Loading...
HomeMy WebLinkAbout2020-08-20Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Thursday 8/20/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM drilling for abutment 1 WW RT rebar to go through the abutment pannels. PSG on site to continue installing 90 bars at abutment 1.   2 Souza began installing whalers on back side of abutment 1.  3 Weekly meeting was held to discuss look ahead schedule, bio/enviromental issues, and and PR related issues. Outstanding issues for RFI's was the utility sleeves and also the water sampling item. Appears water sampling item will go towards the claim process.   4 Spoke with Garrett V. (Souza) suggested that he double check PSG rebar layout for the #9 90 bars comming out of the abutment into the deck.   5 Souza employee was sent to med-stop after a splinter lodge into his shoulder.  6 FE began looking into the differing site condition claim that was sent over by Souza. Current price tag is at approx. $60,0000+/-      MANPOWER LOG 10 Workers  |   80.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Clay Souza-Operator BI 39   1 8.0 8.0       3 Souza Mylan Elder- Apprentice Carpenter BI 39   1 8.0 8.0       4 Souza Steve Helenberg-Carpenter BI 39   1 8.0 8.0       5 Souza Mark Missamore-Carpenter Foreman BI 39   1 8.0 8.0       6 Pacific Steel Group Tyler Hintz- Ironworker BI43   1 8.0 8.0       7 Pacific Steel Group John Hamilton-Foreman ironworker BI 43   1 8.0 8.0       8 Pacific Steel Group James Hintz- Iron Worker BI 43   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:13 PM PDT       MANPOWER LOG 10 Workers  |   80.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   9 Pacific Steel Group Kyle Macintosh- Iron worker BI 43   1 8.0 8.0       10 Pacific Steel Group Kieth Matthews- iron worker Foreman BI 43   1 8.0 8.0          10  80.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   01:15 PM    Notes:Souza  2 Cat 336 excavator No   01:15 PM    Notes:Souza  3 F450 Super Duty No   01:15 PM    Notes:Souza  4 Caterpillar Reachlift No   01:45 AM    Notes:Souza  5 3500 GMC crew truck No   01:15 AM    Notes:Souza  6 Cat 336 Long Reach Excavator No   01:10 AM    Notes:D. Crye  7 Cat 308 Mini Excavator No   01:30 AM    Notes:Souza  8 2500 Gmc Crew cab No   01:00 AM    Notes:Souza  9 305 Cat Mini Excavator No   01:55 AM    Notes:Souza  10 Doosan P185 Air Compressor No   01:55 AM    Notes:Souza  11 2500 GMC flatbed No   01:55 AM    Notes:PSG  12 Big Tex trailer No   01:55 AM    Notes:Souza  13 Rental Man Lift United Rentals No   01:55 AM    Notes:Souza  14 Sciiscor lift United Rentals No   01:55 AM    Notes:Souza    Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:13 PM PDT      OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 71°F 87°F 79°F 0.00 in.0.01 in.0.02 in.24%35%45%49°F 7.5 mph 12 mph 18 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   72°F clear-day   78°F clear-day   84°F clear-day   86°F clear-day   84°F clear-night   75°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:13 PM PDT        Jerry Missamore 8/20/2020