Loading...
HomeMy WebLinkAbout2020-05-04Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Monday 5/4/2020      NOTES LOG   No.Comments   1 Meet with Stewart Souza (Souza Construction) 7 AM. Today's tasks were going to be for Lee Wilson (Arrived on site at 8 AM) to trench across Marsh on the NW corner of Marsh and Osos St. for the temporary traffic signal. Excavation was 12'' deep at that depth there were 2 2'' conduits running west to east on Marsh at the gutter lip. The temp. signal conduit was able to run over the top of the existing two conduits to sweep into the box in the sidewalk. Lee Wilson installed pull box and pole in the center lane of Marsh west of the intersection. Backfill was preformed with 1.5 sack slurry from CalPortland (Ticket # 1537821)   2 Live Oak was on site moving Digital West line off the bridge.  3 Kick off meeting at 1 PM. In attendance FE staff Matt D., Raul E., and Jerry M. City Staff Lyle N. (In person) Mike McGuire & Manny Guzman (by phone Skype) Earthsystems Rob Downs (call in) Padre Associates Alyssa Berry (call in). Souza Construction in person Steve Souza, Stewart Souza, Will Stoudenmire, Garret Vanfleet. Discussion was about project schedule for up coming two weeks. Access to Zanoli project and concerns Souza Construction has about delays. Environmental training was scheduled for Monday 5/11 at 7AM. 5/5 in the PM layout for ESA fence was going to be approved by Padre. Souza expressed again how much the project would benefit from open trench for sewer siphon.      MANPOWER LOG 10 Workers  |   64.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Stewart Souza-Superintendent Temp traffics set up/ sand barrel array   1 8.0 8.0       2 Souza Will Stoudenmire- PM Job start up   1 8.0 8.0       3 Souza Garrett Vanfleet-Carpenter Foreman Kick off meeting/ Sand Barrel Array   1 4.0 4.0       4 Lee Wilson Electric Eric -operator Foreman BI 5   1 4.0 4.0       5 Lee Wilson Electric Jimmy Pettie-Laborer BI 5   1 4.0 4.0       6 Lee Wilson Electric Joseph Lasdemese-laborer BI 5   1 8.0 8.0       7 Lee Wilson Electric Javier Quinter- Operator BI 5   1 4.0 4.0         Filippin Engineering Page 1 of 7 Printed on 5/29/2020 at 12:25 PM PDT       MANPOWER LOG 10 Workers  |   64.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   8 Lee Wilson Electric Jose Jaurez-Laborer BI 5   1 8.0 8.0       9 Lee Wilson Electric Jason Heller-Electrician BI 5   1 8.0 8.0       10 Lee Wilson Electric Bryon McClean-Electrician BI 5   1 8.0 8.0          10  64.0      OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 79°F 64°F 0.00 in.0.00 in.0.00 in.26%46%77%42°F 7.7 mph 10 mph 18 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   52°F clear-day   64°F clear-day   76°F clear-day   79°F clear-day   75°F clear-night   64°F   PHOTOS BBD3A9DE-3AB4-4E35-BD23-C9C81800B8DD.jpeg 8F53E018-2CB4-44A7-AC7F-F971200764FB.jpeg    Filippin Engineering Page 2 of 7 Printed on 5/29/2020 at 12:25 PM PDT    D0A2634F-4D8E-4F15-9A9A-BB1B6D19667D.jpeg  6AD7F078-CD27-46C7-B8C1-9FEBE4334898.jpeg  D6EDA70C-E868-4FD3-AC7A-3E7DF1AB8DAE.jpeg  C93BF88E-1686-4243-8831-93CA32F6C9CA.jpeg  45629725-29C0-418B-B42B-EC0D67B30FE7.jpeg  33E70A62-5569-4B1F-A3F0-D840B3975AAB.jpeg  F68E11D3-E41C-4A80-803C-4266FBC6AC37.jpeg  F631F285-8925-4611-8977-9DFB5A194A92.jpeg    Filippin Engineering Page 3 of 7 Printed on 5/29/2020 at 12:25 PM PDT    160E01C9-EBBC-4633-9528-A84BFC16639D.jpeg  0C3EC3CC-9E95-43F7-B343-48C19B654628.jpeg  6382F7AE-1D8B-4821-9B24-E8384397E123.jpeg  98620B38-B79E-443A-AD5B-B3CFE86902F7.jpeg  DE87CB3E-B0F2-4C9E-8B05-A29BD027427D.jpeg  A0FED4ED-D492-4BDD-8C35-2F48EC6A7B23.jpeg  3AEB6588-4D74-4B9F-8FC9-04D4EC893973.jpeg  D66FDC21-D672-4CA9-A321-4B040742BE01.jpeg    Filippin Engineering Page 4 of 7 Printed on 5/29/2020 at 12:25 PM PDT    DBCBBA3F-7C9E-4348-A22D-A7E265BD1164.jpeg  4B3431AC-2BDD-42F8-A393-7A05CC8CCFEA.jpeg  8C23041B-46A2-4AA7-A173-4DF46D32AD5B.jpeg  830B4B17-3E0A-4370-A62D-7ADF7A9D3971.jpeg  66599CE5-801B-4FF7-AFF8-0150A2732E87.jpeg  BD253897-4FCF-471C-A08A-EF896504710F.jpeg  467F37F0-ACC2-443E-89C2-351A7E101554.jpeg  0F38CE6F-6ABE-467B-8FD1-5D2A24E6C4E8.jpeg    Filippin Engineering Page 5 of 7 Printed on 5/29/2020 at 12:25 PM PDT    7372235C-EFF1-4FA4-AFF8-1E59BDBFB2CD.jpeg  4FA2EAC1-665D-4F01-9020-217FB8A00DBD.jpeg  3BD5FA87-277A-40C6-97EA-15F06E980D16.jpeg  698302A3-7C44-4E59-9B0B-9E179E453B8B.jpeg  32BF6DB1-3D9D-4C84-9193-9D2086D7981A.jpeg  B656DE79-FBDA-4AB9-BA6D-672775A0B028.jpeg  04D734E3-C10A-4AF8-8761-C5F26DA6BEA1.jpeg  A58E2165-962F-4B4C-850D-E543D891E4B8.jpeg    Filippin Engineering Page 6 of 7 Printed on 5/29/2020 at 12:25 PM PDT    2C80CD32-9C44-453C-BB85-46170FBF9357.jpeg  AEF9837E-D9DF-4CFB-BC07-AD9888242C39.jpeg  C1C89C0D-A5DE-49FB-9710-FE0BD82C432F.jpeg  6C34B678-0A1C-45EE-82FC-6FC944D6E8A2.jpeg  3F335820-CE69-4703-98BB-4781EB93AB1D.jpeg  39DF7416-1795-4953-B689-FC9933EDAEEF.jpeg  3E3B7477-A2CA-4905-AE6F-67A9D549C1A0.jpeg      By  Date  Copies To     Filippin Engineering Page 7 of 7 Printed on 5/29/2020 at 12:25 PM PDT        Jerry Missamore 5/4/2020