Loading...
HomeMy WebLinkAbout2020-07-14Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Tuesday 7/14/2020      NOTES LOG   No.Comments   1 Souza and Condon Johnson on site at 7 AM awaiting arrival of link needed to fix track on drill rig. Switzer diesel mechanic on site to help install link as soon as it arrives.   2 With 8 pile left to drill in abutment 1 footing the delta on the extra length for the micro pile is 38.35' based on notes from FE in the field and also Condon Johnson notes in their installation logs.   3 Part arrived at 10:30 AM for drill rig. Will take approx. 2 hours to install. Condon Johnson indicated to me that they will not drill today and start back up tomorrow. Souza also indicated to me that if the order extra material arrives today or tomorrow then Condon Johnson was going to request to work on Saturday.   4 Drill rig was fixed and up and running by 1:30 PM. Condon Johnson decided to still hold off on drilling for today and wait to go until tomorrow. CJ expressed how they are still waiting on response to RFI #30 to drill micropiles sequentially so that it will speed up the process instead of everyother one.      MANPOWER LOG 6 Workers  |   48.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Clay Souza-Operator BI 22/37   1 8.0 8.0       2 Condon Johnson Jose Toual-Operator Foreman BI 37   1 8.0 8.0       3 Condon Johnson Francisco Toro-Laborer BI 37   1 8.0 8.0       4 Condon Johnson Juan Dones-Operator BI 37   1 8.0 8.0       5 Condon Johnson Charles Lee-Project Engineer BI 37   1 8.0 8.0       6 Condon Johnson Jose Vasquez-Laborer BI 37   1 8.0 8.0          6  48.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   01:15 PM    Notes:Souza    Filippin Engineering Page 1 of 3 Printed on 7/23/2020 at 12:45 PM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 Cat 336 excavator No   01:15 PM    Notes:Souza  3 Cat 349 excavator No   01:15 PM    Notes:D.Crye  4 F250 crew truck No   01:15 PM    Notes:Condon Johnson  5 Gout Mixing/pump station No   01:15 PM    Notes:Condon Johnson  6 F450 Super Duty No   01:15 PM    Notes:Souza  7 Doosan P185 Air Compressor No   01:15 PM    Notes:Souza  8 F550 crew truck No   01:15 PM    Notes:Doizer saw cutting  9 F550 Utility Truck No   01:25 PM    Notes:Condon Johnson  10 Cat 308 Mini Excavator No   01:25 PM    Notes:Condon Johnson  11 Sullair 1150xh aircompressor No   01:25 PM    Notes:Condon Johnson  12 United rentals big generator No   01:25 PM    Notes:Condon Johnson  13 Ecco 512-36 JCB forklift No   01:25 PM    Notes:Condon Johnson  14 Skid Steer with Bucket No   01:25 PM    Notes:Souza        VISITOR LOG     No.Visitor Start Time End Time Details 1 Jason Redding(Switzer Diesel Repair) 07:20 AM 02:20 PM  on site to work on repairing Drill rig for Condon Johnson   OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        Filippin Engineering Page 2 of 3 Printed on 7/23/2020 at 12:45 PM PDT      WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 67°F 58°F 0.01 in.0.02 in.0.03 in.62%86%100%53°F 5.0 mph 8 mph 14 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-night   53°F partly-cloudy-day   54°F partly-cloudy-day   62°F clear-day   66°F clear-day   66°F clear-night   57°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 7/23/2020 at 12:45 PM PDT        Jerry Missamore 7/14/2020