Loading...
HomeMy WebLinkAbout2020-09-14Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Monday 9/14/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM to continue on the removeing forms at abutment 2. Souza also brought in cement mason to patch the front of abutment 2 and then spray with cure. Golding saw on site to core abutment 1 falsework bracket holes in. 14 -2 1/4'' holes. Once the back panles were removed the holes were patched and then the back sprayed with curing compound.   2 Souza had a case loader delivered for work tomorrow on RSP.  3 Souza worked till 6PM to stay on schedule.  4 Souza removed all the front panels plugged all the snap tie holes and any rock pockets as they went. Souza was achieving a class 1 finish across the whole front face so that in return Souza could spray the front face with a clear cure. At 5 PM the uniform finsh was achieved and the face was sprayed.   5 Souza had 2 loads of 1.5'' rock deliverd from Hanson quarry to start the backfill at back of abutment 2. Also delivered was s1/4 ton rock to finsih up the south end face of abutment 1.      MANPOWER LOG 16 Workers  |   128.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 39   1 8.0 8.0       2 Souza Mylan Elder- Apprentice Carpenter BI 39   1 8.0 8.0       3 Souza Dana Missamore-LBR BI 39   1 8.0 8.0       4 Souza Mike Kountche-CARP Apprentice BI 39   1 8.0 8.0       5 Souza Clay Souza-Operator BI 39   1 8.0 8.0       6 Souza Edgar Lopez-Cement Mason BI 39   1 8.0 8.0       7 Souza Tommy Russo-Laborer BI 39   1 8.0 8.0       8 Souza Christian Valasca-Cement Mason BI 39   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:20 PM PDT       MANPOWER LOG 16 Workers  |   128.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   9 Souza Luis Lemos-Celvallas-Cement Masno BI 39   1 8.0 8.0       10 Souza Sergio Castillio-Cement Mason BI 39   1 8.0 8.0       11 Souza Carlos Pina-Guitereiz-Cement Mason BI39   1 8.0 8.0       12 Souza Jorge Garcia-Cement Mason BI 39   1 8.0 8.0       13 Souza Raymond Garcia-Apperentice Carpenter BI 39   1 8.0 8.0       14 Golding Saw Steve Golding-Owner Operator BI 40   1 8.0 8.0       15 Golding Saw Cody Golding-Owner Operator BI 40   1 8.0 8.0       16 Souza Jose Castillo-Cement Mason BI 39   1 8.0 8.0          16  128.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 F450 Super Duty No   08:00 AM    Notes:Souza  3 Caterpillar Reachlift No   08:00 AM    Notes:Souza  4 3500 GMC crew truck No   08:00 AM    Notes:Souza  5 Cat 336 Long Reach Excavator No   08:00 AM    Notes:D. Crye  6 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  7 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza    Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:20 PM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   8 Cat 308 Mini Excavator No   08:00 AM    Notes:Souza  9 Concrete Boom Pump No   08:55 PM    Notes:Myers Drilling  10 Man LIft United rentals No   08:55 AM    Notes:Souza   11 Ram 5500 saw cutting truck No   08:55 AM    Notes:Golding Saw  12 Ram 5500 saw cutting truck No   08:55 AM    Notes:Golding Saw    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 53°F 75°F 62°F 0.00 in.0.01 in.0.02 in.48%68%90%51°F 4.2 mph 7 mph 11 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-night   53°F partly-cloudy-day   59°F clear-day   70°F clear-day   75°F clear-day   68°F clear-night   61°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:20 PM PDT        Jerry Missamore 9/14/2020