Loading...
HomeMy WebLinkAbout2020-10-30Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Friday 10/30/2020      NOTES LOG   No.Comments   1 Souza on site at 7 AM to continue structure backfill on abutment 1 side. Begin to set up Barrier slab in Maino parking lot.   2 Weekly meeting was held to discuss schedule and PR issues.  3 Digital west was on site and had a discussion about the timing on their work and also what conduits to use and were to install boxes in the city sidewalk. Jonathan Rabbon was the coordinator for Digital West. MGM is the contractor to preform the work for Digital West.   4 Davita sent a message and was concerend about the vibration in the building but according the monitoring system all vibration was under the threshholds for the project.   5 Went over pay quanitities with Will S. (Souza) for the October monthly pay estimate.     MANPOWER LOG 9 Workers  |   73.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman BI24 General site clean up   1 9.0 9.0       2 Souza Dana Missamore-LBR BI24 Traffic control   1 8.0 8.0       3 Souza Clay Souza-Operator BI 24-8hrs   1 8.0 8.0       4 Souza Mylan Elder-Apprentice Carpenter BI 41   1 9.0 9.0       5 Souza Mike Keuntje - Carpenter BI41   1 8.0 8.0       6 Souza Larry Wompler-Operator BI 24   1 8.0 8.0       7 Souza Guy Branch-Teamster BI 24   1 8.0 8.0       8 Souza Carlos Pina- Cement Mason BI 24   1 8.0 8.0         Filippin Engineering Page 1 of 3 Printed on 11/4/2020 at 09:07 AM PST       MANPOWER LOG 9 Workers  |   73.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   9 Souza Roman Reyes-Cement Mason BI 24   1 7.0 7.0          9  73.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 Gmc Crew cab No   08:00 AM    Notes:Souza  2 F450 Super Duty No   08:00 AM    Notes:Souza  3 Cat 336 excavator No   08:20 AM    Notes:Souza   4 CAT Telescope Fork Lift No   08:35 AM    Notes:Souza  5 Kenworth H2O truck No   08:45 PM    Notes:Souza  6 C34 cat compactor 6.0 2.0 No   08:23 PM    Notes:Souza  7 Cat 305 Mini Excavator No   08:00 AM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 48°F 79°F 61°F 0.00 in.0.01 in.0.01 in.37%54%67%44°F 4.8 mph 7 mph 9 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-night   49°F clear-day   53°F clear-day   68°F clear-day   79°F clear-day   67°F clear-night   63°F   Filippin Engineering Page 2 of 3 Printed on 11/4/2020 at 09:07 AM PST        By  Date  Copies To     Filippin Engineering Page 3 of 3 Printed on 11/4/2020 at 09:07 AM PST        Jerry Missamore 10/30/2020