HomeMy WebLinkAbout11-13-19 190072S. CHAVES CONSTRUCTION, INC. (LONG FORM) CREW TIMECARD
DATE:
JOB NO:
Job Name:
Weather:
Qty Qty Qty Qty Qty Qty Qty Qty Qty
START
TIME
LN
Y
N FINISH TIME
************Do Not Write In This Column**********
NAME / EQUIPMENT
CRAFT
or
MAKE
7:00 Y 3:30 McHenry, Sean OEF
GMC Sierra C2500 GMC
7:00 Y 3:30 Roberts, Kurt Lbr
GMC Sierra 2500 - 4 Door GMC
7:00 Y 3:30 Juel, Todd OE
2019 Ram 5500 Utility RAM
JD 410G Backhoe Deere
7:00 Y 3:30 Furness, Matthew Scott Lbr
7:00 Y 3:30 Tracey, Paul Lbr
F750 Ford Water Truck Ford
7:00 Y 3:30 Gonzalez, Seve Lbr
2012 Peterbilt Dump Truck Peterbilt
7:00 Y 3:30 Maestas, Albert Lbr
7:00 Y 3:30 Price-Baker, Isaiah LbrAp
7:00 Y 3:30 Warren, Gary OE
Ram 5500 RAM
CAT 3-5 Ton DD Roller CAT
JD 210LEP Skip Loader Deere
7:00 Y 3:30 Prisiliano Valle-Reyes Lbr
START
TIME LN FINISH TIME QTY
11/13/2019 DO NOT WRITE IN SHADED AREAS
190072 Superintendent:
SLO Water QC-SSHO:
Foggy Cost Code / Quantity Performed
Temp:41°/ 70°
7
2
0
1
.
1
0
0
7
2
0
1
.
2
0
0
7
2
1
9
.
1
0
0
TOTAL
HOURS
Shift:7:00AM - 3:30PM
DAILY LUNCH BREAK 12:00 - 12:30
EMPLOYEE
or EQUIP
NO
7
2
1
5
.
1
0
0
E339 5.0 3.0 8.0
47 5.0 3.0 8.0
E299 1.0 1.0 6.0 8.0
36 1.0 1.0 6.0 8.0
E351 2.0 6.0 8.0
307 2.0 6.0 8.0
13 2.0 6.0 8.0
E350 8.0 8.0
E367 1.0 7.0 8.0
271 3.0 3.0
E349 8.0 8.0
305 4.0 4.0
E345 1.0 7.0 8.0
E371 1.0 7.0 8.0
E296 8.0 8.0
292 8.0 8.0
105 1.0 1.0
282 3.0 3.0
E373 8.0 8.0
Subcontractors Craft Hrs Cost Code Work Performed
QTY or
HRS Cost Code
1
23.08
Hrs
Tons Type A 1/2" max medium AC
Cost Code Trucking / Other (Include Ticket #'s)QTY Materials Used
7219.100 Cole Farms #324364 7219.100 23.08
7219.100 Hanson #1636009941
Cost Code Rental Equipment, Vendor Rented From & Ticket #
Accident Lost Time or
Other Describe Incident
NO
Visitors On Site
YES
Incidents:
ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION
Meetings:
PAGE: OF: KEYED BY:RECORD #
Orders / Direction Given:
By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment.
SIGNATURE: