Loading...
HomeMy WebLinkAbout2020-08-17Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Monday 8/17/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM the plan is to start on the front of abutment 2 footing and getting the dirt graded for the pad for false work. PSG started the steel up top for abutment 1 WW left. Once the air compressor arrives they will finish up the couplers at abutment 1.   2 Souza was directed by the City to reestablish the pedestrian detour at Osos and Marsh due to the left hand turn off of Marsh on to Osos in the east bound direction.   3 Spoke with Lyle N. (City of SLO) about RFI 41 and got clairfication on the type of material to use for which openings. RFI to be responded to today.   4 PSG left at 11AM off site and will not be back until tomorrow. There was still contract work to be done at both right and left wing walls at abutment 1.   5 At 11 Am Souza began setting fronts at abutment 2 to be ready for ironworkers after they finish at abutment 1.  6 Souza brought in a Hamm Sheeps foot compactor to compact pad where falswork bent is going.  7 Spoke with Souza crew about moving the fence up and getting rid of the SSMH #1 that was replaced last week. Also requested again the materials tickets for Thursday 8/13 (Rock, & sand for the SSMH backfill)   8 Souza had concrete washout replaced with a new one.     MANPOWER LOG 11 Workers  |   68.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Clay Souza-Operator BI 39   1 4.0 4.0       3 Souza Mylan Elder- Apprentice Carpenter BI 38,39,40   1 8.0 8.0       4 Souza Steve Helenberg-Carpenter BI 39,40   1 8.0 8.0       5 Souza Mark Missamore-Carpenter Foreman BI 38,40   1 8.0 8.0       6 Pacific Steel Group Tyler Hintz- Ironworker BI43   1 4.0 4.0       7 Pacific Steel Group John Hamilton-Foreman ironworker BI 43   1 4.0 4.0         Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:13 PM PDT       MANPOWER LOG 11 Workers  |   68.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   8 Pacific Steel Group James Hintz- Iron Worker BI 43   1 4.0 4.0       9 D. Cry Inc.Thomas Switzer-Operator BI 40,39   1 8.0 8.0       10 Souza Mike Keuntje-Carpenter Apprentice BI 39,40   1 8.0 8.0       11 Souza Johnathan Pudrick-Teamster BI 40   1 4.0 4.0          11  68.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   01:15 PM    Notes:Souza  2 Cat 336 excavator No   01:15 PM    Notes:Souza  3 F450 Super Duty No   01:15 PM    Notes:Souza  4 Caterpillar Reachlift No   01:45 AM    Notes:Souza  5 3500 GMC crew truck No   01:15 AM    Notes:Souza  6 Cat 336 Long Reach Excavator No   01:10 AM    Notes:D. Crye  7 Cat 308 Mini Excavator No   01:30 AM    Notes:Souza  8 2500 Gmc Crew cab No   01:00 AM    Notes:Souza  9 305 Cat Mini Excavator No   01:55 AM    Notes:Souza  10 Doosan P185 Air Compressor No   01:55 AM    Notes:Souza  11 2500 GMC flatbed No   01:55 AM    Notes:PSG  12 Big Tex trailer No   01:55 AM    Notes:Souza    Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:13 PM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   13 Rental Man Lift United Rentals No   01:55 AM    Notes:Souza  14 Sciiscor lift United Rentals No   01:55 AM    Notes:Souza  15 Kenworth H2O truck No   01:45 PM    Notes:Souza  16 Hamm Sheeps foot compactor No   01:45 PM    Notes:Souza (United Rentals)    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 66°F 87°F 75°F 0.01 in.0.04 in.0.08 in.43%62%81%61°F 4.2 mph 8 mph 13 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   67°F clear-day   74°F clear-day   88°F clear-day   87°F clear-day   80°F clear-night   73°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:13 PM PDT        Jerry Missamore 8/17/2020