HomeMy WebLinkAbout2-7-2020 190072S. CHAVES CONSTRUCTION, INC.(LONG FORM)CREW TIMECARD
DATE:
JOB NO:
Job Name:
Weather:
Qty Qty Qty Qty Qty Qty Qty Qty Qty
START
TIME
LUN
Y
N FINISH TIME
************Do Not Write In This Column**********
NAME / EQUIPMENT
CRAFT
or
MAKE
7:00 y 3:30 McHenry, Sean OEF
7:00 y 3:30 Furness, Matthew Scott Lbr
7:00 y
7:00 y
7:00 y
7:00 y
7:00 y 3:30 Valle-Reyes, Prisiliano Lbr
7:00 y 3:30 Sinkovich, Brett OE
7:00 y
7:00 y
7:00 y
2006 Ford F450 Truck Ford
2012 Peterbilt Dump Truck Peterbilt
Hitachi ZX85-5 Excavator Hitachi
2015 289D Skid Steer Loader 0
JD 210LEP Skiploader 2017 Deere
Bobtail Dump Truck Ford
2018 Ram 2500 RAM
JD 2016 35G Mini-X Deere
JD 410G Backhoe Deere
2016 GMC Sierra C2500 GMC
2019 Ram 5500 Utility RAM
2018 Ram 5500 RAM
2015 GMC Sierra 2500 - 4 Door GMC
Air Compressor (180 cfm)Doosan
START
TIME LN FINISH TIME QTY Subcontractors Craft Hrs Cost Code Work Performed
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.03124.0
0.0
0.0
36
292
0.0
8.0
307
47 4.0 4.0
0.0
2.0
13
283 2.0
0.0
2.0
298
311 2.0
2.0
4.0
282 2.0
232 2.0 2.0
0.0
0.0
306
305
8.0
0.0
75 4.0 4.0
0.0
0.0
0.0
0.0
0.0
8.0e3464.0 4.0
8.0
0.0
e373 4.0 4.0
0.0
0.0
0.0
0.0
8.0
8.0
e350 4.0 4.0
e339 4.0 4.0
Shift:Day
sunny Cost Code / Quantity Performed
Temp:7
2
2
8
.
1
0
0
7
2
0
5
.
1
0
0
DAILY LUNCH BREAK 12:00 - 12:30
EMPLOYEE
or EQUIP
NO
2/7/2020 DO NOT WRITE IN SHADED AREAS
190072 Superintendent:
Murray waterline QC-SSHO:
TOTAL
HOURS
QTY or
HRS Cost Code
Hrs
PAGE: OF:KEYED BY:RECORD #
Orders / Direction Given:
By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment.
SIGNATURE:
Meetings:
Incidents:
ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION
Visitors On Site
YES
NO x
Cost Code Rental Equipment, Vendor Rented From & Ticket #
Accident Lost Time or
Other Describe Incident
Cost Code Trucking / Other (Include Ticket #'s)QTY Materials Used