Loading...
HomeMy WebLinkAbout2020-10-26Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Monday 10/26/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM. Loading TCDS 36'' HDPE pipes on to Peterson Trucking to haul off of site. Souza going to continue on structure backfill at abutment 2 and also begin working on the soldier pile wall barrier slab. Touch up paint on the soldier pile beams was being applied.   2 Souza made two rounds of strucutre backfill material from Prado Rd yard and then switched to Hanson DG due to lack of material in Prado Rd. Yard. 3 semi end dumps running and trying to add on a couple more trucks due to the haul time.   3 Coversation was had with Steve S. to hold down the strucutre backfill 1' from top of bridge to allow for 4'' AC over 8'' concrete. Souza also asked if DG was ok under the sidewalk off the bridge.   4 Planted Sycamore trees on access road area of the slope with Freddy O. (City of SLO)  5 Earthsystems (Jose) was on site at 12:15 to due a compaction test on abutment 2 backside at approx elevation 218+/-. Set up earthsystem to be back onsite tomorrow for the final 3' at 10 AM.      MANPOWER LOG 8 Workers  |   60.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI14-8hrs   1 8.0 8.0       2 Souza Dana Missamore-LBR BI24-8hrs   1 8.0 8.0       3 Souza Clay Souza-Operator BI 24-8hrs   1 8.0 8.0       4 Souza Mylan Elder-Apprentice Carpenter BI24-8hrs   1 8.0 8.0       5 Souza Mike Keuntje - Carpenter BI24 Clean up site   1 8.0 8.0       6 Souza Larry Wompler-Operator BI 24   1 8.0 8.0       7 Souza Blaze Twissleman-Laborer BI 14/24   1 4.0 4.0       8 Souza Guy Branch-Teamster BI 24   1 8.0 8.0         Filippin Engineering Page 1 of 2 Printed on 11/3/2020 at 01:43 PM PST       MANPOWER LOG 8 Workers  |   60.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location      8  60.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 F450 Super Duty No   08:00 AM    Notes:Souza  3 Cat 308 Mini Excavator No   08:00 AM    Notes:Souza  4 Cat 336 excavator No   08:20 AM    Notes:Souza   5 CAT Telescope Fork Lift No   08:35 AM    Notes:Souza  6 Cat 966 loader No   08:05 AM    Notes:Souza  7 Kenworth H2O truck No   08:45 PM    Notes:Souza  8 C34 cat compactor 6.0 2.0 No   08:23 PM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 72°F 60°F 0.00 in.0.02 in.0.03 in.25%53%94%40°F 6.4 mph 9 mph 16 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   51°F clear-day   56°F clear-day   69°F clear-day   71°F clear-day   65°F clear-night   61°F     By  Date  Copies To     Filippin Engineering Page 2 of 2 Printed on 11/3/2020 at 01:43 PM PST        Jerry Missamore 10/26/2020