HomeMy WebLinkAbout2020-07-17Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Friday 7/17/2020      NOTES LOG   No.Comments   1 Souza and Condon Johnson onsite at 7 AM to preform proof test on production pile #8. Souza prepping abutment 2 side for Condon Johnson to begin drilling.   2 Condon Johnson preformed test on Pile #8 at 9 AM. Test was completed by 9:30 and passed the acceptable load test. The fluctuation between kips was less than the specs called out for 1-2 difference.   3 Went over extra work tickets with Lyle N. (CIty of Slo) also got them organized.  4 Condon Johnson done testing Pile #28 at 11 AM. CJ was moving testing material to pile #34 in preparing for test on Monday 7/20. All work is contract work as testing is a required step in the micro pile installation.   5 Sewer Siphon on the on abutment 2 side appears to be in the footing for approx. 1' for 3'2'' from back edge of footing.  6 15.5’ of ESA fence installed.  7 Went over water stop areas in the plans with Ethan S. (Souza) over the phone and led him to the Caltrans Standard plans for details.   8 Condon Johnson has couplers and material onsite to start at abutment 2 micro pile. Questioned was posed to Will S. (Souza) about getting started with material onsite and no answer was given back.      MANPOWER LOG 10 Workers  |   80.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 22/37   1 8.0 8.0       2 Souza Mike Kenutje-Carpenter Apprentice BI 38/39   1 8.0 8.0       3 Condon Johnson Jose Toual-Operator Foreman BI 37   1 8.0 8.0       4 Condon Johnson Francisco Toro-Laborer BI 37   1 8.0 8.0       5 Condon Johnson Juan Dones-Operator BI 37   1 8.0 8.0       6 Condon Johnson Chris Cleary-Laborer BI 37   1 8.0 8.0       7 Condon Johnson Charles Lee-Project Engineer BI 37   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 7/23/2020 at 12:46 PM PDT       MANPOWER LOG 10 Workers  |   80.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   8 Condon Johnson Eric Oliveros-Laborer BI 37   1 8.0 8.0       9 Condon Johnson Jose Vasquez-Laborer BI 37   1 8.0 8.0       10 Souza Mylan Elder-Laborer BI 37   1 8.0 8.0          10  80.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   01:15 PM    Notes:Souza  2 Cat 336 excavator No   01:15 PM    Notes:Souza  3 Cat 349 excavator No   01:15 PM    Notes:D.Crye  4 F250 crew truck No   01:15 PM    Notes:Condon Johnson  5 Gout Mixing/pump station No   01:15 PM    Notes:Condon Johnson  6 F450 Super Duty No   01:15 PM    Notes:Souza  7 Doosan P185 Air Compressor No   01:15 PM    Notes:Souza  8 F550 crew truck No   01:15 PM    Notes:Doizer saw cutting  9 F550 Utility Truck No   01:25 PM    Notes:Condon Johnson  10 Cat 308 Mini Excavator No   01:25 PM    Notes:Condon Johnson  11 Sullair 1150xh aircompressor No   01:25 PM    Notes:Condon Johnson  12 United rentals big generator No   01:25 PM    Notes:Condon Johnson  13 Ecco 512-36 JCB forklift No   01:25 PM    Notes:Condon Johnson    Filippin Engineering Page 2 of 3 Printed on 7/23/2020 at 12:46 PM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   14 Skid Steer with Bucket No   01:25 PM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 55°F 69°F 61°F 0.00 in.0.00 in.0.01 in.67%80%93%55°F 4.3 mph 7 mph 12 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-night   58°F partly-cloudy-day   60°F clear-day   69°F clear-day   70°F clear-day   66°F partly-cloudy-night   60°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 7/23/2020 at 12:46 PM PDT        Jerry Missamore 7/17/2020