HomeMy WebLinkAbout10-31-19 190072S. CHAVES CONSTRUCTION, INCORPORATED (SHORT FORM) CREW TIMECARD
DATE:
JOB NO:
Job Name:
Weather:
Qty Qty Qty Qty Qty Qty Qty Qty Qty
START
TIME
LN
Y
N FINISH TIME
************Do Not Write In This Column**********
NAME / EQUIPMENT CRAFT
or MAKE
7:00 Y 3:30 McHenry, Sean OEF
GMC Sierra C2500 GMC
7:00 Y 3:30 Sinkovich, Brett OE
2012 Peterbilt Dump Truck Peterbilt
JD 210LEP Skip Loader Deere
7:00 Y 3:30 Roberts, Kurt Lbr
GMC Sierra 2500 - 4 Door GMC
7:00 Y 3:30 Juel, Todd OE
2018 Ram 2500 RAM
Hitachi ZX85-5 Excavator Hitachi
7:00 Y 3:30 Furness, Matthew Scott Lbr
7:00 Y 3:30 Tracey, Paul Lbr
7:00 N 9:00 Price-Baker, Isaiah LbrAp
7:00 Y 3:30 Maestas, Albert Lbr
START
TIME LN FINISH TIME QTY
QTY or
HRS Cost Code
Hrs
Incidents:
Meetings:
Orders / Direction Given:
We started with traffic control setup (Kurt, Paul, Isaiah and Albert) and continued with excavation of pipe joints. Each section of pipe measured out at 20lf. Todd excavated, Scott spotted, Brett drove the 10 wheeler, Albert and
Isaiah flagged, Kurt and Paul installed joint restraints. Mark @ SLO city inspected the restraints and gave the ok for backfill. We backfilled the trench to 6" below top of AC. We plated and coned off the west side of Murray. We
did find an MJ sleeve (not on the plans) within 3lf of a tee fo the fire hydrant, Mark looked into a way to restrain the sleeve and tee. We plated the west side of Murray and installed cold mix around the plates. We then moved to
the east side to begin excavation of joints. We found the first joint at 2:45. We plated and cold mixed the plates. Todd and Paul pulled a plate on Meineke and measured th O.D. of the existing 6" CI pipe for materials to tie the
line together.
RECORD #KEYED BY:
TOTAL
HOURS
8.0
8.0
8.0
7.0
E299
306
8.0
E345 1.0
E350
E367
8.0
7.0
1.0
8.0
8.0
8.0 8.0
8.0
8.0
7.0 1.0
4.0
8.0
4.0
7
2
0
1
.
2
0
0
8.0
8.0
8.0
DO NOT WRITE IN SHADED AREAS
8.0
8.0
Cost Code / Quantity Performed
8.0
7
2
1
8
.
1
0
0
8.0
E371 1.0
305
8.0
PAGE: OF:
Cost Code
Craft Hrs Cost Code
Materials Used
Work Performed
2.0
Superintendent:
7
2
0
1
.
1
0
0
QC-SSHO:
1.0
YES
QTY
Subcontractors
Trucking / Other (Include Ticket #'s)
8" PVC/CI pipe restraints7218.100
Accident Lost Time or
Other
By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment.
SIGNATURE:
NO
Visitors On Site
ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION
Isaiah had to leave, his son was sick. Albert had an appointment (physical therapy) and had to leave at 2:30
10/31/2019
Temp:43°/ 73°
Shift:7:00am - 3:30pm
SLO Water
EMPLOYEE
or EQUIP
NO
Cost Code Rental Equipment, Vendor Rented From & Ticket #
298
1.07.0
190072
Describe Incident
Clear
DAILY LUNCH BREAK 12:00 - 12:30
E351
Steve, Derek, Ryan and Sean met with Mark to discuss the sleeve and the upcoming weeks of the project.
Install split megalugs with ductile iron lugs and all thread to restrain the joints.
E339
47
E346
282
36