HomeMy WebLinkAbout2020-05-04Filippin Engineering
354-D S. Fairview Ave.
Goleta, California 93117
P: (805) 845-4602
Project: 194501 - SLO Marsh Street Bridge
Replacement
919 Palm St.
San Luis Obispo, California 93401
P: 8057817200
Daily Log Inspection: Monday 5/4/2020
NOTES LOG
No.Comments
1 Meet with Stewart Souza (Souza Construction) 7 AM. Today's tasks were going to be for Lee Wilson (Arrived on site at 8 AM)
to trench across Marsh on the NW corner of Marsh and Osos St. for the temporary traffic signal. Excavation was 12'' deep at
that depth there were 2 2'' conduits running west to east on Marsh at the gutter lip. The temp. signal conduit was able to run
over the top of the existing two conduits to sweep into the box in the sidewalk. Lee Wilson installed pull box and pole in the
center lane of Marsh west of the intersection. Backfill was preformed with 1.5 sack slurry from CalPortland (Ticket # 1537821)
2 Live Oak was on site moving Digital West line off the bridge.
3 Kick off meeting at 1 PM. In attendance FE staff Matt D., Raul E., and Jerry M. City Staff Lyle N. (In person) Mike McGuire &
Manny Guzman (by phone Skype) Earthsystems Rob Downs (call in) Padre Associates Alyssa Berry (call in). Souza
Construction in person Steve Souza, Stewart Souza, Will Stoudenmire, Garret Vanfleet.
Discussion was about project schedule for up coming two weeks. Access to Zanoli project and concerns Souza Construction
has about delays. Environmental training was scheduled for Monday 5/11 at 7AM. 5/5 in the PM layout for ESA fence was
going to be approved by Padre.
Souza expressed again how much the project would benefit from open trench for sewer siphon.
MANPOWER LOG 10 Workers | 64.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
1 Souza Stewart Souza-Superintendent
Temp traffics set up/ sand barrel array
1 8.0 8.0
2 Souza Will Stoudenmire- PM
Job start up
1 8.0 8.0
3 Souza Garrett Vanfleet-Carpenter Foreman
Kick off meeting/ Sand Barrel Array
1 4.0 4.0
4 Lee Wilson Electric Eric -operator Foreman
BI 5
1 4.0 4.0
5 Lee Wilson Electric Jimmy Pettie-Laborer
BI 5
1 4.0 4.0
6 Lee Wilson Electric Joseph Lasdemese-laborer
BI 5
1 8.0 8.0
7 Lee Wilson Electric Javier Quinter- Operator
BI 5
1 4.0 4.0
Filippin Engineering Page 1 of 7 Printed on 5/29/2020 at 12:25 PM PDT
MANPOWER LOG 10 Workers | 64.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
8 Lee Wilson Electric Jose Jaurez-Laborer
BI 5
1 8.0 8.0
9 Lee Wilson Electric Jason Heller-Electrician
BI 5
1 8.0 8.0
10 Lee Wilson Electric Bryon McClean-Electrician
BI 5
1 8.0 8.0
10 64.0
OBSERVED WEATHER CONDITIONS
Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity
No
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
50°F 79°F 64°F 0.00 in.0.00 in.0.00 in.26%46%77%42°F 7.7 mph 10 mph 18 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
clear-night
52°F
clear-day
64°F
clear-day
76°F
clear-day
79°F
clear-day
75°F
clear-night
64°F
PHOTOS
BBD3A9DE-3AB4-4E35-BD23-C9C81800B8DD.jpeg 8F53E018-2CB4-44A7-AC7F-F971200764FB.jpeg
Filippin Engineering Page 2 of 7 Printed on 5/29/2020 at 12:25 PM PDT
D0A2634F-4D8E-4F15-9A9A-BB1B6D19667D.jpeg
6AD7F078-CD27-46C7-B8C1-9FEBE4334898.jpeg
D6EDA70C-E868-4FD3-AC7A-3E7DF1AB8DAE.jpeg
C93BF88E-1686-4243-8831-93CA32F6C9CA.jpeg
45629725-29C0-418B-B42B-EC0D67B30FE7.jpeg
33E70A62-5569-4B1F-A3F0-D840B3975AAB.jpeg
F68E11D3-E41C-4A80-803C-4266FBC6AC37.jpeg
F631F285-8925-4611-8977-9DFB5A194A92.jpeg
Filippin Engineering Page 3 of 7 Printed on 5/29/2020 at 12:25 PM PDT
160E01C9-EBBC-4633-9528-A84BFC16639D.jpeg
0C3EC3CC-9E95-43F7-B343-48C19B654628.jpeg
6382F7AE-1D8B-4821-9B24-E8384397E123.jpeg
98620B38-B79E-443A-AD5B-B3CFE86902F7.jpeg
DE87CB3E-B0F2-4C9E-8B05-A29BD027427D.jpeg
A0FED4ED-D492-4BDD-8C35-2F48EC6A7B23.jpeg
3AEB6588-4D74-4B9F-8FC9-04D4EC893973.jpeg
D66FDC21-D672-4CA9-A321-4B040742BE01.jpeg
Filippin Engineering Page 4 of 7 Printed on 5/29/2020 at 12:25 PM PDT
DBCBBA3F-7C9E-4348-A22D-A7E265BD1164.jpeg
4B3431AC-2BDD-42F8-A393-7A05CC8CCFEA.jpeg
8C23041B-46A2-4AA7-A173-4DF46D32AD5B.jpeg
830B4B17-3E0A-4370-A62D-7ADF7A9D3971.jpeg
66599CE5-801B-4FF7-AFF8-0150A2732E87.jpeg
BD253897-4FCF-471C-A08A-EF896504710F.jpeg
467F37F0-ACC2-443E-89C2-351A7E101554.jpeg
0F38CE6F-6ABE-467B-8FD1-5D2A24E6C4E8.jpeg
Filippin Engineering Page 5 of 7 Printed on 5/29/2020 at 12:25 PM PDT
7372235C-EFF1-4FA4-AFF8-1E59BDBFB2CD.jpeg
4FA2EAC1-665D-4F01-9020-217FB8A00DBD.jpeg
3BD5FA87-277A-40C6-97EA-15F06E980D16.jpeg
698302A3-7C44-4E59-9B0B-9E179E453B8B.jpeg
32BF6DB1-3D9D-4C84-9193-9D2086D7981A.jpeg
B656DE79-FBDA-4AB9-BA6D-672775A0B028.jpeg
04D734E3-C10A-4AF8-8761-C5F26DA6BEA1.jpeg
A58E2165-962F-4B4C-850D-E543D891E4B8.jpeg
Filippin Engineering Page 6 of 7 Printed on 5/29/2020 at 12:25 PM PDT
2C80CD32-9C44-453C-BB85-46170FBF9357.jpeg
AEF9837E-D9DF-4CFB-BC07-AD9888242C39.jpeg
C1C89C0D-A5DE-49FB-9710-FE0BD82C432F.jpeg
6C34B678-0A1C-45EE-82FC-6FC944D6E8A2.jpeg
3F335820-CE69-4703-98BB-4781EB93AB1D.jpeg
39DF7416-1795-4953-B689-FC9933EDAEEF.jpeg
3E3B7477-A2CA-4905-AE6F-67A9D549C1A0.jpeg
By Date Copies To
Filippin Engineering Page 7 of 7 Printed on 5/29/2020 at 12:25 PM PDT
Jerry Missamore 5/4/2020