HomeMy WebLinkAbout2020-09-26Filippin Engineering
354-D S. Fairview Ave.
Goleta, California 93117
P: (805) 845-4602
Project: 194501 - SLO Marsh Street Bridge
Replacement
919 Palm St.
San Luis Obispo, California 93401
P: 8057817200
Daily Log Inspection: Saturday 9/26/2020
NOTES LOG
No.Comments
1 Souza on site at 7 AM to continue work on the bridge deck and work on putting in the future utility casings.
PSG onsite to continue on the deck steel.
2 Slight issue with the edge U bars at abutment 1. Becasue of the height issue with the abutment cages from the contour
grading sheet the U bars had to be adjusted a bit and the last 12 on the right side side had to be cut and spliced due to the
abutment cage being too tall.
MANPOWER LOG 15 Workers | 120.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
1 Souza Garrett Vanfleet- Carpenter Foreman
BI 40
1 8.0 8.0
2 Souza Mylan Elder- Apprentice Carpenter
BI 40
1 8.0 8.0
3 Souza Clay Souza-Operator
BI 35/23
1 8.0 8.0
4 Souza Raymond Garcia-Apperentice Carpenter
BI 40
1 8.0 8.0
5 Souza Steve Hillenberg-Carpenter
BI 40
1 8.0 8.0
6 Souza Mike Kountche-CARP Apprentice
BI 40
1 8.0 8.0
7 Pacific Steel Group John Hamilton-Foreman ironworker
BI 43
1 8.0 8.0
8 Pacific Steel Group Dave Perallas-Ironworker
Bi 43
1 8.0 8.0
9 Pacific Steel Group Adan Molina-Iroworker
BI 43
1 8.0 8.0
10 Pacific Steel Group Jesus Barron-Ironworker Foreman
BI 43
1 8.0 8.0
Filippin Engineering Page 1 of 3 Printed on 10/22/2020 at 08:39 AM PDT
MANPOWER LOG 15 Workers | 120.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
11 Pacific Steel Group Prospere Saauedua- Ironworker
BI 43
1 8.0 8.0
12 Pacific Steel Group Alberto Villasenor-Ironworker
BI 43
1 8.0 8.0
13 Pacific Steel Group Addran Cardenas-Iroworker
BI 43
1 8.0 8.0
14 Pacific Steel Group Roqael Santamaria_Ironworker
BI 43
1 8.0 8.0
15 Pacific Steel Group Federico Durate-Ironworker
BI 43
1 8.0 8.0
15 120.0
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 2500 Gmc Crew cab No 08:00 AM
Notes:Souza
2 F450 Super Duty No 08:00 AM
Notes:Souza
3 Caterpillar Reachlift No 08:00 AM
Notes:Souza
4 Rental Man Lift United
Rentals
No 08:00 AM
Notes:Souza
5 Cat 308 Mini Excavator No 08:00 AM
Notes:Souza
6 Ram 4500 UTility Truck No 08:15 AM
Notes:Margaritia Fabrication
7 excavtor Drill Rig No 08:40 AM
Notes:Myers Drilling
8 30 Ton Crane No 08:40 AM
Notes:Myers Drilling
9 F250 Pickuup No 08:40 AM
Notes:Myers drilling
10 Concrete Boom Pump No 08:30 PM
Notes:Myers Drilling
11 2500 GMC flatbed No 08:30 PM
Notes:PSG
Filippin Engineering Page 2 of 3 Printed on 10/22/2020 at 08:39 AM PDT
OBSERVED WEATHER CONDITIONS
Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity
No
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
59°F 86°F 72°F 0.00 in.0.00 in.0.00 in.38%59%81%56°F 7.2 mph 9 mph 15 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
clear-night
66°F
clear-day
67°F
clear-day
83°F
clear-day
86°F
clear-day
81°F
clear-night
73°F
By Date Copies To
Filippin Engineering Page 3 of 3 Printed on 10/22/2020 at 08:39 AM PDT
Jerry Missamore 9/26/2020