Loading...
HomeMy WebLinkAbout10-31-19 190072S. CHAVES CONSTRUCTION, INCORPORATED (SHORT FORM) CREW TIMECARD DATE: JOB NO: Job Name: Weather: Qty Qty Qty Qty Qty Qty Qty Qty Qty START TIME LN Y N FINISH TIME ************Do Not Write In This Column********** NAME / EQUIPMENT CRAFT or MAKE 7:00 Y 3:30 McHenry, Sean OEF GMC Sierra C2500 GMC 7:00 Y 3:30 Sinkovich, Brett OE 2012 Peterbilt Dump Truck Peterbilt JD 210LEP Skip Loader Deere 7:00 Y 3:30 Roberts, Kurt Lbr GMC Sierra 2500 - 4 Door GMC 7:00 Y 3:30 Juel, Todd OE 2018 Ram 2500 RAM Hitachi ZX85-5 Excavator Hitachi 7:00 Y 3:30 Furness, Matthew Scott Lbr 7:00 Y 3:30 Tracey, Paul Lbr 7:00 N 9:00 Price-Baker, Isaiah LbrAp 7:00 Y 3:30 Maestas, Albert Lbr START TIME LN FINISH TIME QTY QTY or HRS Cost Code Hrs Incidents: Meetings: Orders / Direction Given: We started with traffic control setup (Kurt, Paul, Isaiah and Albert) and continued with excavation of pipe joints. Each section of pipe measured out at 20lf. Todd excavated, Scott spotted, Brett drove the 10 wheeler, Albert and Isaiah flagged, Kurt and Paul installed joint restraints. Mark @ SLO city inspected the restraints and gave the ok for backfill. We backfilled the trench to 6" below top of AC. We plated and coned off the west side of Murray. We did find an MJ sleeve (not on the plans) within 3lf of a tee fo the fire hydrant, Mark looked into a way to restrain the sleeve and tee. We plated the west side of Murray and installed cold mix around the plates. We then moved to the east side to begin excavation of joints. We found the first joint at 2:45. We plated and cold mixed the plates. Todd and Paul pulled a plate on Meineke and measured th O.D. of the existing 6" CI pipe for materials to tie the line together. RECORD #KEYED BY: TOTAL HOURS 8.0 8.0 8.0 7.0 E299 306 8.0 E345 1.0 E350 E367 8.0 7.0 1.0 8.0 8.0 8.0 8.0 8.0 8.0 7.0 1.0 4.0 8.0 4.0 7 2 0 1 . 2 0 0 8.0 8.0 8.0 DO NOT WRITE IN SHADED AREAS 8.0 8.0 Cost Code / Quantity Performed 8.0 7 2 1 8 . 1 0 0 8.0 E371 1.0 305 8.0 PAGE: OF: Cost Code Craft Hrs Cost Code Materials Used Work Performed 2.0 Superintendent: 7 2 0 1 . 1 0 0 QC-SSHO: 1.0 YES QTY Subcontractors Trucking / Other (Include Ticket #'s) 8" PVC/CI pipe restraints7218.100 Accident Lost Time or Other By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment. SIGNATURE: NO Visitors On Site ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION Isaiah had to leave, his son was sick. Albert had an appointment (physical therapy) and had to leave at 2:30 10/31/2019 Temp:43°/ 73° Shift:7:00am - 3:30pm SLO Water EMPLOYEE or EQUIP NO Cost Code Rental Equipment, Vendor Rented From & Ticket # 298 1.07.0 190072 Describe Incident Clear DAILY LUNCH BREAK 12:00 - 12:30 E351 Steve, Derek, Ryan and Sean met with Mark to discuss the sleeve and the upcoming weeks of the project. Install split megalugs with ductile iron lugs and all thread to restrain the joints. E339 47 E346 282 36