HomeMy WebLinkAbout2020-05-26Filippin Engineering
354-D S. Fairview Ave.
Goleta, California 93117
P: (805) 845-4602
Project: 194501 - SLO Marsh Street Bridge
Replacement
919 Palm St.
San Luis Obispo, California 93401
P: 8057817200
Daily Log Inspection: Tuesday 5/26/2020
NOTES LOG
No.Comments
1 Souza on site prepping bore excavation with rock.
LT direction drilling showed up at 8 AM to start setting their equipment into the entry pit.
D.Cry onsite to run long reach excavator.
2 Padre and Freddy (City of SLO) worked in the creek area to herd away fish and other critters.
3 Golding on site to Saw cut concrete street for SSMH at STA’s 53+75.26 & 53+93.37
4 Padre brought up the finch nesting bird under the bridge. Padre brought up possibly putting nets up under the bridge.
Otherwise to watch nest and knock down daily.
5 LT Directional was able to get the first drilling head under the abutments and under the creek.
Will start the reaming process tomorrow.
6 Souza began to dig the sewer line out of the exit pit towards SSMH 53+75.26
7 Talked with Alyssa Berry (Padre) about no netting under the bridge but to keep up the pro active work of knocking nests down.
Lyle N. (City of SLO) approved Padre weekend work to keep the nests from building up.
MANPOWER LOG 9 Workers | 72.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
1 Souza Dominic Judge- Foreman
BI 68
1 8.0 8.0
2 Souza Clay Souza- Operator
BI 68,83
1 8.0 8.0
3 Souza Shane Heilman-Laborer
BI 68,83
1 8.0 8.0
4 Souza Richard Lara-Laborer
BI 68
1 8.0 8.0
5 LT Directional
Boring
Leo Tidwell-Owner
BI 68
1 8.0 8.0
6 LT Directional
Boring
Adam Treece-Operator
BI 68
1 8.0 8.0
7 LT Directional
Boring
Raustin Torres-Laborer
BI 68
1 8.0 8.0
Filippin Engineering Page 1 of 8 Printed on 6/2/2020 at 02:47 PM PDT
MANPOWER LOG 9 Workers | 72.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
8 D. Cry Inc.David Cry-Owner/Operator
BI 68
1 8.0 8.0
9 Golding Saw Steve Golding & Cody Golding
BI 83
1 8.0 8.0
9 72.0
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 Ram 5500 utility truck 8.0 0.0 No 10:54 AM
Notes:Souza
2 Car 336 Long Reach
Excavator
4.0 4.0 No 10:55 AM
Notes:D. Cry
3 Cat 336 excavator 8.0 0.0 No 10:55 AM
Notes:Souza
4 2500 Gmc Crew cab 4.0 0.0 No 10:56 AM
Notes:Souza
5 Ram 5500 saw cutting truck 4.0 0.0 No 10:56 AM
Notes:Golding Saw
6 Ditch witch vac trailer 8.0 0.0 No 10:57 AM
Notes:LT. drilling
7 MAC drill truck 8.0 0.0 No 10:21 PM
Notes:LT Directonal
8 F550 crew truck 8.0 0.0 No 10:21 PM
Notes:LT Directional
OBSERVED WEATHER CONDITIONS
Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity
No
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
60°F 79°F 69°F 0.00 in.0.00 in.0.00 in.43%55%68%52°F 3.9 mph 7 mph 10 mph
Filippin Engineering Page 2 of 8 Printed on 6/2/2020 at 02:47 PM PDT
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
clear-day
60°F
clear-day
73°F
clear-day
79°F
clear-day
79°F
clear-day
75°F
clear-night
67°F
PHOTOS
44816705-5F76-4F0C-8D01-BB60B4C3CCE9.jpeg
1D8AE12A-8BB5-4795-BC84-89A00DF84E33.jpeg
4B230B61-2F84-483B-9B89-866F585CD43C.jpeg
7A0C14A0-F192-4F8B-8201-624E553446FA.jpeg
78C5F39F-F412-4734-A771-12C6FE161583.jpeg
9CF92945-DF1F-4F07-8B6B-B5E8A82868A9.jpeg
Filippin Engineering Page 3 of 8 Printed on 6/2/2020 at 02:47 PM PDT
AB9C686B-56EC-48C5-943D-A2394712532F.jpeg
F4E94C2D-43DF-436F-B2C5-F7B8B6449222.jpeg
9EE522A7-5992-4530-9025-A9DA95BBC7A9.jpeg
CFF85B93-E79C-4AB2-A0D5-61F18B473AC6.jpeg
FDBBF3CF-0965-4DE2-B0EC-979624669025.jpeg
78D7CC19-8333-4AB6-B568-51D5BE88899A.jpeg
2F4D0134-B3D5-4A46-92F5-ECA07A353205.jpeg
06083452-735E-4E8B-A26F-9ECA1054DFE3.jpeg
Filippin Engineering Page 4 of 8 Printed on 6/2/2020 at 02:47 PM PDT
8A8AFA72-301B-4516-A5BF-051664464E6B.jpeg
93EB8E97-A2B5-4E01-854C-52CB100E5148.jpeg
CC6E6520-E186-4460-B764-0A4BA219A38F.jpeg
88B77EDF-710D-4C3F-BF68-F782603B811A.jpeg
8BD9BF57-8BFD-42E0-B529-E1094615FA8F.jpeg
5ECBE971-5927-4DD1-A99F-303B42AEEB2E.jpeg
1D19E53F-036B-4FE2-81CB-3DE9F808C81F.jpeg
8C28F35A-1029-4F50-A8B7-DCBBEF8E754D.jpeg
Filippin Engineering Page 5 of 8 Printed on 6/2/2020 at 02:47 PM PDT
12E9AFAE-E172-435A-A020-5DC1C4E4775A.jpeg
3B2C4355-1F11-4D43-A775-D8E9FA9E9683.jpeg
58B14AC6-87A9-4052-B1C1-D09B1AF65F41.jpeg
1D197DEB-B524-454B-8338-57A911B67624.jpeg
61EE79C5-4B2C-45BA-AE86-DE725144A867.jpeg
84109D65-5FEB-4039-9DB4-BBF7B383C3C5.jpeg
E10F7DB5-FAE8-4592-B075-9A70125F4520.jpeg
BC072BC3-352E-4803-8C2B-388D2D76B486.jpeg
Filippin Engineering Page 6 of 8 Printed on 6/2/2020 at 02:47 PM PDT
037A220C-8491-4542-9376-B3E6EBF80976.jpeg
62A2DA88-6967-4B84-9656-E55CD8332BCF.jpeg
19A210EB-0147-4D66-A82C-65827224B208.jpeg
D67426A5-B5FD-44FB-A625-06DFF6823827.jpeg
EBFF4A0D-376A-475D-AD9C-4CA5D29CD87E.jpeg
779A39F9-05D5-4050-928F-B09648BF1C07.jpeg
4F845EC8-7868-41D3-A91A-87B5A4B2B67C.jpeg
7B0858F5-9653-4D2E-8C1B-41A6252D19E9.jpeg
Filippin Engineering Page 7 of 8 Printed on 6/2/2020 at 02:47 PM PDT
8C0E442F-3EE0-4B6E-93EF-1AD2F5D65BAC.jpeg
42BCA53D-F142-44F0-90BD-7F5AD75CAD19.jpeg
83DD3776-6321-4167-9620-9207F8D6AA93.jpeg
AB6A653A-9A70-42B3-BFCC-A61384C283DB.jpeg
37EA50F4-A83D-4197-8690-C9CC61F85696.jpeg
By Date Copies To
Filippin Engineering Page 8 of 8 Printed on 6/2/2020 at 02:47 PM PDT
Jerry Missamore 5/26/2020