Loading...
HomeMy WebLinkAbout2020-08-26Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Wednesday 8/26/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM still working on panels at abutment 1. PSG onsite finishing up iron for abutment 2. Bragg Crane is scheduled for Thursday 8/26 to set steel at abutment 2.   2 Spoke with Rosa Griggs (Dokken) about the 1''x4'' exspansion joint at at the top of abutment below construction joint. Because of the Sht 27 mishap the iron is 6'' higher at that point so the question is can we reduce the joint to 2'' +/-.   3 Looked at corner of abutment 1 where it ties into sheet pile wall and possible solutions to keep the sheet pile wall independent of the actual new structure.   4 Went over the Wing Wall Lay out line alignment with Garrett V. (Souza) on the left side of abutment 1 & 2 also expressed how this is curitial due to the fact that there is sidewalk and rail going on top of the wing walls.   5 The decision was made to allow Souza to work late the next couple of days due to CPM schedule.     MANPOWER LOG 11 Workers  |   88.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Mylan Elder- Apprentice Carpenter BI 39   1 8.0 8.0       3 Souza Steve Helenberg-Carpenter BI 39   1 8.0 8.0       4 Souza Mark Missamore-Carpenter Foreman BI 39   1 8.0 8.0       5 Pacific Steel Group Tyler Hintz- Ironworker BI43   1 8.0 8.0       6 Pacific Steel Group John Hamilton-Foreman ironworker BI 43   1 8.0 8.0       7 Pacific Steel Group James Hintz- Iron Worker BI 43   1 8.0 8.0       8 Souza Dana Missamore-LBR BI 39   1 8.0 8.0       9 Souza Mike Kountche-CARP Apprentice BI 39   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:15 PM PDT       MANPOWER LOG 11 Workers  |   88.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   10 Souza Clay Souza-Operator BI 39   1 8.0 8.0       11 Souza Raymond Garcia-Carpenter Apprentice BI 39   1 8.0 8.0          11  88.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 Cat 336 excavator No   08:00 AM    Notes:Souza  3 F450 Super Duty No   08:00 AM    Notes:Souza  4 Caterpillar Reachlift No   08:00 AM    Notes:Souza  5 3500 GMC crew truck No   08:00 AM    Notes:Souza  6 Cat 336 Long Reach Excavator No   08:00 AM    Notes:D. Crye  7 Cat 308 Mini Excavator No   08:00 AM    Notes:Souza  8 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  9 305 Cat Mini Excavator No   08:00 AM    Notes:Souza  10 Doosan P185 Air Compressor No   08:00 AM    Notes:Souza  11 2500 GMC flatbed No   08:00 AM    Notes:PSG  12 Big Tex trailer No   08:00 AM    Notes:Souza  13 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza  14 Sciiscor lift United Rentals No   08:00 AM    Notes:Souza    Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:15 PM PDT      OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 59°F 77°F 66°F 0.00 in.0.01 in.0.02 in.59%80%100%59°F 6.4 mph 10 mph 15 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-night   59°F partly-cloudy-day   63°F clear-day   75°F clear-day   76°F clear-day   72°F clear-night   66°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:15 PM PDT        Jerry Missamore 8/26/2020