HomeMy WebLinkAbout2020-09-25Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Friday 9/25/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM doing structure ex on the soilderpile wall. Souza had 336 excavator moved in to dig. Myers on site to drill last 2 30'' holes for soldier pile wall. PSG on site to continue on the deck steel. Golding saw on site to cut the joint at the top of abutment for expansion paper for siesmeic reasons.   2 PSG laid out the deck steel wrong on the bottom mat of rebar forcing PSG to go back and untie all the bars and move them over 1.5''.   3 Earthsysytems on site at 2 PM to take cylinders on dry hole mix 590RM3010. Souza and Myers to pour piles # 5 & 6. Souza also set up the sono tube on piles 2 and 3 to finish pouring them to the bottom of the lag wall.   4 Earthsystems took a 2-7 Day 2- 28 Day and hold cylinder for mix design 590RM3010 a total of 16.5 CY ordered from Calportland and a total of 15.5CY used on site to fill up piles 5 &6 and then top off piles 2 & 3   5 John H. (PSG) went over some of the odd tails that weren't bent correctley on the #10 bars on the bottom deck matt and we came up with a solution to slightly adujust them left station to help tie in the tails to the back cage of the abutment rebar.   6 Extra work was preformed by Souza to excavate dirt outside of the structure ex prism on the solider pile wall. Agreed to with Souza 3 loads of haul off with 1 hour of operator time and machine time.      MANPOWER LOG 18 Workers  |   144.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 40/35/23/43   1 8.0 8.0       2 Souza Mylan Elder- Apprentice Carpenter BI 40/35   1 8.0 8.0       3 Souza Dana Missamore-LBR BI 35/23   1 8.0 8.0       4 Souza Clay Souza-Operator BI 35/23   1 8.0 8.0       5 Souza Raymond Garcia-Apperentice Carpenter BI 40   1 8.0 8.0       6 Souza Steve Hillenberg-Carpenter BI 40/35   1 8.0 8.0       7 Souza Mike Kountche-CARP Apprentice BI 40/35   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 10/16/2020 at 12:22 PM PDT       MANPOWER LOG 18 Workers  |   144.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   8 Souza Tommy Russo-Laborer BI 40   1 8.0 8.0       9 Myers Driling David Emornson-Operator BI 35   1 8.0 8.0       10 Myers Driling Mike Myers-Owner/Operator BI 35   1 8.0 8.0       11 Myers Driling Chuck Reynoldo-Concrete Boom Pump Operator BI 35   1 8.0 8.0       12 Pacific Steel Group John Hamilton-Foreman ironworker BI 43   1 8.0 8.0       13 Pacific Steel Group Marlo Magana-Ironworke BI 43   1 8.0 8.0       14 Pacific Steel Group Cruz Agustine-Ironworker BI 43   1 8.0 8.0       15 Pacific Steel Group Edwin Griffits-Ironworker BI 43   1 8.0 8.0       16 Pacific Steel Group Jamie Maldonado-Ironworker BI 43   1 8.0 8.0       17 Pacific Steel Group Dave Perallas-Ironworker Bi 43   1 8.0 8.0       18 Golding Saw Cody Golding-Laborer BI 40   1 8.0 8.0          18  144.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 F450 Super Duty No   08:00 AM    Notes:Souza  3 Caterpillar Reachlift No   08:00 AM    Notes:Souza    Filippin Engineering Page 2 of 3 Printed on 10/16/2020 at 12:22 PM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza  5 Cat 308 Mini Excavator No   08:00 AM    Notes:Souza  6 Ram 4500 UTility Truck No   08:15 AM    Notes:Margaritia Fabrication  7 excavtor Drill Rig No   08:40 AM    Notes:Myers Drilling  8 30 Ton Crane No   08:40 AM    Notes:Myers Drilling  9 F250 Pickuup No   08:40 AM    Notes:Myers drilling  10 Concrete Boom Pump No   08:30 PM    Notes:Myers Drilling  11 2500 GMC flatbed No   08:30 PM    Notes:PSG        VISITOR LOG     No.Visitor Start Time End Time Details 1 Jose (Earthsystems)01:40 PM 01:40 PM  Take cylinders for soldier pile wall   OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 59°F 77°F 68°F 0.00 in.0.00 in.0.00 in.47%65%84%55°F 6.8 mph 9 mph 17 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   60°F clear-day   65°F clear-day   76°F clear-day   77°F clear-day   73°F clear-night   67°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/16/2020 at 12:22 PM PDT        Jerry Missamore 9/25/2020