Project: 194501 - SLO Marsh Street Bridge
Replacement
919 Palm St.
San Luis Obispo, California 93401
P: 8057817200
Daily Log Inspection: Thursday 7/16/2020
NOTES LOG
No.Comments
1 Souza and Condon Johnson on site at 7 AM. Condon Johnson began drilling on Pile #35 at abutment 1.
As Condon Johnson was drilling at Pile #35 talks were happening with Dokken over the arrangement and batter of piles # 1
&18. RFI 35.1 came back with a response to proceed with the location of the piles and try and achieve the most batter as
physical possible with the machine.
Condon Johnson proceed with Pile #18 and were able to achieve 11.7% batter and on Pile #1 were able to achieve 6.3%
perpendicular with center line of abutment 1.
2 When pile # 18 & 1 were completed then Souza was going to sketch up final layout and footing configuration so that Dokken
can review and look at final layout for new wing wall and what is acceptable.
Weekly meeting was held to go over 3 week look ahead schedule and Bio concerns. PR for the project was up to speed and
seemed to have no issues. Kaylie (Verdin) wanted an update by end of day Friday to update website by Monday.
3 Souza crew (Garrett V.) indicated that any design work help needed to figure out a the response to RFI 28 would be tracked as
extra work.
4 Condon Johnson set up for testing of the production piles this afternoon. CJ going to start at pile #8. Extra work ticket provided
by Condon Johnson for 1/2 for all crew members and equipment.
Set up Earthsystems to sample structure backfill material at Souza's Prado Rd grading site. Sample was provided by Souza to
Marsh St. office and also Souza provided a test result from Geo Solutions for the proposed material. Earthsystems to verify
that it meets all Caltrans and City Standards for structure backfill.
5 Meet with Lyle N. (City of SLO) on site and went over the different critical items of work that were happening onsite. Looked at
the SW corner and the existing wing wall and shoring issue. Looked at the layout of the micro pile in the corner. Discussed site
schedule and the progress being made onsite.
6 Lyle N. (City of SLO) still working on the WDID # to upload the project to smarts. Cheril M. (FE) working with Souza directly on
the weekly, monthly, quarterly, and yearly reports.
Weekly BMP inspections are kept up by Jerry M.(FE)
7 Souza brought in extra trench plates to facilitate Condon Johnson's need to test the micro pile at a batter.
MANPOWER LOG 10 Workers | 72.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
1 Souza Garrett Vanfleet- Carpenter Foreman
BI 37
1 8.0 8.0
2 Souza Clay Souza-Operator
BI 37
1 4.0 4.0
3 Condon Johnson Jose Toual-Operator Foreman
BI 37
1 8.0 8.0
Filippin Engineering Page 1 of 3 Printed on 7/23/2020 at 12:46 PM PDT
MANPOWER LOG 10 Workers | 72.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
4 Condon Johnson Francisco Toro-Laborer
BI 37
1 8.0 8.0
5 Condon Johnson Juan Dones-Operator
BI 37
1 8.0 8.0
6 Condon Johnson Chris Cleary-Laborer
BI 37
1 8.0 8.0
7 Condon Johnson Charles Lee-Project Engineer
BI 37
1 8.0 8.0
8 Condon Johnson Eric Oliveros-Laborer
BI 37
1 8.0 8.0
9 Condon Johnson Jose Vasquez-Laborer
BI 37
1 8.0 8.0
10 Souza Mylan Elder- Apprentice Carpenter
BI 37
1 4.0 4.0
10 72.0
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 2500 Gmc Crew cab No 01:15 PM
Notes:Souza
2 Cat 336 excavator No 01:15 PM
Notes:Souza
3 Cat 349 excavator No 01:15 PM
Notes:D.Crye
4 F250 crew truck No 01:15 PM
Notes:Condon Johnson
5 Gout Mixing/pump station No 01:15 PM
Notes:Condon Johnson
6 F450 Super Duty No 01:15 PM
Notes:Souza
7 Doosan P185 Air
Compressor
No 01:15 PM
Notes:Souza
8 F550 crew truck No 01:15 PM
Notes:Doizer saw cutting
Filippin Engineering Page 2 of 3 Printed on 7/23/2020 at 12:46 PM PDT
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
9 F550 Utility Truck No 01:25 PM
Notes:Condon Johnson
10 Cat 308 Mini Excavator No 01:25 PM
Notes:Condon Johnson
11 Sullair 1150xh
aircompressor
No 01:25 PM
Notes:Condon Johnson
12 United rentals big generator No 01:25 PM
Notes:Condon Johnson
13 Ecco 512-36 JCB forklift No 01:25 PM
Notes:Condon Johnson
14 Skid Steer with Bucket No 01:25 PM
Notes:Souza
OBSERVED WEATHER CONDITIONS
Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity
No
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
55°F 71°F 62°F 0.00 in.0.01 in.0.02 in.59%78%95%55°F 4.4 mph 7 mph 11 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
partly-cloudy-night
56°F
partly-cloudy-day
61°F
clear-day
69°F
clear-day
70°F
clear-day
68°F
clear-night
61°F
By Date Copies To
Filippin Engineering Page 3 of 3 Printed on 7/23/2020 at 12:46 PM PDT
Jerry Missamore 7/16/2020