Daily Log Inspection: Tuesday 7/14/2020
NOTES LOG
No.Comments
1 Souza and Condon Johnson on site at 7 AM awaiting arrival of link needed to fix track on drill rig. Switzer diesel mechanic on
site to help install link as soon as it arrives.
2 With 8 pile left to drill in abutment 1 footing the delta on the extra length for the micro pile is 38.35' based on notes from FE in
the field and also Condon Johnson notes in their installation logs.
3 Part arrived at 10:30 AM for drill rig. Will take approx. 2 hours to install. Condon Johnson indicated to me that they will not drill
today and start back up tomorrow. Souza also indicated to me that if the order extra material arrives today or tomorrow then
Condon Johnson was going to request to work on Saturday.
4 Drill rig was fixed and up and running by 1:30 PM. Condon Johnson decided to still hold off on drilling for today and wait to go
until tomorrow. CJ expressed how they are still waiting on response to RFI #30 to drill micropiles sequentially so that it will
speed up the process instead of everyother one.
MANPOWER LOG 6 Workers | 48.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
1 Souza Clay Souza-Operator
BI 22/37
1 8.0 8.0
2 Condon Johnson Jose Toual-Operator Foreman
BI 37
1 8.0 8.0
3 Condon Johnson Francisco Toro-Laborer
BI 37
1 8.0 8.0
4 Condon Johnson Juan Dones-Operator
BI 37
1 8.0 8.0
5 Condon Johnson Charles Lee-Project Engineer
BI 37
1 8.0 8.0
6 Condon Johnson Jose Vasquez-Laborer
BI 37
1 8.0 8.0
6 48.0
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 2500 Gmc Crew cab No 01:15 PM
Notes:Souza
Filippin Engineering Page 1 of 3 Printed on 7/23/2020 at 12:45 PM PDT
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
2 Cat 336 excavator No 01:15 PM
Notes:Souza
3 Cat 349 excavator No 01:15 PM
Notes:D.Crye
4 F250 crew truck No 01:15 PM
Notes:Condon Johnson
5 Gout Mixing/pump station No 01:15 PM
Notes:Condon Johnson
6 F450 Super Duty No 01:15 PM
Notes:Souza
7 Doosan P185 Air
Compressor
No 01:15 PM
Notes:Souza
8 F550 crew truck No 01:15 PM
Notes:Doizer saw cutting
9 F550 Utility Truck No 01:25 PM
Notes:Condon Johnson
10 Cat 308 Mini Excavator No 01:25 PM
Notes:Condon Johnson
11 Sullair 1150xh
aircompressor
No 01:25 PM
Notes:Condon Johnson
12 United rentals big generator No 01:25 PM
Notes:Condon Johnson
13 Ecco 512-36 JCB forklift No 01:25 PM
Notes:Condon Johnson
14 Skid Steer with Bucket No 01:25 PM
Notes:Souza
VISITOR LOG
No.Visitor Start Time End Time Details
1 Jason Redding(Switzer Diesel
Repair)
07:20 AM 02:20 PM on site to work on repairing Drill rig for Condon Johnson
OBSERVED WEATHER CONDITIONS
Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity
No
Filippin Engineering Page 2 of 3 Printed on 7/23/2020 at 12:45 PM PDT
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
51°F 67°F 58°F 0.01 in.0.02 in.0.03 in.62%86%100%53°F 5.0 mph 8 mph 14 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
partly-cloudy-night
53°F
partly-cloudy-day
54°F
partly-cloudy-day
62°F
clear-day
66°F
clear-day
66°F
clear-night
57°F
By Date Copies To
Filippin Engineering Page 3 of 3 Printed on 7/23/2020 at 12:45 PM PDT
Jerry Missamore 7/14/2020