Loading...
HomeMy WebLinkAbout2020-08-21Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Friday 8/21/2020      NOTES LOG   No.Comments   1 Souza 7-man crew worked on AB1 placing whalers and double-2"x4" horizontal support for south form spaced approximately 12" spacing. Top support follows cross slope of road; spacing about 4'. Also observed 26 EA struts holding AB1 at about 11' above footing and just below top support. Laborer cleaning up tie wire at footing interface. 3 EA weepholes placed along AB1 at 51", 64", 56"(east-west). Rebar not complete near east side where diagonal bars. Reminded Garrett to install 3" weephole at 15' centers along top of footing per Std. Spec. 51-1.03E(7) for hydrostatic pressure relief. Crews trying to figure falsework anchors--plans just received. Souza may core after PCC pour?? Observed LBR changing filter bag on downstream dewater discharge pipe. Indicated sample tested by biologist and required changing--occurs approximately weekly. Weephole rebar not complete at this time. Observed 12 EA struts supporting AB2 wall toward channel. Observed 12 EA supports(2-2"x8") holding AB1 rebar legs spaced approximately 8' apart.   2 PSG 4-man crew working on AB2 rebar. Placed 61 EA #9 vertical bars at 6" spacing in 30' section with 17 EA #5 horizontal bars at 12" spacing. Two chair spacer rows holding 24" apart, placed at 4' from top and 11' from top. Not complete rebar tie.   3 On-site meeting with SoCal Gas at 9am to coordinate sleeve installation and schedule work by utility company. Attendees include: Claudia Turner, David Cox, Gino Filippin, Jeff Payne, Will Stoudenmire, Garrett VanFleet, Stuart Souza, Lyle Nemeth. SoCal Gas will have Souza install sleeve and arrange payment between 2 parties. The City agrees to use 10" diameter sleeve; SDR-35 or PVC Schedule 40 acceptable. SoCal Gas requested 1-2 week notice prior to performing work. Souza indicated sleeve should be on-site by 9/16/20. Lyle, City of SLO, indicated the other utilities will be responsible for sleeve and Souza will provide pricing. All parties agreed to have Souza take lead on installation of sleeve for schedule purposes.      MANPOWER LOG 14 Workers  |   112.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Clay Souza-Operator BI 39   1 8.0 8.0       3 Souza Mylan Elder- Apprentice Carpenter BI 39   1 8.0 8.0       4 Souza Steve Helenberg-Carpenter BI 39   1 8.0 8.0       5 Souza Mark Missamore-Carpenter Foreman BI 39   1 8.0 8.0       6 Pacific Steel Group Tyler Hintz- Ironworker BI43   1 8.0 8.0       7 Pacific Steel Group John Hamilton-Foreman ironworker BI 43   1 8.0 8.0         Filippin Engineering Page 1 of 4 Printed on 10/22/2020 at 08:38 AM PDT       MANPOWER LOG 14 Workers  |   112.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   8 Pacific Steel Group James Hintz- Iron Worker BI 43   1 8.0 8.0       9 Pacific Steel Group Kyle Macintosh- Iron worker BI 43   1 8.0 8.0       10 Pacific Steel Group Kieth Matthews- iron worker Foreman BI 43   1 8.0 8.0       11 Souza Dana Missamore-LBR BI 39   1 8.0 8.0       12 Souza Mike Kountche-CARP Apprentice BI 39   1 8.0 8.0       13 Pacific Steel Group Jesus Garcia-Iron Worker BI 43   1 8.0 8.0       14 Pacific Steel Group Prospero Salvedra-Iron Worker BI 43   1 8.0 8.0          14  112.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 Cat 336 excavator No   08:00 AM    Notes:Souza  3 F450 Super Duty No   08:00 AM    Notes:Souza  4 Caterpillar Reachlift No   08:00 AM    Notes:Souza  5 3500 GMC crew truck No   08:00 AM    Notes:Souza  6 Cat 336 Long Reach Excavator No   08:00 AM    Notes:D. Crye  7 Cat 308 Mini Excavator No   08:00 AM    Notes:Souza  8 2500 Gmc Crew cab No   08:00 AM    Notes:Souza    Filippin Engineering Page 2 of 4 Printed on 10/22/2020 at 08:38 AM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   9 305 Cat Mini Excavator No   08:00 AM    Notes:Souza  10 Doosan P185 Air Compressor No   08:00 AM    Notes:Souza  11 2500 GMC flatbed No   08:00 AM    Notes:PSG  12 Big Tex trailer No   08:00 AM    Notes:Souza  13 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza  14 Sciiscor lift United Rentals No   08:00 AM    Notes:Souza        VISITOR LOG     No.Visitor Start Time End Time Details 1 Makayla Hoffman(Padre)07:00 AM 07:30 AM  Performed water quality inspection. Conducted environmental training for new PSG employees. 2 Dominque(Souza)07:00 AM 07:05 AM  Provided as-built drawing information for sanitary sewer system recently installed. 3 Claudia Turner-SoCal Gas 09:00 AM 09:45 AM  Coordination meeting with SoCal Gas and Souza for sleeve installation and schedule work. 4 David Cox-ARB 09:00 AM 09:45 AM  SoCal Gas representative for coordination meeting with Souza.   OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No Smoke Hot 84 None Light Wind        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 59°F 85°F 71°F 0.01 in.0.02 in.0.02 in.35%56%78%54°F 4.9 mph 7 mph 12 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   59°F clear-day   67°F clear-day   82°F partly-cloudy-day   85°F partly-cloudy-day   81°F partly-cloudy-night   74°F   Filippin Engineering Page 3 of 4 Printed on 10/22/2020 at 08:38 AM PDT        By  Date  Copies To     Filippin Engineering Page 4 of 4 Printed on 10/22/2020 at 08:38 AM PDT        Jeff Payne 8/21/2020