HomeMy WebLinkAboutItem 10 - Partial acceptance of Public improvements for Tracts 3063-2, 3066-2, 3095, and 3111, in the Orcutt Area Specific Plan
Department Name: Community Development
Cost Center: 4003
For Agenda of: November 17, 2020
Placement: Consent
Estimated Time: N/A
FROM: Michael Codron, Director of Community Development
Prepared By: Dan Van Beveren, Senior Civil Engineer
SUBJECT: PARTIAL ACCEPTANCE OF PUBLIC IMPROVEMENTS FOR TRACTS
3063-2, 3066-2, 3095, AND 3111, RESIDENTIAL SUBDIVISIONS IN THE
ORCUTT AREA
RECOMMENDATION
Adopt resolutions for Tract 3063-2 (Attachment A), Tract 3066-2 (Attachment B), Tract 3095
(Attachment C), and Tract 3111 (Attachment D) accepting the completed public improvements,
certifying the completed private subdivision improvements, releasing the securities for the
completed portions, and authorizing the Director of Public Works to accept the remaining
improvements and to release the remaining securities once the improvements are deemed
complete.
DISCUSSION
Background
The Orcutt Area Specific Plan area (Attachment E) contains several subdivisions which are now
complete or nearing completion. Those subdivisions are summarized as follows:
Tract 3063-2 (Phase 2 of the Righetti Ranch Subdivision) consists of the creation of 124 lots
consisting of:
1. 87 single family lots
2. 32 multi-family residential lots
3. Three small public park lots
4. One private drainage basin lot
5. One private street lot
Tract 3066-2 (Phase 2 of the subdivision commonly known as the Jones Subdivision) consists of
the creation of 33 lots consisting of:
1. Three mixed-use lots
2. Seven lots for up to 43 condominium units
3. Five common area lots for parking, private streets, and private drive aisles
4. Two common area lots for private open space and drainage
5. Two HOA-owned lots for preservation of creek/biological open space
6. Nine lots for single family homes for subdivider
7. Five lots for the Jones homestead site
Packet Page 122
Item 10
Tract 3095 (Imel Ranch Subdivision) consists of the creation of 23 lots consisting of:
1. 18 single-family lots
2. Two private drainage basin lots
3. Two private open space lots, and
4. One public open space lot.
Tract 3111 (Pratt Subdivision) consists of the creation of 31 lots consisting of:
1. 30 single-family lots, and
2. One homeowners’ association common area lot.
Partial Acceptance of a Portion of Improvements
For each of these subdivisions, work has been completed for most of the required public
improvements. These improvements include new public streets including Imel Road, Phyliss
Way, Hayfield Loop, Kilbern Way and portions or extensions of Ranch House Road, Sponza
Drive, Tiburon Way, and Bullock Lane. New roundabouts have been installed at the intersections
of Tiburon Way and Ranch House Road, and at Tiburon Way and Righetti Ranch Road. A map
showing the locations of these new public street improvements is included as Attachment F.
In general, the improvements consist of street construction, street widening, medians, curb,
gutter, sidewalks, Class 1 multi-use paths, streetlights, water main and sewer main extensions,
fire hydrants, reclaimed water main, storm drain improvements, and landscaping. Each of the
draft resolutions includes a partial acceptance of these improvements, accepts the completion of
a portion of the required improvements, reduces the securities for the work that is completed, and
authorizes the Public Works Director to accept the remaining public improvements once they are
deemed complete and to release the remaining securities on behalf of the City Council once the
work is completed.
Previous Council Action
The tentative subdivision map for Tract 3063 (Righetti Ranch) was approved by City Council on
May 19, 2015, by Resolution No. 10619 (2015 Series).
The final map for Tract 3063-2 (Phase 2 of Righetti Ranch) was approved by City Council on
October 1, 2019, by Resolution No. 11047 (2019 Series).
The tentative subdivision map for Tract 3066 (Jones Subdivision) was approved by City Council
on May 19, 2015 by Resolution No. 10620 (2015 Series).
The final map for Tract 3066-2 (Phase 2 of the Jones Subdivision) was approved by City Council
on March 21, 2017 by Resolution No. 10779 (2017 Series).
The tentative subdivision map for Tract 3095 (Imel Ranch) was approved by City Council on
March 20, 2017 by Resolution No. 10773 (2018 Series).
The final map for Tract 3095 (Imel Ranch) was approved by City Council on February 5, 2019
by Resolution No. 10977 (2019 Series).
Packet Page 123
Item 10
The tentative subdivision map for Tract 3111 (Pratt Subdivision) was approved by City Council
on May 1, 2018 by Resolution No. 10884 (2018 Series).
The final map for Tract 3111 (Pratt Subdivision) was approved by City Council on April 2, 2019
by Resolution No. 10995 (2019 Series).
Policy Context
The City Council accepts public improvements and certifies completion of private improvements
in accordance with the Subdivision Map Act and the City’s Subdivision Regulations.
Public Engagement
Public Engagement was completed with the approval of the Tentative Map and the development
of the Orcutt Area Specific Plan.
CONCURRENCE
The Public Works Director and the Utilities Director concur with the recommended action.
ENVIRONMENTAL REVIEW
There is no environmental review associated with the acceptance of these improvements. Prior
Environmental review consisted of the review of the Orcutt Area Specific Plan and its Final
Environmental Impact Report (FEIR) in March 2010. Subsequent environmental review included
each of the Vesting Tentative Tract Maps, which tiered off the 2010 FEIR, and were analyzed in
project-specific Initial Study/Mitigated Negative Declarations.
FISCAL IMPACT
Budgeted: No Budget Year: N/A
Funding Identified: No
Fiscal Analysis:
Funding
Sources
Total Budget
Available
Current Funding
Request
Remaining
Balance
Annual
Ongoing Cost
General Fund N/A
State
Federal
Fees
Other:
Total
Packet Page 124
Item 10
Typical maintenance and operation of newly accepted public facilities will be required for the
street and utility improvements. Increasing the maintenance budget for the small, incremental
increase in infrastructure to be maintained does not occur with each acceptance of public
facilities. The maintenance budget for the improvements is evaluated and adjusted as needed
with the City’s adoption of its two-year financial plan. Council action accepting these
improvements, however, itself does not have an associated budget increase.
ALTERNATIVES
Limited alternatives exist only regarding the timing of the acceptance of these improvements.
Ultimately, acceptance of the public improvements is required in accordance with the OASP,
Tentative Mapp approvals, Department of Real Estate process assumptions, and Homeowners
Association CC&R’s.
Attachments:
a - Draft Resolution - Righetti Phase 2 Acceptance, Tract 3063-2
b - Draft Resolution - Jones Phase 2 Acceptance, Tract 3066-2
c - Draft Resolution - Imel Acceptance, Tract 3095
d - Draft Resolution - Pratt Acceptance, Tract 3111
e - Vicinity Map
f - Site Map
Packet Page 125
Item 10
R _____
RESOLUTION NO. ________ (2020 SERIES)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SAN LUIS OBISPO, CALIFORNIA, ACCEPTING THE COMPLETED
PUBLIC IMPROVEMENTS OF TRACT 3063-2; CERTIFYING THE
COMPLETED PRIVATE SUBDIVISION IMPROVEMENTS OF TRACT
3063-2; RELEASING THE SECURITIES FOR THE COMPLETED
PORTIONS OF TRACT 3063-2; AND AUTHORIZING THE DIRECTOR
OF PUBLIC WORKS TO ACCEPT THE REMAINING IMPROVEMENTS
AND TO RELEASE THE REMAINING SECURITIES ONCE ALL THE
IMPROVEMENTS ARE DEEMED COMPLETE
WHEREAS, the City Council made certain findings concerning Tract 3063, as prescribed in
Resolution No. 10619 (2015 Series); and
WHEREAS, the City Council approved the final map for Tract 3063-2 per Resolution No.
11047 (2019 Series); and
WHEREAS, the subdivider has satisfactorily completed the majority of the required
public improvements in accordance with City standards, specifications, and the subdivision
agreement; and has requested that the City accept of these public improvements for maintenance
and operation by the City; and
WHEREAS, the subdivider has satisfactorily completed a portion of the private
improvements in accordance with City standards, specifications and the approved plans, and has
requested that the City certify completion of these private improvements; and
WHEREAS, the subdivider has on file the appropriate securities to guarantee the completion
of the remaining Phase 2 subdivision improvements as shown on the approved plans.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo
as follows:
SECTION 1. The City Council hereby accepts a portion of the public improvements for Tract
3063-2, specifically the public improvements for Kilbern Way and Hayfield Loop with the exception
of improvements at and in the vicinity of the intersection of Hayfield Loop and Tiburon Way.
SECTION 2. The City Council hereby certifies completion of a portion of the required
private subdivision improvements within the Tract 3063-2 boundary.
SECTION 3. The Faithful Performance securities guaranteeing completion of the on-site
and off-site public improvements may be reduced with the approval of the Director of Public
Works upon submittal of the following items:
1. Progress record drawings for the completed improvements; and
2. Certification by the Engineer of Record for the completion of the public
improvements.
Packet Page 126
Item 10
Resolution No. _______ (2020 Series) Page 2
R _____
SECTION 4. The corresponding Labor & Materials security may be released after 90 days
from the date of acceptance of the improvements in accordance with Section 66499.7(h) of the
California Government Code.
SECTION 5. The Director of Public Works is hereby authorized to accept the remaining
improvements and to release the remaining securities on behalf of the City Council once the work
is completed to the City’s satisfaction.
SECTION 6. The security guaranteeing the workmanship and materials may be released
by the Director of Public Works upon the successful completion of the 12-month warranty time
period from the date of acceptance of the improvements.
Upon motion of Council Member ________________, seconded by Council Member
_________________, and on the following roll call vote:
AYES:
NOES:
ABSENT:
The foregoing resolution was adopted this ______ day of _______________ 2020.
____________________________________
Mayor Heidi Harmon
ATTEST:
____________________________________
Teresa Purrington
City Clerk
APPROVED AS TO FORM:
_____________________________________
J. Christine Dietrick
City Attorney
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City
of San Luis Obispo, California, on __________________.
____________________________________
Teresa Purrington
City Clerk
Packet Page 127
Item 10
R _____
RESOLUTION NO. ________ (2020 SERIES)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SAN LUIS OBISPO, CALIFORNIA, ACCEPTING THE COMPLETED
PUBLIC IMPROVEMENTS OF TRACT 3066-2; CERTIFYING THE
COMPLETED PRIVATE SUBDIVISION IMPROVEMENTS OF TRACT
3066-2; RELEASING THE SECURITIES FOR THE COMPLETED
PORTIONS OF TRACT 3066-2; AND AUTHORIZING THE DIRECTOR
OF PUBLIC WORKS TO ACCEPT THE REMAINING IMPROVEMENTS
AND TO RELEASE THE REMAINING SECURITIES ONCE ALL THE
IMPROVEMENTS ARE DEEMED COMPLETE
WHEREAS, the City Council made certain findings concerning Tract 3066, as prescribed in
Resolution No. 10620 (2015 Series); and
WHEREAS, the City Council approved the final map for Tract 3066-2 per Resolution No.
10779 (2017 Series); and
WHEREAS, the subdivider has satisfactorily completed the majority of the required
public improvements in accordance with City standards, specifications, and the subdivision
agreement; and has requested that the City accept of these public improvements for maintenance
and operation by the City; and
WHEREAS, the subdivider has satisfactorily completed the majority of the private
improvements in accordance with City standards, specifications and the approved plans, and has
requested that the City certify completion of these private improvements; and
WHEREAS, the subdivider has on file the appropriate securities to guarantee the completion
of the remaining subdivision improvements as shown on the approved plans.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo
as follows:
SECTION 1. The City Council hereby accepts a portion of the public improvements for Tract
3066-2, specifically the public improvements fronting the tract boundary along Sponza Drive, Ranch
House Road, and Tiburon Way, and all utilities withing the Tract boundary.
SECTION 2. The City Council hereby certifies completion of the required private
subdivision improvements within the Tract 3066-2 boundary.
SECTION 3. The Faithful Performance securities guaranteeing completion of the on-site
and off-site public improvements may be reduced with the approval of the Director of Public
Works upon submittal of the following items:
1. Progress record drawings for the completed improvements; and
2. Certification by the Engineer of Record for the completion of the public
improvements.
Packet Page 128
Item 10
Resolution No. _______ (2020 Series) Page 2
R _____
SECTION 4. The corresponding Labor & Materials security may be released after 90 days
from the date of acceptance of the improvements in accordance with Section 66499.7(h) of the
California Government Code.
SECTION 5. The Director of Public Works is hereby authorized to accept the remaining
improvements and to release the remaining securities on behalf of the City Council once the work
is completed to the City’s satisfaction.
SECTION 6. The security guaranteeing the workmanship and materials may be released
by the Director of Public Works upon the successful completion of the 12-month warranty time
period from the date of acceptance of the improvements.
Upon motion of Council Member ________________, seconded by Council Member
_________________, and on the following roll call vote:
AYES:
NOES:
ABSENT:
The foregoing resolution was adopted this ______ day of _______________ 2020.
____________________________________
Mayor Heidi Harmon
ATTEST:
____________________________________
Teresa Purrington
City Clerk
APPROVED AS TO FORM:
_____________________________________
J. Christine Dietrick
City Attorney
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City
of San Luis Obispo, California, on __________________.
____________________________________
Teresa Purrington
City Clerk
Packet Page 129
Item 10
R _____
RESOLUTION NO. ________ (2020 SERIES)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SAN LUIS OBISPO, CALIFORNIA, ACCEPTING THE COMPLETED
PUBLIC IMPROVEMENTS OF TRACT 3095; CERTIFYING THE
COMPLETED PRIVATE SUBDIVISION IMPROVEMENTS OF TRACT
3095; RELEASING THE SECURITIES FOR THE COMPLETED
PORTIONS OF TRACT 3095; AND AUTHORIZING THE DIRECTOR OF
PUBLIC WORKS TO ACCEPT THE REMAINING IMPROVEMENTS
AND TO RELEASE THE REMAINING SECURITIES ONCE ALL THE
IMPROVEMENTS ARE DEEMED COMPLETE
WHEREAS, the City Council made certain findings concerning Tract 3095, as prescribed in
Resolution No. 10773 (2017 Series); and
WHEREAS, the City Council approved the final map for Tract 3095 per Resolution No.
10977 (2019 Series); and
WHEREAS, the subdivider has satisfactorily completed the majority of the required
public improvements in accordance with City standards, specifications, and the subdivision
agreement; and has requested that the City accept of these public improvements for maintenance
and operation by the City; and
WHEREAS, the subdivider has satisfactorily completed the majority of the private
improvements in accordance with City standards, specifications and the approved plans, and has
requested that the City certify completion of these private improvements; and
WHEREAS, the subdivider has on file the appropriate securities to guarantee the completion
of the remaining subdivision improvements as shown on the approved plans.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo
as follows:
SECTION 1. The City Council hereby accepts the public improvements, including utility
installation, for Tract 3095 except for the final street paving which is currently under staff review, and
the installation of one streetlight which has not yet been energized.
SECTION 2. The City Council hereby certifies completion of the required private
subdivision improvements within the Tract 3095 boundary.
SECTION 3. The Faithful Performance securities guaranteeing completion of the on-site
and off-site public improvements may be reduced with the approval of the Director of Public
Works upon submittal of the following items:
1. Progress record drawings for the completed improvements; and
2. Certification by the Engineer of Record for the completion of the public
improvements.
Packet Page 130
Item 10
Resolution No. _______ (2020 Series) Page 2
R _____
SECTION 4. The corresponding Labor & Materials security may be released after 90 days
from the date of acceptance of the improvements in accordance with Section 66499.7(h) of the
California Government Code.
SECTION 5. The Director of Public Works is hereby authorized to accept the remaining
improvements and to release the remaining securities on behalf of the City Council once the work
is completed to the City’s satisfaction.
SECTION 6. The security guaranteeing the workmanship and materials may be released
by the Director of Public Works upon the successful completion of the 12-month warranty time
period from the date of acceptance of the improvements.
Upon motion of Council Member ________________, seconded by Council Member
_________________, and on the following roll call vote:
AYES:
NOES:
ABSENT:
The foregoing resolution was adopted this ______ day of _______________ 2020.
____________________________________
Mayor Heidi Harmon
ATTEST:
____________________________________
Teresa Purrington
City Clerk
APPROVED AS TO FORM:
_____________________________________
J. Christine Dietrick
City Attorney
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City
of San Luis Obispo, California, on __________________.
____________________________________
Teresa Purrington
City Clerk
Packet Page 131
Item 10
R _____
RESOLUTION NO. ________ (2020 SERIES)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SAN LUIS OBISPO, CALIFORNIA, ACCEPTING THE COMPLETED
PUBLIC IMPROVEMENTS OF TRACT 3111; RELEASING THE
SECURITIES FOR THE COMPLETED PORTIONS OF TRACT 3111; AND
AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO ACCEPT
THE REMAINING IMPROVEMENTS AND TO RELEASE THE
REMAINING SECURITIES ONCE ALL THE IMPROVEMENTS ARE
DEEMED COMPLETE
WHEREAS, the City Council made certain findings concerning Tract 3111, as prescribed in
Resolution No. 10884 (2018 Series); and
WHEREAS, the City Council approved the final map for Tract 3111 per Resolution No.
10995 (2019 Series); and
WHEREAS, the subdivider has satisfactorily completed the required public improvements
in accordance with City standards, specifications, and the subdivision agreement; and has
requested that the City accept of these public improvements for maintenance and operation by the
City; and
WHEREAS, the subdivider has on file the appropriate securities to guarantee the completion
of the remaining subdivision improvements as shown on the approved plans.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo
as follows:
SECTION 1. The City Council hereby accepts the public improvements, including utility
installation, for Tract 3111.
SECTION 2. The Faithful Performance securities guaranteeing completion of the on-site
and off-site public improvements may be reduced with the approval of the Director of Public
Works upon submittal of the following items:
1. Progress record drawings for the completed improvements; and
2. Certification by the Engineer of Record for the completion of the public
improvements.
SECTION 3. The corresponding Labor & Materials security may be released after 90 days
from the date of acceptance of the improvements in accordance with Section 66499.7(h) of the
California Government Code.
SECTION 4. The Director of Public Works is hereby authorized to accept the remaining
improvements and to release the remaining securities on behalf of the City Council once the work
is completed to the City’s satisfaction.
Packet Page 132
Item 10
Resolution No. _______ (2020 Series) Page 2
R _____
SECTION 5. The security guaranteeing the workmanship and materials may be released
by the Director of Public Works upon the successful completion of the 12-month warranty time
period from the date of acceptance of the improvements.
Upon motion of Council Member ________________, seconded by Council Member
_________________, and on the following roll call vote:
AYES:
NOES:
ABSENT:
The foregoing resolution was adopted this ______ day of _______________ 2020.
____________________________________
Mayor Heidi Harmon
ATTEST:
____________________________________
Teresa Purrington
City Clerk
APPROVED AS TO FORM:
_____________________________________
J. Christine Dietrick
City Attorney
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City
of San Luis Obispo, California, on __________________.
____________________________________
Teresa Purrington
City Clerk
Packet Page 133
Item 10
Packet Page 134
Item 10
Packet Page 135
Item 10
Page intentionally left
blank.
Packet Page 136
Item 10