Loading...
HomeMy WebLinkAbout2020-09-18Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Friday 9/18/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM to finish work at bent cap "B". Will S. (Souza) held a fall protection meeting ahead of Mondays work of flying in stringers to set for the soffit. A bulletin was posted on the site poster board of who was allowed in the controled zone during that operation of work.   2 Souza was also going to do a general clean up as well as go around and make sure all traffic control devices were in place properly. Told Garrett V. (Souza) that all curing compound and bags of concrete needed to be in a containment of some sort or in pickup trucks.   3 Souza tore out concrete wall at Maino property for soilder pile wall installation. Godling saw cutting cut the wall. Saw cut was preformed 20'' left of pile #6. Golding Ticket #033688 Cole Farms ticket # 49602 (trucking for concrete haul off)   4 Souza laid out for stringers on the left side of "M" Line.  5 Souza was going to wet down the site for dust control.  6 Dwight Peterson delivered a trailer load of beams for the stringers on the false work. Peterson also hauled off Souza's 336 excavator.      MANPOWER LOG 9 Workers  |   72.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 40   1 8.0 8.0       2 Souza Mylan Elder- Apprentice Carpenter BI 40   1 8.0 8.0       3 Souza Dana Missamore-LBR BI 40   1 8.0 8.0       4 Souza Mike Kountche-CARP Apprentice BI 40   1 8.0 8.0       5 Souza Clay Souza-Operator BI 40   1 8.0 8.0       6 Souza Tommy Russo-Laborer BI 40   1 8.0 8.0       7 Souza Raymond Garcia-Apperentice Carpenter BI 40   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:21 PM PDT       MANPOWER LOG 9 Workers  |   72.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   8 Souza Mark Missamore-Carpenter Foreman BI 40   1 8.0 8.0       9 Souza Steve Hillenberg-Carpenter BI 40   1 8.0 8.0          9  72.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 F450 Super Duty No   08:00 AM    Notes:Souza  3 Caterpillar Reachlift No   08:00 AM    Notes:Souza  4 3500 GMC crew truck No   08:00 AM    Notes:Souza  5 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  6 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza  7 Cat 308 Mini Excavator No   08:00 AM    Notes:Souza  8 United Rentals Case Loader No   08:50 AM    Notes:Souza   9 No   08:55 PM    Notes:Souza  10 Cat 336 excavator No   08:25 AM    Notes:Souza        VISITOR LOG     No.Visitor Start Time End Time Details 1 Will Stoudenmire (Souza)07:30 AM 07:30 AM  fall protection saftey meeting   OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity     Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:21 PM PDT      OBSERVED WEATHER CONDITIONS No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 62°F 79°F 69°F 0.01 in.0.03 in.0.03 in.48%66%81%57°F 6.4 mph 12 mph 18 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-night   64°F clear-day   69°F clear-day   79°F clear-day   78°F clear-day   71°F clear-night   65°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:21 PM PDT        Jerry Missamore 9/18/2020