Loading...
HomeMy WebLinkAbout2020-08-25Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Tuesday 8/25/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM gearing up to set front panels at abutment #1. Souza installed the 3'' weep holes at the bottom of the abutment 1 before the front panels where placed.   2 PSG on site installed wing wall rebar at both left and right WW at abutment #1. Continued erecting abutment 2 steel.  3 Preformed Daily visual inspection of dewatering and creek area. Spoke with Rosa and Lyle and about the edge of deck line up at the Davitia connection and what the options were. Lyle, Rosa, and myself agreed that keeping the bridge deck independent of the overhang was the right thing to due incase of down the road repairs needed to either structure. Pulling a straight line or steeping in at that location was good with Rosa.   4 Looked at submitted bracing plan from Souza. At first glance seemed ok but was going to dig into further after a field review with the plans.   5 Rescheduled Earthsystems for Friday @ 10:30 per Garrett V. (Souza).  6 Measured up concrete quanitity for abutment 1. came up with 14.7 loads of concrete. 140+/- CY      MANPOWER LOG 11 Workers  |   88.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Mylan Elder- Apprentice Carpenter BI 39   1 8.0 8.0       3 Souza Steve Helenberg-Carpenter BI 39   1 8.0 8.0       4 Souza Mark Missamore-Carpenter Foreman BI 39   1 8.0 8.0       5 Pacific Steel Group Tyler Hintz- Ironworker BI43   1 8.0 8.0       6 Pacific Steel Group John Hamilton-Foreman ironworker BI 43   1 8.0 8.0       7 Pacific Steel Group James Hintz- Iron Worker BI 43   1 8.0 8.0       8 Souza Dana Missamore-LBR BI 39   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:15 PM PDT       MANPOWER LOG 11 Workers  |   88.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   9 Souza Mike Kountche-CARP Apprentice BI 39   1 8.0 8.0       10 Souza Clay Souza-Operator BI 39   1 8.0 8.0       11 Souza Raymond Garcia-Carpenter Apprentice BI 39   1 8.0 8.0          11  88.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 Cat 336 excavator No   08:00 AM    Notes:Souza  3 F450 Super Duty No   08:00 AM    Notes:Souza  4 Caterpillar Reachlift No   08:00 AM    Notes:Souza  5 3500 GMC crew truck No   08:00 AM    Notes:Souza  6 Cat 336 Long Reach Excavator No   08:00 AM    Notes:D. Crye  7 Cat 308 Mini Excavator No   08:00 AM    Notes:Souza  8 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  9 305 Cat Mini Excavator No   08:00 AM    Notes:Souza  10 Doosan P185 Air Compressor No   08:00 AM    Notes:Souza  11 2500 GMC flatbed No   08:00 AM    Notes:PSG  12 Big Tex trailer No   08:00 AM    Notes:Souza  13 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza    Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:15 PM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   14 Sciiscor lift United Rentals No   08:00 AM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 61°F 76°F 66°F 0.01 in.0.01 in.0.02 in.65%83%97%61°F 5.0 mph 9 mph 14 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-night   62°F partly-cloudy-day   66°F clear-day   74°F clear-day   76°F clear-day   69°F partly-cloudy-night   63°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:15 PM PDT        Jerry Missamore 8/25/2020