Loading...
HomeMy WebLinkAbout2020-09-26Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Saturday 9/26/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM to continue work on the bridge deck and work on putting in the future utility casings. PSG onsite to continue on the deck steel.   2 Slight issue with the edge U bars at abutment 1. Becasue of the height issue with the abutment cages from the contour grading sheet the U bars had to be adjusted a bit and the last 12 on the right side side had to be cut and spliced due to the abutment cage being too tall.      MANPOWER LOG 15 Workers  |   120.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI 40   1 8.0 8.0       2 Souza Mylan Elder- Apprentice Carpenter BI 40   1 8.0 8.0       3 Souza Clay Souza-Operator BI 35/23   1 8.0 8.0       4 Souza Raymond Garcia-Apperentice Carpenter BI 40   1 8.0 8.0       5 Souza Steve Hillenberg-Carpenter BI 40   1 8.0 8.0       6 Souza Mike Kountche-CARP Apprentice BI 40   1 8.0 8.0       7 Pacific Steel Group John Hamilton-Foreman ironworker BI 43   1 8.0 8.0       8 Pacific Steel Group Dave Perallas-Ironworker Bi 43   1 8.0 8.0       9 Pacific Steel Group Adan Molina-Iroworker BI 43   1 8.0 8.0       10 Pacific Steel Group Jesus Barron-Ironworker Foreman BI 43   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 10/22/2020 at 08:39 AM PDT       MANPOWER LOG 15 Workers  |   120.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   11 Pacific Steel Group Prospere Saauedua- Ironworker BI 43   1 8.0 8.0       12 Pacific Steel Group Alberto Villasenor-Ironworker BI 43   1 8.0 8.0       13 Pacific Steel Group Addran Cardenas-Iroworker BI 43   1 8.0 8.0       14 Pacific Steel Group Roqael Santamaria_Ironworker BI 43   1 8.0 8.0       15 Pacific Steel Group Federico Durate-Ironworker BI 43   1 8.0 8.0          15  120.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 F450 Super Duty No   08:00 AM    Notes:Souza  3 Caterpillar Reachlift No   08:00 AM    Notes:Souza  4 Rental Man Lift United Rentals No   08:00 AM    Notes:Souza  5 Cat 308 Mini Excavator No   08:00 AM    Notes:Souza  6 Ram 4500 UTility Truck No   08:15 AM    Notes:Margaritia Fabrication  7 excavtor Drill Rig No   08:40 AM    Notes:Myers Drilling  8 30 Ton Crane No   08:40 AM    Notes:Myers Drilling  9 F250 Pickuup No   08:40 AM    Notes:Myers drilling  10 Concrete Boom Pump No   08:30 PM    Notes:Myers Drilling  11 2500 GMC flatbed No   08:30 PM    Notes:PSG    Filippin Engineering Page 2 of 3 Printed on 10/22/2020 at 08:39 AM PDT      OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 59°F 86°F 72°F 0.00 in.0.00 in.0.00 in.38%59%81%56°F 7.2 mph 9 mph 15 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   66°F clear-day   67°F clear-day   83°F clear-day   86°F clear-day   81°F clear-night   73°F     By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 10/22/2020 at 08:39 AM PDT        Jerry Missamore 9/26/2020