Loading...
HomeMy WebLinkAbout2020-09-03Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Thursday 9/3/2020      NOTES LOG   No.Comments   1 Souza on site 7 AM plan for the day is to get the RSP installed at abutment 1 face and left wing wall. Set back forms at abutment 2.   2 Souza brought out 1 new employee that needs the enviromental training. Daily Visual water inspection was completed by FE.  3 Told Souza that Marsh St. is not a truck staging area. Souza was told to have trucks wait else where untill it was time for the truck to come in.   4 Weekly meeting was held to discuss look ahead schedule, bio/environmental, PR operations for the job. Went into to detail on the PCO's for the project. Discussed the differing site claim. CJ counter offered to $23,000 after FE/City offered $17,000. Also discussed was deck finish credit for going from grind and groove to broom finish. Also discussed was the water quality monitoring report.   5 Conversation was had with Garrett V. (Souza) about the top of the water stop at the wing wall/retaining wall connection. Garrett had asked if the top of water stop was to be below grade or at grade. After discussion with Raul E. and Jeff P. (FE) decided to have water stop at grade in the top of wall.   6 Decision was made to pay Souza for the 20 EA water sampling bid item. Souza to bill 13EA for the month of August.  7 Jeff P. Raul E., Jerry M. (FE) and Lyle N. (City of slo) meet to discuss differing site condition response from Condon Johnson. City agrees to pay CJ $23,000 plus Souza markups. Then Pay souza for some of operator and equipment time for the support of CJ.      MANPOWER LOG 9 Workers  |   72.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Mylan Elder- Apprentice Carpenter BI 39   1 8.0 8.0       3 Souza Dana Missamore-LBR BI 39   1 8.0 8.0       4 Souza Mike Kountche-CARP Apprentice BI 39   1 8.0 8.0       5 Souza Clay Souza-Operator BI 55/56   1 8.0 8.0       6 Souza Raymond Garcia-Carpenter Apprentice BI 39   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:16 PM PDT       MANPOWER LOG 9 Workers  |   72.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   7 Souza Tommy Papis-Operator BI 55/56   1 8.0 8.0       8 Souza Edgar Lopez-Cement Mason BI 39,56   1 8.0 8.0       9 Souza Gilbert Sanchez-Cement Mason BI 39   1 8.0 8.0          9  72.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 F450 Super Duty No   08:00 AM    Notes:Souza  3 Caterpillar Reachlift No   08:00 AM    Notes:Souza  4 3500 GMC crew truck No   08:00 AM    Notes:Souza  5 Cat 336 Long Reach Excavator No   08:00 AM    Notes:D. Crye  6 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  7 Doosan P185 Air Compressor No   08:00 AM    Notes:Souza  8 Big Tex trailer No   08:00 AM    Notes:Souza  9 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza  10 966 Cat Loader No   08:40 AM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:16 PM PDT      WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 57°F 78°F 66°F 0.01 in.0.02 in.0.03 in.49%71%96%56°F 6.9 mph 11 mph 15 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   57°F clear-day   63°F clear-day   76°F clear-day   78°F clear-day   75°F clear-night   67°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:16 PM PDT        Jerry Missamore 9/3/2020