HomeMy WebLinkAbout11-25-19 190072S. CHAVES CONSTRUCTION, INC. (LONG FORM) CREW TIMECARD
DATE:
JOB NO:
Job Name:
Weather:
Qty Qty Qty Qty Qty Qty Qty Qty Qty
START
TIME
LN
Y
N FINISH TIME
************Do Not Write In This Column**********
NAME / EQUIPMENT
CRAFT
or
MAKE
7:00 Y 4:00 McHenry, Sean OEF
GMC Sierra C2500 GMC
CAT 289D Skid Steer Loader 2015 0
7:00 Y 4:00 Juel, Todd OE
2019 Ram 5500 Utility RAM
Hitachi ZX85-5 Excavator Hitachi
JD 410G Backhoe Deere
7:00 Y 4:00 Rhodes, Ryan OEF
JD 210LEP Skip Loader Deere
JD 410G Backhoe Deere
7:00 Y 4:00 Furness, Matthew Scott Lbr
7:00 Y 4:00 Tracey, Paul Lbr
7:00 Y 4:00 Prisiliano Valle-Reyes Lbr
7:00 Y 4:00 Jacinto Sanchez LbrAp
7:00 Y 2:30 Maestas, Albert Lbr
7:00 Y 4:00 Gonzalez, Seve Lbr
2012 Peterbilt Dump Truck Peterbilt
Ford Bobtail Ford
START
TIME LN FINISH TIME QTY
11/25/2019 DO NOT WRITE IN SHADED AREAS
190072 Superintendent:
SLO Water QC-SSHO:
Clear Cost Code / Quantity Performed
Temp:45°/ 65°
7
2
0
5
.
1
0
0
TOTAL
HOURS
Shift:7:00am - 3:30pm
DAILY LUNCH BREAK 12:00 - 12:30
EMPLOYEE
or EQUIP
NO
E339 8.5 8.5
47 8.5 8.5
232 2.0 2.0
E351 8.5 8.5
307 8.5 8.5
306 7.0 7.0
13 2.5 1.5
E365 8.5 8.5
282 5.0 5.0
13 2.0 2.0
E350 8.5 8.5
E367 8.5 8.5
E373 8.5 8.5
E374 8.5 8.5
E345 7.0 7.0
E349 8.5 8.5
305 4.0 4.0
311 2.0 2.0
Subcontractors Craft Hrs Cost Code Work Performed
QTY or
HRS Cost Code
Hrs
Cost Code Trucking / Other (Include Ticket #'s)QTY Materials Used
Cost Code Rental Equipment, Vendor Rented From & Ticket #
Accident Lost Time or
Other Describe Incident
Visitors On Site
YES
NO
ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION
PAGE: OF: KEYED BY:RECORD #
Orders / Direction Given:
By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment.
SIGNATURE:
Meetings:
Incidents: