Loading...
HomeMy WebLinkAbout2020-08-18Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Tuesday 8/18/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM finishing up setting panels on the front side of the abutment 2. PSG on site setting Abutment 1 WW left side iron. Dwight Peterson trucking was on site at 9 AM to move D.Crye 336 Long Reach Excavator to west side of project.   2 Spoke with Steve S. (Souza) about electrical plan and if Souza had checked with Lee Wilson electrical sub and made sure that everyone understood the plan for the bridge and street lighting.   3 Spoke with Claudia Turner (Gas Company) about the gas sleeve needed to go through the deck. Claudia mentioned that the plans in Gas Company posession had a different size opening. a 10'' was called out not an oval opening.   4   5 PSG finished up torquing on the couplers at abutment 1 for the plan sheet revision 27R1. One Souza employee went home due to possible heat exhaust. Record breaking heat in San Luis for the beggining of the week.   6 Souza crew was moving things around to prep for a steel delivery on 8/19 at 10AM. PSG finished daily tasks at 2:30PM and called an early day due to heat.      MANPOWER LOG 9 Workers  |   68.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Clay Souza-Operator BI 39   1 8.0 8.0       3 Souza Mylan Elder- Apprentice Carpenter BI 38,39,40   1 8.0 8.0       4 Souza Steve Helenberg-Carpenter BI 39,40   1 8.0 8.0       5 Souza Mark Missamore-Carpenter Foreman BI 38,40   1 8.0 8.0       6 Pacific Steel Group Tyler Hintz- Ironworker BI43   1 8.0 8.0       7 Pacific Steel Group John Hamilton-Foreman ironworker BI 43   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:13 PM PDT       MANPOWER LOG 9 Workers  |   68.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   8 Pacific Steel Group James Hintz- Iron Worker BI 43   1 8.0 8.0       9 Souza Mike Keuntje-Carpenter Apprentice BI 39,40   1 4.0 4.0          9  68.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   01:15 PM    Notes:Souza  2 Cat 336 excavator No   01:15 PM    Notes:Souza  3 F450 Super Duty No   01:15 PM    Notes:Souza  4 Caterpillar Reachlift No   01:45 AM    Notes:Souza  5 3500 GMC crew truck No   01:15 AM    Notes:Souza  6 Cat 336 Long Reach Excavator No   01:10 AM    Notes:D. Crye  7 Cat 308 Mini Excavator No   01:30 AM    Notes:Souza  8 2500 Gmc Crew cab No   01:00 AM    Notes:Souza  9 305 Cat Mini Excavator No   01:55 AM    Notes:Souza  10 Doosan P185 Air Compressor No   01:55 AM    Notes:Souza  11 2500 GMC flatbed No   01:55 AM    Notes:PSG  12 Big Tex trailer No   01:55 AM    Notes:Souza  13 Rental Man Lift United Rentals No   01:55 AM    Notes:Souza  14 Sciiscor lift United Rentals No   01:55 AM    Notes:Souza    Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:13 PM PDT      OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 70°F 94°F 82°F 0.01 in.0.02 in.0.05 in.32%49%69%60°F 5.7 mph 9 mph 15 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   71°F clear-day   78°F clear-day   93°F clear-day   95°F clear-day   90°F clear-night   84°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:13 PM PDT        Jerry Missamore 8/18/2020