Daily Log Inspection: Thursday 9/24/2020
NOTES LOG
No.Comments
1 Souza on site at 7 AM to continue on Soldier Pile wall and edge of deck on the left side of "M" Line.
2 Myers drill rig was down for the first part of the morning. Hopeing to get 2 piles poured today and top off pile #1 so that Souza
is able to pour abutment 2 wing wall left.
3 PSG on site to start on the deck steel. Problem occured with the #10 deck bars that hook on the back side of the #9 12'X8'
bars. PSG was going to dry run one bar and see what it looks like on the field.
4 Souza and Myers poured Piles 2,4 and top off 1. 12.5 CY ordered from Calportland. Pile number 2 took a little more than
theoretical of 3 CYs due to the fact the top 3' of the hole ended up being about 36'' round rather than 30''.
5 Weekly meeting was held to discuss look ahead schedule, Bio/Enviromental issues and PR issues. Souza, City and FE staff in
attendance.
6 Meeting was held to discuss the operations of the deck pour with FE staff, Garrett V. (Souza) and Manny G. (City of SLO).
Topics included truck spacing, mix design, finish of the deck and also curing of the deck.
MANPOWER LOG 15 Workers | 120.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
1 Souza Garrett Vanfleet- Carpenter Foreman
BI 40
1 8.0 8.0
2 Souza Mylan Elder- Apprentice Carpenter
BI 40
1 8.0 8.0
3 Souza Dana Missamore-LBR
BI 40
1 8.0 8.0
4 Souza Clay Souza-Operator
BI 40
1 8.0 8.0
5 Souza Raymond Garcia-Apperentice Carpenter
BI 40
1 8.0 8.0
6 Souza Steve Hillenberg-Carpenter
BI 40
1 8.0 8.0
7 Souza Mike Kountche-CARP Apprentice
BI 40
1 8.0 8.0
8 Souza Tommy Russo-Laborer
BI 40
1 8.0 8.0
Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:22 PM PDT
MANPOWER LOG 15 Workers | 120.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
9 Myers Driling David Emornson-Operator
BI 35
1 8.0 8.0
10 Myers Driling Mike Myers-Owner/Operator
BI 35
1 8.0 8.0
11 Myers Driling Chuck-Concrete Boom Pump Operator
BI 35
1 8.0 8.0
12 Pacific Steel Group John Hamilton-Foreman ironworker
BI 43
1 8.0 8.0
13 Pacific Steel Group Dave Perallas-Ironworker
BI 43
1 8.0 8.0
14 Pacific Steel Group Marlo Magana-Ironeorker
BI 43
1 8.0 8.0
15 Pacific Steel Group Adrian Wildman-Ironworker
BI 43
1 8.0 8.0
15 120.0
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 2500 Gmc Crew cab No 08:00 AM
Notes:Souza
2 F450 Super Duty No 08:00 AM
Notes:Souza
3 Caterpillar Reachlift No 08:00 AM
Notes:Souza
4 Rental Man Lift United
Rentals
No 08:00 AM
Notes:Souza
5 Cat 308 Mini Excavator No 08:00 AM
Notes:Souza
6 excavtor Drill Rig No 08:40 AM
Notes:Myers Drilling
7 30 Ton Crane No 08:40 AM
Notes:Myers Drilling
8 F250 Pickuup No 08:40 AM
Notes:Myers drilling
Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:22 PM PDT
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
9 Concrete Boom Pump No 08:30 PM
Notes:Myers Drilling
10 2500 GMC flatbed No 08:30 PM
Notes:PSG
OBSERVED WEATHER CONDITIONS
Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity
No
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
61°F 87°F 73°F 0.00 in.0.00 in.0.00 in.31%55%77%55°F 7.8 mph 10 mph 20 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
clear-night
70°F
clear-day
69°F
clear-day
88°F
clear-day
85°F
clear-day
79°F
clear-night
74°F
By Date Copies To
Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:22 PM PDT
Jerry Missamore 9/24/2020