Loading...
HomeMy WebLinkAbout2020-08-19Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Wednesday 8/19/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM to assist PSG in lifting the 8’x12’ 90 bars coming out of the abutment into the deck. PSG accepted a delivery for abutment 2 iron.   2 Souza loaded up water Golding tank on Dwight Peterson trucking and removed from site. United Rentals was on site to remove one of the baker tanks.   3 Questioned was posed to Stuart S. (Souza) about company policy for air quality due to the increase in smoke due to wildfires   4 Went over any news business with Raul and Jeff for tomorrow’s weekly meeting   5 CDS on site at 11:30AM to test the dewatering per permits.  6 Looking at Right side edge of deck running under over hang at Davita. Souza may have to form up under the over hang to allow the driveway to be poured on top.      MANPOWER LOG 11 Workers  |   84.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Clay Souza-Operator BI 39   1 8.0 8.0       3 Souza Mylan Elder- Apprentice Carpenter BI 38,39,40   1 8.0 8.0       4 Souza Steve Helenberg-Carpenter BI 39,40   1 8.0 8.0       5 Souza Mark Missamore-Carpenter Foreman BI 38,40   1 8.0 8.0       6 Pacific Steel Group Tyler Hintz- Ironworker BI43   1 8.0 8.0       7 Pacific Steel Group John Hamilton-Foreman ironworker BI 43   1 8.0 8.0       8 Pacific Steel Group James Hintz- Iron Worker BI 43   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 10/22/2020 at 08:38 AM PDT       MANPOWER LOG 11 Workers  |   84.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   9 Souza Mike Keuntje-Carpenter Apprentice BI 39,40   1 4.0 4.0       10 Pacific Steel Group Kyle Macintosh- Iron worker BI 43   1 8.0 8.0       11 Pacific Steel Group Kieth Matthews- iron worker Foreman BI 43   1 8.0 8.0          11  84.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   01:15 PM    Notes:Souza  2 Cat 336 excavator No   01:15 PM    Notes:Souza  3 F450 Super Duty No   01:15 PM    Notes:Souza  4 Caterpillar Reachlift No   01:45 AM    Notes:Souza  5 3500 GMC crew truck No   01:15 AM    Notes:Souza  6 Cat 336 Long Reach Excavator No   01:10 AM    Notes:D. Crye  7 Cat 308 Mini Excavator No   01:30 AM    Notes:Souza  8 2500 Gmc Crew cab No   01:00 AM    Notes:Souza  9 305 Cat Mini Excavator No   01:55 AM    Notes:Souza  10 Doosan P185 Air Compressor No   01:55 AM    Notes:Souza  11 2500 GMC flatbed No   01:55 AM    Notes:PSG  12 Big Tex trailer No   01:55 AM    Notes:Souza  13 Rental Man Lift United Rentals No   01:55 AM    Notes:Souza    Filippin Engineering Page 2 of 3 Printed on 10/22/2020 at 08:38 AM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   14 Sciiscor lift United Rentals No   01:55 AM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 78°F 96°F 86°F 0.01 in.0.02 in.0.03 in.24%31%48%52°F 8.1 mph 11 mph 17 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   80°F clear-day   84°F clear-day   95°F clear-day   96°F clear-day   92°F clear-night   84°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/22/2020 at 08:38 AM PDT        Jerry Missamore 8/19/2020