Loading...
HomeMy WebLinkAbout2020-09-08Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Tuesday 9/8/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM prepping to set back panels at abutment 2. The water cure burleen will be removed at abutment 1 as well. Garrett V. (Souza) indicated that possible RFI will be forthcomming to eliminate the batter in the retaining wall and just pour it 20'' thick all the way up.   2 Spoke with Garrett V. (Souza) and told him the silt fence at the outlet of the TCDS needs some attention to get stood back up. Appears the road is sliding into the area of the fence.   3 Meet with Lyle N. (City of SLO) and went over abutment 2 right side retaining wall area where the chain link fence comes off and reconnects to the existing fence. 2 options exist to either add the 9'' curb all the way to the bridge or backfill and leave dirt down 1-2'' and leave it alone. Souza already has to repair the part of the park that has been torn out by the excavation.   4 Started list for pay quantities for the Month of September   5 Steve S. (Souza) had conversation about the RSP and Contour grading in front of the soldier pile wall. FE indicated that it appears to work out that elevation 213 would cover the 2' minimum necessary to bury the wall and then work backwards down the slope to achieve proper 1.5:1 on slope for RSP. The bottom would need to be keyed in at 5' min by 2.5' wide.      MANPOWER LOG 7 Workers  |   56.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Mylan Elder- Apprentice Carpenter BI 39   1 8.0 8.0       3 Souza Dana Missamore-LBR BI 39   1 8.0 8.0       4 Souza Mike Kountche-CARP Apprentice BI 39   1 8.0 8.0       5 Souza Clay Souza-Operator BI 55/56   1 8.0 8.0       6 Souza Edgar Lopez-Cement Mason BI 39,56   1 8.0 8.0       7 Souza Tommy Russo-Laborer BI 39   1 8.0 8.0          7  56.0      Filippin Engineering Page 1 of 2 Printed on 10/16/2020 at 12:17 PM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 F450 Super Duty No   08:00 AM    Notes:Souza  3 Caterpillar Reachlift No   08:00 AM    Notes:Souza  4 3500 GMC crew truck No   08:00 AM    Notes:Souza  5 Cat 336 Long Reach Excavator No   08:00 AM    Notes:D. Crye  6 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  7 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza  8 Cat 308 Mini Excavator No   08:00 AM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 59°F 75°F 67°F 0.00 in.0.01 in.0.01 in.56%68%94%56°F 4.0 mph 5 mph 9 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   63°F clear-day   68°F clear-day   72°F clear-day   76°F clear-day   68°F clear-night   61°F     By  Date  Copies To     Filippin Engineering Page 2 of 2 Printed on 10/16/2020 at 12:17 PM PDT        Jerry Missamore 9/8/2020