Loading...
HomeMy WebLinkAbout1-24-2020 190072S. CHAVES CONSTRUCTION, INC.(LONG FORM)CREW TIMECARD DATE: JOB NO: Job Name: Weather: Qty Qty Qty Qty Qty Qty Qty Qty Qty START TIME LUN Y N FINISH TIME ************Do Not Write In This Column********** NAME / EQUIPMENT CRAFT or MAKE 7:00 y 3:30 McHenry, Sean OEF 7:00 y 4:00 Furness, Matthew Scott Lbr Gonzalez, Seve Lbr 7:00 y 3:30 Juel, Todd OE 7:00 y 4:00 Rhodes, Ryan OEF 7:00 y 3:30 Tracey, Paul Lbr 7:00 y 3:30 Sanchez, Jacinto LbrAp 7:00 y 4:00 Valle-Reyes, Prisiliano Lbr 7:00 y 4:00 Sinkovich, Brett OE 7:00 y 3:30 Maestas, Albert Lbr 7:00 y 3:30 Rojas, Rudolph Lbr 7:00 y 3:30 Davis, John OE 7:00 y 3:30 Warren, Gary OE 7:00 Y 3:30 Roberts, Kurt Lbr 7:00 Y 3:30 Scalise, Anthony OEF 7:00 Y 3:00 Johnson, Eric OE 2012 Peterbilt Dump Truck Peterbilt Hitachi ZX85-5 Excavator Hitachi 2015 289D Skid Steer Loader 0 JD 210LEP Skiploader 2017 Deere Bobtail Dump Truck Ford 2018 Ram 2500 RAM JD 2016 35G Mini-X Deere JD 410G Backhoe Deere 2016 GMC Sierra C2500 GMC 2019 Ram 5500 Utility RAM 2018 Ram 5500 RAM 2015 GMC Sierra 2500 - 4 Door GMC 2012 Chevy Silverado C2500 Chevrolet START TIME LN FINISH TIME QTY Subcontractors Craft Hrs Cost Code Work Performed 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0358.0 8.0 36 8.0 8.0 292 8.0 8.0 307 6.0 2.0 8.0 47 8.0 5.0 13 3.0 2.0 5.0 283 5.0 6.0 298 8.0 8.0 311 6.0 6.0 282 6.0 6.0 232 6.0 5.0 306 3.0 3.0 6.0 305 4.0 1.0 8.0 E327 7.5 7.5 E322 8.0 8.0 E299 8.0 8.0 e296 8.0 8.0 e309 8.0 8.0 e325 8.0 8.5 e345 8.0 8.0 e346 3.0 5.5 8.0 e373 1.0 4.0 3.5 8.5 e374 8.0 8.5 e367 1.0 7.0 8.0 e365 8.5 0.0 e351 6.0 2.0 8.0 e349 8.0 e350 4.0 4.5 8.5 e339 8.0 Temp:7 2 0 1 . 1 0 0 7 2 0 1 . 2 0 0 7 2 0 5 . 3 0 0 7 2 2 2 . 1 0 0 TOTAL HOURS Shift:Day DAILY LUNCH BREAK 12:00 - 12:30 EMPLOYEE or EQUIP NO 7 2 4 2 . 1 0 0 1/24/2020 DO NOT WRITE IN SHADED AREAS 190072 Superintendent: Murray waterline QC-SSHO: sunny Cost Code / Quantity Performed QTY or HRS Cost Code Hrs PAGE: OF:KEYED BY:RECORD # Orders / Direction Given: By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment. SIGNATURE: Incidents: Meetings: ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION Visitors On Site Cost Code Rental Equipment, Vendor Rented From & Ticket # Accident Lost Time or Other Describe Incident YES NO x Cost Code Trucking / Other (Include Ticket #'s)QTY Materials Used