Loading...
HomeMy WebLinkAbout2020-06-02Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Tuesday 6/2/2020      NOTES LOG   No.Comments   1 Souza on site continued to work on sealing off up stream coffer dam. Spoke with Souza and Padre about filter fabric needed in the creek as well as trying to figure out a way to lessen the trubity in the discharge bag. Freddy (City of SLo) spoke to Padre about the diversion still being active shut down and hard to not have trubity with work still going on to seal off coffer dams. Work was stopped at 2:25PM due to a steel head sighting between the first and second coffer dam on the up stream side.   2 Souza was working on Digging down to SSMH #1 and also SSMH #4 to get ready for the night tie on Wednesday.  3 Filled out quanitity sheets for Raul (FE) to insert #'s on spread sheet and send of over to SLO City   4 Spoke with Matt D. (FE) Lyle N. (City of SLO) about the Steal Head Issue. FE feels that Souza has not had control of the water in the creek therefore it is still in the dewater fase.   5 Jerry M. (FE) spoke to Souza about the caving in of the ditches and how critical re-compaction is going to be. Suggested that maybe Souza use slurry to back fill to get into all the nooks and cracks in the trenches and cave offs.   6 Souza indicated that after exposing the existing sewer line at SSMH #4 the line was 15” not 10” like is on the plans. Meeting to be held in the morning with Jermey G. (City of SLO Sewer) to discuss options to keep moving project forward.      MANPOWER LOG 12 Workers  |   96.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Dominic Judge-Foreman Bi 83,73   1 8.0 8.0       2 Souza Garret Vanfleet-Carpenter Foreman BI 14   1 8.0 8.0       3 Souza Remi Rodriguez-Laborer BI 83   1 8.0 8.0       4 Souza Sam Henley-Laborer Foreman BI 83   1 8.0 8.0       5 Souza Tommy Russo-Laborer BI 83,73   1 8.0 8.0       6 Souza Raymond Garcia-Carpenter Apprentice BI 14   1 8.0 8.0       7 Souza Steve Helberge-Carpenter BI 14   1 8.0 8.0         Filippin Engineering Page 1 of 8 Printed on 7/17/2020 at 11:45 AM PDT       MANPOWER LOG 12 Workers  |   96.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   8 Souza Mike Keuntje-Carpenter Apprentice BI 14   1 8.0 8.0       9 Souza Clay Souza-Operator BI 14   1 8.0 8.0       10 Souza Shane Hielman-Laborer Bi 14   1 8.0 8.0       11 Padre Associates, Inc. Alyssa Berry-Enviromental   1 8.0 8.0       12 Padre Associates, Inc. Kenny Wimer-Enviromental   1 8.0 8.0          12  96.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   03:10 PM    Notes:Souza  2 Car 336 Long Reach Excavator No   03:10 PM    Notes:D.Cry  3 Cat 336 excavator No   03:10 PM    Notes:Souza  4 F350 crew truck No   03:10 PM    Notes:Souza  5 F450 Super Duty No   03:10 PM    Notes:Souza  6 Ram 5500 utility truck No   03:10 PM    Notes:Souza  7 Case 550N backhoe No   03:10 PM    Notes:Souza  8 Rental Mini excavator No   03:10 PM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        Filippin Engineering Page 2 of 8 Printed on 7/17/2020 at 11:45 AM PDT      WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 55°F 79°F 66°F 0.01 in.0.01 in.0.03 in.44%65%90%53°F 5.1 mph 8 mph 11 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-day   57°F partly-cloudy-day   66°F clear-day   80°F partly-cloudy-day   78°F partly-cloudy-day   74°F partly-cloudy-night   65°F   PHOTOS D2BCF727-5A50-446E-A68A-2AFA4C73C1B8.jpeg  AA06DF5D-B64A-428D-B65D-A19BF5C28C5F.jpeg  E451888D-4F39-4371-B375-F87F65900C51.jpeg  22935063-5658-4FBA-BCED-CBB3AEFE6E71.jpeg  CC67B0A0-E830-4B9E-9D93-5E1A67A48E37.jpeg  9A08DF43-36B7-4873-85AE-40367026F80F.jpeg    Filippin Engineering Page 3 of 8 Printed on 7/17/2020 at 11:45 AM PDT    A2AE967A-9894-46F9-9883-814B02448479.jpeg  DFD5BC3C-D5C0-4F5D-8C64-96B3B32F4D3B.jpeg  4AC0B9A4-73C4-4787-B0C7-C79D557C1C26.jpeg  CDE4E2F3-CBD0-4F1F-9B9D-0CB0A21F3B6C.jpeg  EA44B7A0-1301-4930-906F-EB82181EADF8.jpeg  5B8D7F2F-7C04-4701-8C35-13F0F536C537.jpeg  29865534-2F8E-402E-9E23-073E881FA029.jpeg  65621850-BD70-4F38-B79D-5402841AC241.jpeg    Filippin Engineering Page 4 of 8 Printed on 7/17/2020 at 11:45 AM PDT    7A336F5E-A0C9-40EE-9B14-C28CC9EAC609.jpeg  EC86682F-E85E-42F7-B12C-FF520A02E4EB.jpeg  155271CA-CE6D-46F8-8E4F-3433DC3E7992.jpeg  C2F405FD-5E9D-4CDD-AB60-CA94D760AF9A.jpeg  1F0E3FB2-1B24-4F13-9CD3-CD50BBF2A65C.jpeg  B471847B-47D1-48B4-8DD2-9713ABB57EFB.jpeg  FA28D8FC-9821-46D7-A531-3A97CB01472D.jpeg  99222EA7-9169-4E10-A426-B30D1F3DC2F2.jpeg    Filippin Engineering Page 5 of 8 Printed on 7/17/2020 at 11:45 AM PDT    E8E5F2C2-AD94-4B4C-97D7-5D1C6CBB5051.jpeg  443C2757-29A6-4C5F-BC90-A6C70FCE14EC.jpeg  E6A08FE3-5A23-43F9-B10E-A5868A238618.jpeg  F6B1502F-0B2C-4906-A78E-E98AD8CE103A.jpeg  5BDD9E6D-BDCD-494C-AC22-05B4BF7AB459.jpeg  0821E506-98AA-41F6-95D7-94EAF35A2830.jpeg  B5AE3B7E-55FE-429D-8D9B-C3C9C71F09AA.jpeg  780F1C60-B83E-4F0D-AF7B-5C03D26848DB.jpeg    Filippin Engineering Page 6 of 8 Printed on 7/17/2020 at 11:45 AM PDT    94361E35-7A70-4A9A-A917-08CF1D1FFCE4.jpeg  FB30B97A-4762-4255-9D66-85AD2CB43606.jpeg  8D095D0F-B6E1-4191-8C60-07E697D2794D.jpeg  28D1D839-D91A-404A-9186-BE81917804FB.jpeg  C128D62B-2C64-45F7-AADB-68A833D43525.jpeg  95B54AD1-FA8E-40AD-9405-60E0BC145E7C.jpeg  C64A024E-D7CE-495E-9CDF-B3730007A578.jpeg  8D3B258D-6782-451E-967E-A4D4C05B8553.jpeg    Filippin Engineering Page 7 of 8 Printed on 7/17/2020 at 11:45 AM PDT    887D0DB6-3570-4645-8299-95904ED4D925.jpeg 66B3EAD7-54A4-4293-B92C-DD23C0BCABDA.jpeg      By  Date  Copies To     Filippin Engineering Page 8 of 8 Printed on 7/17/2020 at 11:45 AM PDT        Jerry Missamore 6/2/2020