-story mixed-use project of 36 residential dwellings and 68 sq ft of commercial space; a request for a 22 percent density bonus, alternate parking requirement, four-space parking reduction (standard and additional affordable housing incentive) 2/28/2019 4/29 Follow up: 4/23 responded about additional incentives (re sewer condition; 3/10 Appealed; 2/26 PC (final action) 6/6/2019 5/8/2019 Damien Mavis; Creekside Lofts, LP (Scott Martin; RRM Design Group) Pending 12 FiledCompleteLast SBDV-1999-2018 (500 Mountain View) Review of a minor subdivision of one lot into two in the R-1-S zone, on a sloped lot (approximately 25% slope) 12/7/2018 5/26 follow up re: 4/6 follow up email; Pending background information and EID application (Initial Study); 10/25 DRT Comment Overdue € 1/4/2019 12/7/2018 John Holloman (Scott Stokes, Above Grade Engineering) DIR-0332-2019 (75 Palomar) Setback exception for parking within street setback (for single-family dwelling) 5/22/2019 5/6 follow-up (2/6 email); (see MOD-0333-2019) 6/21/2019 81 Broad, LLC (Bryan Ridley, Bracket Architecture) MOD-0333-2019 (75 Palomar) Review of a request to delete a condition of the parcel map SLO 77 212 (Condition #6), which requires that the final parcel map note that Parcel 2 (the subject property) is not a buildable lot 5/22/2019 5/6 90-day follow-up (2/6 email) 6/21/2019 81 Broad, LLC (Bryan Ridley, Bracket Architecture) ARCH-0407-2019 (1100 Grove) Review of an a two-story addition (700 sf) of additional office space and one-bedroom unit to an exisitng 1,300 sf dental office 6/24/2019 7/28 check on: progress since 4/29 email re inactivity (7/24 incomplete letter, last confirmation 1/24) Dr. Gassan Aro, DDS (Wesley Azzouz) DIR-0670-2019 (506 High) Setback exception for proposed front porch. Exception for 1-car garage & tandem parking 10/10/2019 5/5/ follow up re: 4/29 email (need F&W application information and contact); 2/6 F&W permitting under review; 10/29 Incomplete Jeremy Rubin (Rodel Honrada) ARCH-0442-2019 (1356 Breck) Breck Street Duplex: Construction of a 3-story duplex and a 120 square-foot addition to an existing duplex 7/5/2019 7/28 follow up on 4/29 email re: status (2/6 to have new architect) 10/17/2019 9/23/2019 Bailey Asset Management (Andrew Goodwin Designs (will change)) USE-0801-2019 (1772 Calle Joaquin) Proposed new unmanned AT&T wireless facility, consisting of a 65' tall monopine with supporting equipment 11/27/2019 5/4 follow up (90-day): applicant working on response to 12/20 Incomplete AT&T (Lexy Graham, Vinculums) ARCH-0115-2020 (1230 Monte Vista) Monte Vista Apartments: Minor Architectural Review for demolition of an existing 1-story apartment building and parking lot for 2 new 3-story duplex buildings for a total of 4 units. 3/2/2020 5/14 Follow up on: 4/1 Incomplete (letter sent) MVP, LLC (Aisling Burke, Ten Over Studio) ARCH-0090-2020 (207 Higuera) 207 Higuera Mixed-Use: Construction of a 16-unit apartment complex 2/18/2020 4/22 Incomplete (CC2) 4/7/2020 Scott Stokes, 207 Higuera LLC USE-0655-2019 (265 Madonna) SN90XS294-L (281 Madonna): Install a telecommunications facility on an existing pole in the PROW 10/1/2020 4/29 follow up on inactivity; (from Cassidy 4/17) David McFeeters, ExteNet Systems (Ari Gibanov, Nexius Solutions) DIR-0654-2019 (1241 Johnson) SN90XS351-L: Install a telecommunications facility on an existing pole in the PROW 10/1/2020 4/29 follow up on inactivity; (from Cassidy 4/17) David McFeeters, ExteNet Systems (Ari Gibanov, Nexius Solutions) USE-0656-2019 (10 Hathway) SN90XS342-M (117 Longview Ln): Install a telecommunications facility on an existing pole in the PROW 10/1/2020 4/29 follow up on inactivity; (from Cassidy 4/17) David McFeeters, ExteNet Systems (Ari Gibanov, Nexius Solutions) 24