Loading...
HomeMy WebLinkAbout6-24-2020 190072S. CHAVES CONSTRUCTION, INC.(LONG FORM)CREW TIMECARD DATE: JOB NO: Job Name: Weather: Qty Qty Qty Qty Qty Qty Qty Qty Qty START TIME LUN Y N FINISH TIME ************Do Not Write In This Column********** NAME / EQUIPMENT CRAFT or MAKE 7:00 Y 5:00 Sinkovich, Brett OEF 7:00 Y 5:00 Juel, Todd OEF 7:00 Y 3:30 Furness, Matthew Scott Lbr4 7:00 Y 7:00 Y 7:00 Y 7:00 Y 5:00 Valle-Reyes, Prisiliano Lbr1 7:00 Y 3:30 Cardensa, Michael OEAp1 7:00 Y 5:00 Tracey, Paul Lbr4 7:00 Y 7:00 Y 7:00 Y 2006 Ford F450 Truck (B. Sinkovich)Ford 2016 GMC Sierra C2500 (S. McHenry)GMC 2019 Ram 5500 Utility (T. Juel)RAM 2015 GMC Sierra 2500 - 4 Door (K. Roberts)GMC Hitachi ZX85-5 Excavator Hitachi 2012 Peterbilt Dump Truck Peterbilt 2018 Ram 5500 (G. Warren)RAM JD 2016 35G Mini-X Deere JD 210LEP Skiploader 2017 Deere 2005 F750 Ford Water Truck Ford Bobtail Dump Truck Ford 2015 289D Skid Steer Loader 0 JD 410G Backhoe Deere CAT CB24 3-5 Ton DD Roller CAT START TIME LN FINISH TIME QTY 6/24/2020 DO NOT WRITE IN SHADED AREAS 190072 Superintendent: Murray St. Waterline QC-SSHO: TOTAL HOURS Shift:Day Sunny Cost Code / Quantity Performed Temp:7 2 2 1 . 1 0 0 DAILY LUNCH BREAK 12:00 - 12:30 EMPLOYEE or EQUIP NO E351 9.5 E346 9.5 9.5 9.5 E350 8.0 0.0 8.0 0.0 0.0 E372 8.0 E373 9.5 8.0 9.5 E367 9.5 0.0 9.5 0.0 0.0 0.0 0.0 47 75 9.5 0.0 9.5 36 307 9.5 0.0 9.5 305 1.0 306 1.0 0.0 283 6.0 292 6.0 0.0 271 282 0.0 0.0 232 2.0 311 3.0 2.0 3.0 105 13 2.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Subcontractors Craft Hrs Cost Code Work Performed 0.0 QTY or HRS Cost Code ### Hrs Cost Code Trucking / Other (Include Ticket #'s)QTY Materials Used Cost Code Rental Equipment, Vendor Rented From & Ticket # Accident Lost Time or Other Describe Incident Visitors On Site YES NO X ADDITIONAL COMMENTS - INSPECTIONS - CONCERNS - OWNER COMMENTS OR DIRECTION Meetings: Incidents: PAGE: OF:KEYED BY:RECORD # Orders / Direction Given: By Signing below, Owner agrees that work designated as Extra Work is accurate, to the extent of which billings can be submitted on a Time and Materials (T&M) basis for payment. SIGNATURE: