Loading...
HomeMy WebLinkAbout12-10-19 190072S. CHAVES CONSTRUCTION, INC. (LONG FORM) CREW TIMECARD DATE: JOB NO: Job Name: Weather: Qty Qty Qty Qty Qty Qty Qty Qty Qty START TIME LUN Y N FINISH TIME ************Do Not Write In This Column********** NAME / EQUIPMENT CRAFT or MAKE 7:00 y 3:30 McHenry, Sean OEF 7:00 y 3:30 Furness, Matthew Scott Lbr 7:00 y 3:30 Gonzalez, Seve Lbr 7:00 y 3:30 Juel, Todd OE 7:00 y 3:30 Tracey, Paul Lbr 7:00 y 3:30 Sanchez, Jacinto LbrAp 7:00 y 3:30 Valle-Reyes, Prisiliano Lbr 7:00 y 3:30 Sinkovich, Brett OE 7:00 y 3:30 Maestas, Albert Lbr 7:00 y 3:30 Rhodes, Ryan OEF JD 2016 35G Mini-X Deere JD 410G Backhoe Deere 2016 GMC Sierra C2500 GMC 2019 Ram 5500 Utility RAM 2006 Ford F450 Truck Ford 2012 Peterbilt Dump Truck Peterbilt Hitachi ZX85-5 Excavator Hitachi 2015 289D Skid Steer Loader 0 JD 210LEP Skiploader 2017 Deere Bobtail Dump Truck Ford 2018 Ram 2500 RAM START TIME LN FINISH TIME QTY 12/10/2019 DO NOT WRITE IN SHADED AREAS 190072 Superintendent: Murray waterline QC-SSHO: look out side :) Cost Code / Quantity Performed Temp:not hot 7 2 0 1 . 2 0 0 7 2 0 4 . 1 0 0 7 2 2 2 . 1 0 0 7 2 2 1 . 1 0 0 1 . 3 0 0 TOTAL HOURS Shift:7:00-3:30 1.0001.000DAILY LUNCH BREAK 12:00 - 12:30 EMPLOYEE or EQUIP NO e339 4.0 4.0 8.0 e350 4.0 4.0 8.0 e349 6.0 1.0 1.0 8.0 e351 1.0 4.0 3.0 8.0 0.0 e367 4.0 4.0 8.0 e374 6.0 1.0 1.0 8.0 e373 4.0 4.0 8.0 e346 2.0 2.0 4.0 8.0 e345 8.0 8.0 e365 8.0 8.0 283 2.0 2.0 2.0 6.0 13 1.0 1.0 47 8.0 8.0 307 8.0 8.0 75 8.0 8.0 305 1.0 1.0 306 0.0 232 1.0 1.0 2.0 282 2.0 2.0 311 2.0 2.0 4.0 298 8.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Subcontractors Craft Hrs Cost Code Work Performed QTY or HRS Cost Code Hrs Cost Code Trucking / Other (Include Ticket #'s)QTY Materials Used 7247.100 50tons calportland fill sand/ don’t have tickets yet Cost Code Rental Equipment, Vendor Rented From & Ticket # Accident Lost Time or Other Describe Incident YES NO x Visitors On Site ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION Incidents: Meetings: PAGE: OF: KEYED BY:RECORD # Orders / Direction Given: By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment. SIGNATURE: