Loading...
HomeMy WebLinkAbout2020-07-01Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Wednesday 7/1/2020      NOTES LOG   No.Comments   1 Jerry M. Observation: Souza onsite at 7 AM doing general clean up and prepping site for Condon Johnson on Monday. Spoke with Garrett V. (Souza Foreman) and FE was informed these type of operations would continue tomorrow as well. Also pile layout was going to be achieved as well. The indication in the field is the CJ will start on abutment 1 side and use the longer material to procure the material for abutment 2 side due the differing site condition RFI 19. Alyssa B. (Padre) was onsite as well and discussed the SE corner at abutment 2 were the retaining wall step is. Alyssa brought up the concern about the sheen seen on top of the standing water in the step area. It was decided that CDS would test the area for hydrocarbons and decide if the area was contaminated or not. If the area is contaminated then we would have to address the discharge of the water and the haul off possibility.      MANPOWER LOG 4 Workers  |   32.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet-Carpenter Foreman BI 22   1 8.0 8.0       2 Souza Clay Souza-Operator BI 22   1 8.0 8.0       3 Souza Mylan Elder-Carpenter BI 22   1 8.0 8.0       4 Souza Dana Missamore-Laborer BI 22 Flagging   1 8.0 8.0          4  32.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab 8.0 No   01:15 PM    Notes:Souza  2 Cat 336 excavator 8.0 No   01:15 PM    Notes:Souza  3 Cat 336 excavator 8.0 No   01:15 PM    Notes:D.Crye    Filippin Engineering Page 1 of 2 Printed on 7/17/2020 at 12:16 PM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 F450 Super Duty 8.0 No   01:15 PM    Notes:Souza  5 Doosan P185 Air Compressor 8.0 No   01:15 PM    Notes:Souza  6 Skid Steer with Bucket 8.0 No   01:25 PM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 63°F 58°F 0.00 in.0.00 in.0.01 in.74%86%100%53°F 4.9 mph 8 mph 13 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-day   52°F partly-cloudy-day   55°F partly-cloudy-day   61°F partly-cloudy-day   64°F partly-cloudy-day   61°F partly-cloudy-night   58°F     By  Date  Copies To     Filippin Engineering Page 2 of 2 Printed on 7/17/2020 at 12:16 PM PDT        Jerry Missamore 7/1/2020