Loading...
HomeMy WebLinkAbout11-13-19 190072S. CHAVES CONSTRUCTION, INC. (LONG FORM) CREW TIMECARD DATE: JOB NO: Job Name: Weather: Qty Qty Qty Qty Qty Qty Qty Qty Qty START TIME LN Y N FINISH TIME ************Do Not Write In This Column********** NAME / EQUIPMENT CRAFT or MAKE 7:00 Y 3:30 McHenry, Sean OEF GMC Sierra C2500 GMC 7:00 Y 3:30 Roberts, Kurt Lbr GMC Sierra 2500 - 4 Door GMC 7:00 Y 3:30 Juel, Todd OE 2019 Ram 5500 Utility RAM JD 410G Backhoe Deere 7:00 Y 3:30 Furness, Matthew Scott Lbr 7:00 Y 3:30 Tracey, Paul Lbr F750 Ford Water Truck Ford 7:00 Y 3:30 Gonzalez, Seve Lbr 2012 Peterbilt Dump Truck Peterbilt 7:00 Y 3:30 Maestas, Albert Lbr 7:00 Y 3:30 Price-Baker, Isaiah LbrAp 7:00 Y 3:30 Warren, Gary OE Ram 5500 RAM CAT 3-5 Ton DD Roller CAT JD 210LEP Skip Loader Deere 7:00 Y 3:30 Prisiliano Valle-Reyes Lbr START TIME LN FINISH TIME QTY 11/13/2019 DO NOT WRITE IN SHADED AREAS 190072 Superintendent: SLO Water QC-SSHO: Foggy Cost Code / Quantity Performed Temp:41°/ 70° 7 2 0 1 . 1 0 0 7 2 0 1 . 2 0 0 7 2 1 9 . 1 0 0 TOTAL HOURS Shift:7:00AM - 3:30PM DAILY LUNCH BREAK 12:00 - 12:30 EMPLOYEE or EQUIP NO 7 2 1 5 . 1 0 0 E339 5.0 3.0 8.0 47 5.0 3.0 8.0 E299 1.0 1.0 6.0 8.0 36 1.0 1.0 6.0 8.0 E351 2.0 6.0 8.0 307 2.0 6.0 8.0 13 2.0 6.0 8.0 E350 8.0 8.0 E367 1.0 7.0 8.0 271 3.0 3.0 E349 8.0 8.0 305 4.0 4.0 E345 1.0 7.0 8.0 E371 1.0 7.0 8.0 E296 8.0 8.0 292 8.0 8.0 105 1.0 1.0 282 3.0 3.0 E373 8.0 8.0 Subcontractors Craft Hrs Cost Code Work Performed QTY or HRS Cost Code 1 23.08 Hrs Tons Type A 1/2" max medium AC Cost Code Trucking / Other (Include Ticket #'s)QTY Materials Used 7219.100 Cole Farms #324364 7219.100 23.08 7219.100 Hanson #1636009941 Cost Code Rental Equipment, Vendor Rented From & Ticket # Accident Lost Time or Other Describe Incident NO Visitors On Site YES Incidents: ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION Meetings: PAGE: OF: KEYED BY:RECORD # Orders / Direction Given: By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment. SIGNATURE: