HomeMy WebLinkAbout2020-09-21Filippin Engineering
354-D S. Fairview Ave.
Goleta, California 93117
P: (805) 845-4602
Project: 194501 - SLO Marsh Street Bridge
Replacement
919 Palm St.
San Luis Obispo, California 93401
P: 8057817200
Daily Log Inspection: Monday 9/21/2020
NOTES LOG
No.Comments
1 Souza on site at 7 AM and ready to set stingers for the false work. Bragg Crane brought in 100 TN crane and support tractor
truck hauling cunter weights. Dwight Peterson trucking hauled 3 loads of W 14x120 beams for the stingers.
2 Margarita Welding came in to clean up the bottom of one beam before it was set.
3 Vibration Montioring system was reinstalled at Stallworks building. Awaiting a gate combo for the Davita side to gain access for
reinstallation on that side.
4 Peterson trucking delivered a ttotal of 5 loads to the site of false work beams.
5 As of 3 PM camber strips had not arrived to job site and Souza was going to leave at 3:30 and start again tomorrow when they
had all their pieces.
MANPOWER LOG 12 Workers | 96.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
1 Souza Garrett Vanfleet- Carpenter Foreman
BI 40
1 8.0 8.0
2 Souza Mylan Elder- Apprentice Carpenter
BI 40
1 8.0 8.0
3 Souza Dana Missamore-LBR
BI 40
1 8.0 8.0
4 Souza Mike Kountche-CARP Apprentice
BI 40
1 8.0 8.0
5 Souza Clay Souza-Operator
BI 40
1 8.0 8.0
6 Souza Tommy Russo-Laborer
BI 40
1 8.0 8.0
7 Souza Raymond Garcia-Apperentice Carpenter
BI 40
1 8.0 8.0
8 Souza Mark Missamore-Carpenter Foreman
BI 40
1 8.0 8.0
9 Souza Steve Hillenberg-Carpenter
BI 40
1 8.0 8.0
Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:22 PM PDT
MANPOWER LOG 12 Workers | 96.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
10 Bragg Crane Scott Ferguson- Operator
BI 40
1 8.0 8.0
11 Bragg Crane Cody Ferguson- Operator
BI 40
1 8.0 8.0
12 Margarita
Fabrication
Kyle Peterson-Owner/Operator
BI 40
1 8.0 8.0
12 96.0
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 2500 Gmc Crew cab No 08:00 AM
Notes:Souza
2 F450 Super Duty No 08:00 AM
Notes:Souza
3 Caterpillar Reachlift No 08:00 AM
Notes:Souza
4 3500 GMC crew truck No 08:00 AM
Notes:Souza
5 2500 Gmc Crew cab No 08:00 AM
Notes:Souza
6 Rental Man Lift United
Rentals
No 08:00 AM
Notes:Souza
7 Cat 308 Mini Excavator No 08:00 AM
Notes:Souza
8 United Rentals Case
Loader
No 08:50 AM
Notes:Souza
9 Cat 336 excavator No 08:25 AM
Notes:Souza
10 100 TN Crane No 08:15 AM
Notes:Bragg Crane
11 Innternational truck and
trailer
No 08:15 AM
Notes:Bragg Cran
12 Ram 4500 UTility Truck No 08:15 AM
Notes:Margaritia Fabrication
Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:22 PM PDT
VISITOR LOG
No.Visitor Start Time End Time Details
1 Cesar(Behrens and Associates,
Inc.)
01:30 PM 01:30 PM Installed vibration monitoring equipment
OBSERVED WEATHER CONDITIONS
Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity
No
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
54°F 74°F 62°F 0.00 in.0.01 in.0.01 in.54%73%85%54°F 3.7 mph 7 mph 11 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
clear-night
56°F
partly-cloudy-day
58°F
clear-day
72°F
clear-day
73°F
clear-day
69°F
clear-night
61°F
By Date Copies To
Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:22 PM PDT
Jerry Missamore 9/21/2020