HomeMy WebLinkAbout5-28-2020 190072S. CHAVES CONSTRUCTION, INC.(LONG FORM)CREW TIMECARD
DATE:
JOB NO:
Job Name:
Weather:
Qty Qty Qty Qty Qty Qty Qty Qty Qty
START
TIME
LUN
Y
N FINISH TIME
************Do Not Write In This Column**********
NAME / EQUIPMENT
CRAFT
or
MAKE
7:00 Y 3:30 Sinkovich, Brett OE
7:00 Y
7:00 Y 3:30 Furness, Matthew Scott Lbr
7:00 Y 3:30 Juel, Todd OE
7:00 Y
7:00 Y
7:00 Y
7:00 Y
7:00 Y 3:30 Tracey, Paul Lbr
7:00 Y
7:00 Y 3:30 Valle-Reyes, Prisiliano Lbr
7:00 Y
2006 Ford F450 Truck (B. Sinkovich)Ford
2016 GMC Sierra C2500 (S. McHenry)GMC
2019 Ram 5500 Utility (T. Juel)RAM
2015 GMC Sierra 2500 - 4 Door (K. Roberts)GMC
Hitachi ZX85-5 Excavator Hitachi
2012 Peterbilt Dump Truck Peterbilt
2018 Ram 5500 (G. Warren)RAM
JD 2016 35G Mini-X Deere
JD 210LEP Skiploader 2017 Deere
2005 F750 Ford Water Truck Ford
Bobtail Dump Truck Ford
JD 410G Backhoe Deere
2015 289D Skid Steer Loader 0
START
TIME LN FINISH TIME QTY
5/28/2020 DO NOT WRITE IN SHADED AREAS
190072 Superintendent:
Murray St. Waterline QC-SSHO:
TOTAL
HOURS
Shift:Day
Sunny Cost Code / Quantity Performed
Temp:80 7
2
0
6
.
1
0
0
7
2
4
4
.
1
0
0
9
4
.
0
2
1
DAILY LUNCH BREAK 12:00 - 12:30
EMPLOYEE
or EQUIP
NO
E346 6.0 2.0
0.0
8.0
E351 6.0 2.0
E350 6.0 2.0
8.0
8.0
0.0
0.0
0.0
0.0
E367 4.5 2.5 1.0
0.0
8.0
E373 6.0 2.0
0.0
8.0
0.0
0.0
47
75 6.0 2.0
0.0
8.0
36
307 8.0
0.0
8.0
305 3.0 2.0
306 2.0
5.0
2.0
283 1.0
292
1.0
0.0
271
282 1.0
0.0
1.0
13
311 2.0 2.0
0.0
4.0
232 1.0
0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Subcontractors Craft Hrs Cost Code Work Performed
0.0
QTY or
HRS Cost Code
Hrs
Cost Code Trucking / Other (Include Ticket #'s)QTY Materials Used
Cost Code Rental Equipment, Vendor Rented From & Ticket #
Accident Lost Time or
Other Describe Incident
Visitors On Site
YES
NO X
ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION
Meetings:
Incidents:
PAGE: OF:KEYED BY:RECORD #
Orders / Direction Given:
By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment.
SIGNATURE: