Loading...
HomeMy WebLinkAbout2020-09-22Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Tuesday 9/22/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM to install camber strip and also start rolling out the soffit. Myers Drilling began mobing in the drilling equipment. Drill rig was dropped off first then Myers was going back to get the crane to lift the beams.   2 Margarita Fabrication was onsite at 8:30 to weld the split cap beams together.  3 Went over deck curing compound needed for the deck with Garrett V. (Souza)  4 Read into the 2015 Caltrans Standards and job site specials to look into the payment of the wattles that need to be intalled at the end of temp creek diversion system to restore the bank and creek channel the way it was.   5 Looked over pricing for CIP wall instead of lag wall due to DBE issues      MANPOWER LOG 8 Workers  |   58.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 40   1 8.0 8.0       2 Souza Mylan Elder- Apprentice Carpenter BI 40   1 8.0 8.0       3 Souza Dana Missamore-LBR BI 40   1 8.0 8.0       4 Souza Clay Souza-Operator BI 40   1 8.0 8.0       5 Souza Raymond Garcia-Apperentice Carpenter BI 40   1 8.0 8.0       6 Souza Steve Hillenberg-Carpenter BI 40   1 8.0 8.0       7 Souza Ty Souza-laborer BI 40   1 8.0 8.0       8 Margarita Fabrication Kyle Peterson-Owner/Operator BI 40   1 2.0 2.0          8  58.0      Filippin Engineering Page 1 of 2 Printed on 10/16/2020 at 12:22 PM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 F450 Super Duty No   08:00 AM    Notes:Souza  3 Caterpillar Reachlift No   08:00 AM    Notes:Souza  4 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza  5 Cat 308 Mini Excavator No   08:00 AM    Notes:Souza  6 Ram 4500 UTility Truck No   08:15 AM    Notes:Margaritia Fabrication    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 53°F 75°F 64°F 0.00 in.0.00 in.0.01 in.50%67%86%52°F 4.4 mph 7 mph 12 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-night   53°F partly-cloudy-day   58°F clear-day   73°F clear-day   75°F clear-day   71°F clear-night   65°F     By  Date  Copies To     Filippin Engineering Page 2 of 2 Printed on 10/16/2020 at 12:22 PM PDT        Jerry Missamore 9/22/2020