354-D S. Fairview Ave.
Goleta, California 93117
P: (805) 845-4602
Project: 194501 - SLO Marsh Street Bridge
Replacement
919 Palm St.
San Luis Obispo, California 93401
P: 8057817200
Daily Log Inspection: Wednesday 9/2/2020
NOTES LOG
No.Comments
1 Souza on site at s7 AM to begin the removal of forms on the front side of Abutment 1.
Souza had long reached excavator moved from the west side of the project to the east side of the project.
Daily visual water quality monitoring was done by FE for the dewatering.
2 Went over payestimate with Raul E. (FE)
3 Looked at NE corner where the solider pile wall connects to the bridge. Appears the first two pile will have to be drilled from the
bottom near the creek diversion.
4 Conversation was had with Steve S. (Souza) about Souza's forthcoming letter regarding the water sampling item of work that
has been in discussion.
5 After the first couple of panels at the north end of abutment 1 we removed it revealed some rock pockets towards the lower
half of the wall. Souza is wetting the wall as the forms come off for the water cure.
6 Meet with Freddy O. (City of SLo) and went over limits of RSP and actual layout at begining and end points at the abutments.
7 Went over limits of RSP with Souza crew. And explained also how City wants to raise up the grade towards the upstream side
to allow for proper flow and keep the upstream pond that exists now.
MANPOWER LOG 6 Workers | 48.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
1 Souza Garrett Vanfleet- Carpenter Foreman
BI 39
1 8.0 8.0
2 Souza Mylan Elder- Apprentice Carpenter
BI 39
1 8.0 8.0
3 Souza Dana Missamore-LBR
BI 39
1 8.0 8.0
4 Souza Mike Kountche-CARP Apprentice
BI 39
1 8.0 8.0
5 Souza Clay Souza-Operator
BI 39
1 8.0 8.0
6 Souza Raymond Garcia-Carpenter Apprentice
BI 39
1 8.0 8.0
6 48.0
Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:16 PM PDT
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 2500 Gmc Crew cab No 08:00 AM
Notes:Souza
2 F450 Super Duty No 08:00 AM
Notes:Souza
3 Caterpillar Reachlift No 08:00 AM
Notes:Souza
4 3500 GMC crew truck No 08:00 AM
Notes:Souza
5 Cat 336 Long Reach
Excavator
No 08:00 AM
Notes:D. Crye
6 2500 Gmc Crew cab No 08:00 AM
Notes:Souza
7 Doosan P185 Air
Compressor
No 08:00 AM
Notes:Souza
8 Big Tex trailer No 08:00 AM
Notes:Souza
9 Rental Man Lift United
Rentals
No 08:00 AM
Notes:Souza
10 966 Cat Loader No 08:40 AM
Notes:Souza
OBSERVED WEATHER CONDITIONS
Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity
No
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
56°F 71°F 63°F 0.01 in.0.02 in.0.03 in.66%78%94%56°F 5.7 mph 9 mph 12 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
partly-cloudy-night
58°F
partly-cloudy-day
58°F
clear-day
70°F
clear-day
70°F
clear-day
69°F
clear-night
62°F
Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:16 PM PDT
By Date Copies To
Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:16 PM PDT
Jerry Missamore 9/2/2020