Loading...
HomeMy WebLinkAbout11-18-19 190072S. CHAVES CONSTRUCTION, INC. (LONG FORM) CREW TIMECARD DATE: JOB NO: Job Name: Weather: Qty Qty Qty Qty Qty Qty Qty Qty Qty START TIME LN Y N FINISH TIME ************Do Not Write In This Column********** NAME / EQUIPMENT CRAFT or MAKE 7:00 Y 3:30 McHenry, Sean OEF GMC Sierra C2500 GMC 7:00 Y 3:30 Juel, Todd OE 2019 Ram 5500 Utility RAM JD 410G Backhoe Deere Hitachi ZX85-5 Excavator 7:00 Y 3:30 Furness, Matthew Scott Lbr 7:00 Y 3:30 Tracey, Paul Lbr bobtail truck Ford 7:00 Y 3:30 Gonzalez, Seve Lbr 2012 Peterbilt Dump Truck Peterbilt 7:00 Y 3:30 Maestas, Albert Lbr 7:00 Y 3:30 Prisiliano Valle-Reyes Lbr 7:00 Y 3:30 Rhodes, Ryan OEF 2018 Ram 2500 RAM Hitachi ZX85-5 Excavator Hitachi START TIME LN FINISH TIME QTY 2.03062.0 Subcontractors Craft Hrs Cost Code Work Performed 3.53063.5 8.0 8.0 298 4.5 3.5 E365 4.5 3.5 8.0 8.0 E373 3.0 5.0 E345 8.0 5.0 8.0 305 5.0 E349 8.0 4.0 8.0 311 4.0 E367 8.0 8.0 5.0 E350 4.5 3.5 13 5.0 8.0 8.0 307 8.0 E351 8.0 8.0 8.0 47 4.0 4.0 E339 4.0 4.0 DAILY LUNCH BREAK 12:00 - 12:30 EMPLOYEE or EQUIP NO TOTAL HOURS Shift:7:00am- 3:30pm Clear Cost Code / Quantity Performed Temp:52°/ 76° 7 2 0 1 . 2 0 0 7 2 1 5 . 1 0 0 7 2 0 5 . 1 0 0 9 4 . 0 0 8 11/18/2019 DO NOT WRITE IN SHADED AREAS 190072 Superintendent: SLO Water QC-SSHO: QTY or HRS Cost Code 1 1 Hrs By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment. SIGNATURE: PAGE: OF: KEYED BY:RECORD # Orders / Direction Given: Meetings: ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION Incidents: Visitors On Site YES NO Cost Code Rental Equipment, Vendor Rented From & Ticket # Accident Lost Time or Other Describe Incident 7205.100 Ferguson # 8150132/ # 8153517/ # CM817249 7215.100 Ferguson # 8148267 Cost Code Trucking / Other (Include Ticket #'s)QTY Materials Used