Loading...
HomeMy WebLinkAbout2020-09-02Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Wednesday 9/2/2020      NOTES LOG   No.Comments   1 Souza on site at s7 AM to begin the removal of forms on the front side of Abutment 1. Souza had long reached excavator moved from the west side of the project to the east side of the project. Daily visual water quality monitoring was done by FE for the dewatering.   2 Went over payestimate with Raul E. (FE)  3 Looked at NE corner where the solider pile wall connects to the bridge. Appears the first two pile will have to be drilled from the bottom near the creek diversion.   4 Conversation was had with Steve S. (Souza) about Souza's forthcoming letter regarding the water sampling item of work that has been in discussion.   5 After the first couple of panels at the north end of abutment 1 we removed it revealed some rock pockets towards the lower half of the wall. Souza is wetting the wall as the forms come off for the water cure.   6 Meet with Freddy O. (City of SLo) and went over limits of RSP and actual layout at begining and end points at the abutments.  7 Went over limits of RSP with Souza crew. And explained also how City wants to raise up the grade towards the upstream side to allow for proper flow and keep the upstream pond that exists now.      MANPOWER LOG 6 Workers  |   48.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Mylan Elder- Apprentice Carpenter BI 39   1 8.0 8.0       3 Souza Dana Missamore-LBR BI 39   1 8.0 8.0       4 Souza Mike Kountche-CARP Apprentice BI 39   1 8.0 8.0       5 Souza Clay Souza-Operator BI 39   1 8.0 8.0       6 Souza Raymond Garcia-Carpenter Apprentice BI 39   1 8.0 8.0          6  48.0      Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:16 PM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 F450 Super Duty No   08:00 AM    Notes:Souza  3 Caterpillar Reachlift No   08:00 AM    Notes:Souza  4 3500 GMC crew truck No   08:00 AM    Notes:Souza  5 Cat 336 Long Reach Excavator No   08:00 AM    Notes:D. Crye  6 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  7 Doosan P185 Air Compressor No   08:00 AM    Notes:Souza  8 Big Tex trailer No   08:00 AM    Notes:Souza  9 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza  10 966 Cat Loader No   08:40 AM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 56°F 71°F 63°F 0.01 in.0.02 in.0.03 in.66%78%94%56°F 5.7 mph 9 mph 12 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-night   58°F partly-cloudy-day   58°F clear-day   70°F clear-day   70°F clear-day   69°F clear-night   62°F   Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:16 PM PDT        By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:16 PM PDT        Jerry Missamore 9/2/2020