Loading...
HomeMy WebLinkAbout04-28-2021 PC Agenda PacketCity of San Luis Obispo, Agenda, Planning Co mmission Agenda PLANNING COMMISSION Wednesday, April 28, 2021 6:00 PM REGULAR MEETING TELECONFERENCE Broadcasted via Webinar Based on the threat of COVID-19 as reflected in the Proclamations of Emergency issued by both the Governor of the State of California, the San Luis Obispo County Emergency Services Director and the City Council of the City of San Luis Obispo as well as the Governor’s Executive Order N-29-20 issued on March 17, 2020, relating to the convening of public meetings in response to the COVID-19 pandemic, the City of San Luis Obispo will be holding all public meetings via teleconference. There will be no physical location for the Public to view the meeting. Below are instructions on how to view the meeting remotely and how to leave public comment. Additionally, members of the Planning Commission (PC) are allowed to attend the meeting via teleconference and participate in the meeting to the same extent as if they were present. Using the most rapid means of communication available at this time, members of the public are encouraged to participate in PC meetings in the following ways: 1. Remote Viewing - Members of the public who wish to watch the meeting can view: • Televised live on Charter Cable Channel 20 • View a livestream of the meeting on the City’s YouTube channel: http://youtube.slo.city • View the Webinar (recommended for the best viewing quality): ➢ URL: https://slocity-org.zoom.us/j/99748967244?pwd=d1B0TStkSVFFWXdaaGVobkhjUjZ1UT09 ➢ Telephone Attendee: +1 (669) 900-6833 ➢ Webinar ID: 997 4896 7244; Passcode: 970709 Note: The City utilizes Zoom Webinar for remote meetings. All attendees will enter the meeting muted. An Attendee tutorial is available on YouTube; please test your audio settings. 2. Public Comment - The PC will still be accepting public comment for items within their purview. Public comment can be submitted in the following ways: • Mail or Email Public Comment ➢ Received by 3:00 PM on the day of meeting - Can be submitted via email to advisorybodies@slocity.org or U.S. Mail to City Clerk at: 990 Palm St. San Luis Obispo, CA 93401 ➢ Emails sent after 3:00 PM – Can be submitted via email to advisorybodies@slocity.org and will be archived/distributed to members of the Advisory Body the day after the meeting. Emails will not be read aloud during the meeting. • Verbal Public Comment ➢ Received by 3:00 PM on the day of the meeting - Call (805) 781-7164; state and spell your name, the agenda item number and leave your comment. The verbal comments must be limited to 3 minutes. All voicemails will be forwarded to Advisory Body Members and saved as Agenda Correspondence. Voicemails will not be played during the meeting. ➢ During the meeting – Join the webinar (instructions above). Once public comment for the item you would like to speak on is called, please raise your virtual hand, your name will be called, and your microphone will be unmuted. If you have questions, contact the office of the City Clerk at cityclerk@slocity.org or (805) 781-7100. Planning Commission Agenda for April 28, 2021 Page 2 CALL TO ORDER: Chair Hemalata Dandekar ROLL CALL : Commissioners Michael Hopkins, Steve Kahn, Nicholas Quincey, Michelle Shoresman, Mike Wulkan, Vice-Chair Robert Jorgensen, and Chair Hemalata Dandekar CONSIDERATION OF MINUTES 1. Minutes of the Planning Commission meeting of April 14, 2021. PUBLIC COMMENT At this time, people may address the Commission about items not on the agenda. Comments are limited to three minutes per person. Items raised at this time are generally referred to staff and, if action by the Commission is necessary, may be scheduled for a future meeting. CONSENT ITEM Matters appearing on the Consent Calendar are expected to be non-controversial and will be acted upon at one time. A member of the public may request the Planning Commission to pull an item for discussion. The public may comment on any and all items on the Consent Agenda within the three-minute time limit. 2. Review of General Plan Conformity Report, Capital Improvement Program proposed as part of 2021-23 Financial Plan; Project Address: Citywide. Case #: GENP-0281-2021; City of San Luis Obispo – Public Works Department, applicant. Recommendation: Forward a recommendation to the City Council that all projects/purchases in the Capital Improvement Plan, proposed as part of the 2021-2023 Financial Plan, comply with the City's General Plan. COMMENT AND DISCUSSION 3. Staff Updates & Agenda Forecast Planning Commission Agenda for April 28, 2021 Page 3 ADJOURNMENT The next Regular Meeting of the Planning Commission meeting is scheduled for Wednesday, May 1 2, 2021, at 6:00 p.m., via teleconference. APPEALS Any decision of the Planning Commission is final unless appealed to City Council within 10 days of the action (Recommendations to City Council cannot be appealed since they are not a final action). Any person aggrieved by a decision of the Commission may file an appeal with the City Clerk. Appeal forms are available at the Community Development Department office, City Clerk’s office, or on the City’s website (www.slocity.org). The appropriate appeal fee must accompany the appeal documentation. LISTENING ASSISTIVE DEVICES are available for the hearing impaired--please see the Clerk The City of San Luis Obispo wishes to make all of its public meetings accessible to the public. Upon request, this agenda will be made available in appropriate alternative formats to persons with disabilities. Any person with a disability who requires a modification or accommodation in order to participate in a meeting should direct such request to the City Clerk’s Office at (805) 781 -7100 at least 48 hours before the meeting, if possible. Telecommunications Device for the Deaf (805) 781-7410. Planning Commission regular meetings are televised live on Charter Channel 20. Agenda related writings or documents provided to the Planning Commission are available for public inspection on the City’s website: http://www.slocity.org/government/advisory-bodies. Meeting video recordings can be found on the City’s website: http://www.slocity.org/government/department- directory/city-clerk/on-demand-meeting-videos BLANK PAGE This page is intended to be blank so that you can print double-sided. City of San Luis Obispo, Council Agenda, City Hall, 99 0 Palm Street, San Luis Obispo Minutes - Draft Planning Commission Minutes DRAFT Planning Commission Regular Meeting Wednesday, April 14, 2021 CALL TO ORDER A Regular Meeting of the San Luis Obispo Planning Commission was called to order on Wednesday, April 14, 2021 at 6:00 p.m., via teleconference, by Chair Hemalata Dandekar. ROLL CALL Present: Commissioners Michael Hopkins, Steve Kahn, Nicholas Quincey, Michelle Shoresman, Mike Wulkan, Vice-Chair Robert Jorgensen, and Chair Hemalata Dandekar Absent: None Staff: Community Development Director Michael Codron, Deputy Community Development Director Tyler Corey, Assistant City Attorney Markie Jorgensen, and Deputy City Clerk Kevin Christian PUBLIC COMMENTS ON ITEMS NOT ON THE AGENDA None 1.CONSENT AGENDA – CONSIDERATION OF MINUTES ACTION: MOTION BY COMMISSIONER HOPKINS, SECOND BY COMMISSIONER SHORESMAN, CARRIED 7-0-0 to approve the Planning Commission Minutes of March 24, 2021. Item 1 Packet Page 1 Planning Commission Meeting Minutes April 14, 2021 Page 2 of 3 PUBLIC HEARING 2. Review of the proposed subdivision of an existing 0.98-acre parcel into three parcels (Parcel 1 – 9,800 square feet, Parcel 2 – 18,200 square feet, Parcel 3 – 14,600 square feet) (SLO 18- 0151), with an exception from the Subdivision Regulations from the minimum street frontage requirement for 0 feet where 20 feet is normally required, project includes a Mitigated Negative Declaration (CEQA).; Project address: 163 Serrano Heights; Case #: SBDV-2029-2018 & EID-010-2020; Zone: R-1; John Rourke, owner/applicant. Associate Planner Kyle Bell presented the staff report and responded to Commission inquiries. Applicant, John Rourke, provided additional comments concerning his intent, relationship with neighbors, and responded to questions raised by Commissioners. Chair Dandekar opened the public hearing. Public Comment: Jill Stelfox Chair Dandekar closed the public hearing. ACTION: MOTION BY COMMISSIONER KAHN, SECOND BY COMMISSIONER WULKAN, CARRIED 7-0-0 to adopt a resolution entitled: “A RESOLUTION OF THE SAN LUIS OBISPO PLANNING COMMISSION APPROVING A TENTATIVE PARCEL MAP TO CREATE THREE PARCELS FROM ONE EXISTING LOT (SLO 18-0151), THE PROJECT INCLUDES AN EXCEPTION FROM THE LOT FRONTAGE REQUIREMENTS OF THE SUBDIVISION REGULATIONS FOR EACH OF THE THREE PARCELS WHICH DO NOT PROVIDE ANY DIRECT ACCESS TO THE STREET BUT SHARE ACCESS THROUGH A PRIVATE DRIVE, INCLUDING A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT, AS REPRESENTED IN THE STAFF REPORT AND ATTACHMENTS DATED APRIL 14, 2021 (163 SERRANO HEIGHTS, SBDV-2029-2018 AND EID-0100-2020),” with the following condition modification: Condition #3 Plans submitted for parcel map recordation shall label all three Parcels as “sensitive sites,” with building site selection to minimize site disturbance and avoid disturbance and removal of oak trees that are greater than 4 inches in diameter in breast height. This status ensures that future site development will respect existing site constraints, privacy of occupants and neighbors of the project and be compatible with the scale and character of the surrounding neighborhood. Prior to submittal of a building permit application, development of the Parcels 1, 2, and 3 shall require architectural review, in accordance with Municipal Code Section 2.48. The Architectural review shall confirm that building site selection shall minimize site disturbance and avoid disturbance and removal of oak trees, that are greater than 4-inches in diameter at breast height. Item 1 Packet Page 2 Planning Commission Meeting Minutes April 14, 2021 Page 3 of 3 3. Review of proposed specific plan amendments allowing day care facilities within the Margarita Area and Airport Area Specific Plans. The project is exempt from the California Environmental Quality Act (CEQA) under the General Rule (CEQA Guidelines Section 15061(b)(3)). Project Address: Margarita Area and Airport Area Specific Plans; Case #: SPEC-0209-2021; Zone: Various; City of San Luis Obispo, applicant. Contract Planner John Rickenbach presented the staff report and responded to Commission inquiries. Chair Dandekar opened the public hearing. Public Comment: Kris Roudebush Ty Safreno Shana Paulson Chair Dandekar closed the public hearing. ACTION: MOTION BY COMMISSIONER HOPKINS, SECOND BY COMMISSIONER QUINCEY, CARRIED 7-0-0 to adopt a Resolution entitled: “A RESOLUTION OF THE SAN LUIS OBISPO PLANNING COMMISSION RECOMMENDING THE CITY COUNCIL INTRODUCE AN ORDINANCE TO AMEND THE AIRPORT AREA AND MARGARITA AREA SPECIFIC PLANS TO ALLOW FOR DAY CARE FACILITIES CONSISTENT WITH RESTRICTIONS THAT APPLY CITYWIDE UNDER THE MUNICIPAL CODE, WITH A DETERMINATION THAT THE PROJECT IS EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) AS REPRESENTED IN THE PLANNING COMMISSION AGENDA REPORT AND ATTACHMENTS DATED APRIL 14, 2021 (SPEC-0209- 2021).” COMMENT AND DISCUSSION 4. Agenda Forecast – Deputy Community Development Director Tyler Corey provided an update of upcoming projects. ADJOURNMENT The meeting was adjourned at 7:50 p.m. The next Regular Meeting of the Planning Commission meeting is scheduled for Wednesday, April 28, 2021, at 6:00 p.m., via teleconference. APPROVED BY THE PLANNING COMMISSION: XX/XX/2021 Item 1 Packet Page 3 BLANK PAGE This page is intended to be blank so that you can print double-sided. Packet Page 4 PLANNING COMMISSION AGENDA REPORT SUBJECT: General Plan Conformity Report for the Capital Improvement Plan of the 2021-2023 Financial Plan PROJECT ADDRESS: Citywide BY: Brian Nelson, Acting City Engineer Phone Number: 805-781-7113 Email: BNelson@slocity.org FILE NUMBER: GENP 0281-2021 FROM: Tyler Corey, Deputy Director RECOMMENDATION Report to the City Council that all projects/purchases in the Capital Improvement Plan proposed as part of the 2021-2023 Financial Plan comply with the City's General Plan. 1.0 COMMISSION'S PURVIEW State law requires the City to prepare a coordinated program of "proposed public works for the ensuing fiscal year" and to submit the plan to its planning agency "for review and report...as to conformity with the adopted general plan or part thereof '.1 San Luis Obispo's multi-year budget approach complies with the intent of this section, with the Planning Commission fulfilling the role of "planning agency" in its review of the proposed Capital Improvement Plan (CIP) every two years. The Commission's reporting that a proposed CIP conforms with the General Plan does not necessarily mean that the City endorses the project in a particular form. Individual projects must be more fully scoped, planned, designed, and undergo environmental review prior to receivin g approval to be implemented. The City Council has full discretion in deciding CIP items. There are no specific sanctions in State law if a CIP item is found not to conform with the General Plan; however, a finding of non-conformance would indicate that the plan should be re-evaluated. 2.0 PROJECT INFORMATION The CIP proposed as part of the 2021-23 Financial Plan includes a variety of projects and purchases. Construction projects and equipment purchases costing $25,000 or more are included in the Capital Improvement Plan (CIP). Capital outlays of less than $25,000 are included in the Financial Plan operating program budgets. Through the CIP, the City systematically plans, schedules, and finances capital projects to ensure cost-effectiveness and conformance with established policies and longer-term plans. The City Council prioritizes and allocates limited resources every two years after carefully considering community input. Not all General Plan goals, Specific Plans, or Concept Plans may be funded. Consequently, the proposed CIP must prioritize funding based on the Council's assessment of community needs and priorities. The proposed CIP is a five-year plan where funding 1 California Government Code Section 65401 Meeting Date: April 28, 2021 Item Number: 2 Item 2 Packet Page 5 GENP 0281-2021 (CIP General Plan Conformity Report) Planning Commission Report – April 28, 2021 Page 2 is approved by Council for the first two years and the last three years ar e projected for consideration in the next Financial Plan. 3.0 PROJECT ANALYSIS Evaluation of General Plan conformity focuses on the objects of proposed spending, not the sources of funds. CIP projects can be funded from various funding sources which include the General Fund, Grants, Impact Fees as well as the City’s Enterprise Funds which include the Sewer Fund, Water Fund, Whale Rock Fund, Parking Fund, and Transit Fund which are typically supported by user fees. A General Plan policy audit was conducted and the matrix in Attachment 1 documents how each proposed capital improvement conforms to the City's General Plan. The matrix includes a listing of CIP items for the 2021-23 Financial Plan. Each CIP item implements a program or policy in the General Plan. 3.1 Expanded Project Funding for Fiscal Years 2021-23 The 2019-21 Capital Improvement Plan was partially funded by $10.5 Million in Local Revenue Measure (Measure G) funding over two years. In November 2020, voters passed Measure G -20, which expanded the existing sales tax from 0.5% to 1.5%. As a result, the Local Revenue Measure now provides $36.7 million in Capital Improvement Plan funding over the 2021-23 Financial Plan period. This additional funding will be utilized for large scale infrastructure projects, as well as provide for an expansion of the quantity and budget of asset maintenance and replacement projects. The City will require an augmentation to CIP staffing resources in order to deliver the additional quantity of projects, which will begin during the first year of the Financial Plan. 4.0 ENVIRONMENTAL REVIEW The determination of conformity with the General Plan is exempt from environmental review as a Statutory Exemption under Section 15262, Feasibility and Planning Studies (CEQA Guidelines Section 15262). Each project listed as part of the CIP will need future aut horization and environmental review prior to construction. 5.0 OTHER DEPARTMENT COMMENTS Comments from the other departments have been incorporated into the recommended CIP projects proposed as part of the 2021-23 Financial Plan. 6.0 ALTERNATIVES The Planning Commission may direct staff to revise the report. There is no legally mandated deadline for Commission action. ATTACHMENTS 1. 2021-23 CIP General Plan Conformity Matrix Item 2 Packet Page 6 ID#CIP General Plan Conformity Matrix FY 2021-22 FY 2021-23 2 Year Total 1 Water and Wastewater Management Element: The City will manage the collection system to ensure that the proper level of maintenance is provided and that the flow in sanitary sewers does not exceed design capacity.$21,475,063 $8,166,625 $29,641,688 2 WRRF Upgrade $15,920,563 $426,625 $16,347,188 3 Construction $11,069,088 $22,335 $11,091,423 4 Construction Management $3,088,281 $257,357 $3,345,638 5 Office Engineering $1,235,313 $102,943 $1,338,256 6 Program Management $527,881 $43,990 $571,871 7 Wastewater Lift Station Rehabilitation $2,416,000 $70,000 $2,486,000 8 Airport Lift Station $2,020,000 $0 $2,020,000 9 New Buckley Lift Station $396,000 $0 $396,000 10 Silver City Lift Station $0 $70,000 $70,000 11 Wastewater Collections System Improvements $1,571,000 $5,345,000 $6,916,000 12 Islay, Henry, Sierra Way $25,000 $1,825,000 $1,850,000 13 Johnson, Buchon, etc trench & pipe bursting $135,000 $1,485,000 $1,620,000 14 Morro, Mill, Santa Rosa $135,000 $1,485,000 $1,620,000 15 Murray, Chorro, Meineke $0 $500,000 $500,000 16 San Jose, Ramona, Monte Vista, Califronia $0 $25,000 $25,000 17 Taft, Hathaway, Phillips, Buena Vista, Loomis $0 $25,000 $25,000 18 Verde, Luneta, etc trench/pipe bursting $1,276,000 $0 $1,276,000 19 Storm Drain System Replacement $910,000 $725,000 $1,635,000 20 WRRF Major Maintenance $207,500 $520,000 $727,500 21 Chain Link Fence Extension $47,500 $0 $47,500 22 Cityworks Integration $50,000 $100,000 $150,000 23 Coating Maintenance $15,000 $0 $15,000 24 Headworks Grit Piping and Blowers $0 $95,000 $95,000 25 Headworks Grit Pump $0 $175,000 $175,000 26 Lab Improvements $0 $150,000 $150,000 27 Security Lighting $95,000 $0 $95,000 28 Inflow/Infiltration Reduction $200,000 $250,000 $450,000 29 WRRF And Wastewater Collection Shop $150,000 $350,000 $500,000 30 Water Distribution System Hydraulic Model Update $50,000 $0 $50,000 31 Point Repairs - Wastewater Collections System $50,000 $50,000 $100,000 32 Infrastructure Renewal Strategy Report Update $0 $330,000 $330,000 33 Flow Study $0 $330,000 $330,000 34 WRRF - Digester Flare Upgrade $0 $100,000 $100,000 35 Circulation Element: Provide a system of streets that are well-maintained and safe for all forms of transportation.$14,338,760 $32,099,522 $46,488,282 36 Prado Road Bridge & Road Widening $7,070,100 $14,972,220 $22,042,320 37 Street Reconstruction & Resurfacing $3,513,199 $4,239,731 $7,752,930 38 Active Transportation Plan Implementation $550,000 $550,000 $1,100,000 39 2021 Sealing Project Complete Street Components $200,000 $0 $200,000 40 2022 Sealing Project Complete Street Components $0 $200,000 $200,000 41 Active Transporation Plan Tier 1 Network Implementation $50,000 $150,000 $200,000 42 Bicycle Facility Improvements $100,000 $100,000 $200,000 43 Pedestrian Facility Improvements $100,000 $100,000 $200,000 44 RRST (Tiburon to Orcutt) Prelminary Engineering & ROW $100,000 $0 $100,000 45 Higuera St. Widening - Bridge to Elks & Fontana to Chumash $510,000 $0 $510,000 46 Prado Road Interchange $500,000 $5,849,571 $6,349,571 47 Downtown Safety Enhancements $400,000 $0 $400,000 48 California & Taft Roundabout $300,000 $2,798,000 $3,098,000 49 South Street Median Landscaping $240,000 $0 $240,000 50 Sidewalk Replacement and Installation $235,461 $250,000 $485,461 Page 1 of 7 Item 2 Packet Page 7 51 Curb Ramps and Sidewalks $135,461 $150,000 $285,461 52 Street Tree Sidewalks $100,000 $100,000 $200,000 53 Trench Repairs- Water $200,000 $200,000 $400,000 54 Parking Lot Maintenance $175,000 $255,000 $430,000 55 Fire Station 2 $45,000 $0 $45,000 56 French Park $70,000 $0 $70,000 57 Islay Park $0 $35,000 $35,000 58 Laguna Lake $0 $35,000 $35,000 59 Ludwick Community Center $0 $10,000 $10,000 60 Meadow Park $10,000 $130,000 $140,000 61 Minor Repair of City Parking Lots $50,000 $25,000 $75,000 62 Santa Rosa Park $0 $20,000 $20,000 63 Development Agreement - City Share - $120,000 $715,000 $835,000 64 600 Tank Farm $0 $715,000 $715,000 65 Avila Ranch - Buckley Extension Class I $120,000 $0 $120,000 66 Bob Jones Trail and RRST Solar Lighting $100,000 $1,350,000 $1,450,000 67 Sewer Maintenance Hole Cover Adjustments $85,000 $25,000 $110,000 68 Street Lights - Annual Asset Maintenance $75,000 $75,000 $150,000 69 Neighborhood Traffic Improvements $75,000 $75,000 $150,000 70 Water Valve Cover Adjustments $50,000 $30,000 $80,000 71 Transportation Safety & Operations $50,000 $50,000 $100,000 72 Transportation Monitoring & Modeling Update $40,000 $115,000 $155,000 73 Trench Repairs- Sewer $25,000 $25,000 $50,000 74 Traffic Signs & Striping Maintenance $25,000 $25,000 $50,000 75 Buchon-Santa Rosa Intersection Improvements $0 $400,000 $400,000 76 Bridge Maintenance $0 $100,000 $150,000 77 Parks and Recreation Element: The City shall develop and maintain a park system…$7,510,000 $5,725,026 $13,235,026 78 Emerson Park Amenity Upgrades and Beautification $2,810,000 $0 $2,810,000 79 Park Major Maintenance & Repairs $1,835,000 $160,000 $1,995,000 80 ADA Transition Plan Implementation $20,000 $20,000 $40,000 81 Cheng Park Revitalization $300,000 $0 $300,000 82 Concrete Bench & Table Replacement Various Locations $15,000 $15,000 $30,000 83 Irrigation Mainline Leak Repair $15,000 $15,000 $30,000 84 Jack House Arbor $0 $7,500 $7,500 85 Meadow Park Excersise/Par Course Equipment Replacement $0 $40,000 $40,000 86 Mission Plaza Railing Upgrade $80,000 $0 $80,000 87 Parks Play Surfacing $30,000 $30,000 $60,000 88 Poinsettia Creek Walk $215,000 $0 $215,000 89 Railroad Bike path fencing $350,000 $0 $350,000 90 Santa Rosa Barbecque Replacements $0 $7,500 $7,500 91 Sinsheimer Hardscape Replacement $135,000 $0 $135,000 92 Sinsheimer Stadium Irrigation and Drainage Replacement $650,000 $0 $650,000 93 Water Stations and Supply Lines $25,000 $25,000 $50,000 94 Development Related Park Improvements $1,520,000 $4,210,026 $5,730,026 95 Laguna Lake Improvements $0 $2,875,026 $2,875,026 96 Orcutt Area - Linear Park $200,000 $825,000 $1,025,000 97 Orcutt Area - Neighborhood Park $1,200,000 $0 $1,200,000 98 Orcutt Area - Pocket Park $80,000 $350,000 $430,000 99 Orcutt Area - Trail Junction $40,000 $160,000 $200,000 100 Laguna Lake Dredging and Sediment Management Project Implementation $840,000 $0 $840,000 101 Dredging and Shoreline Restoration $840,000 $0 $840,000 102 Parks and Rec General Plan Implementation $200,000 $200,000 $400,000 103 North Broad Street Neighborhood Park $175,000 $0 $175,000 104 Playground Equipment Replacement $110,000 $100,000 $210,000 Page 2 of 7 Item 2 Packet Page 8 105 DeVaul Ranch Playground $60,000 $60,000 106 Mitchell Park Playground $0 $100,000 $100,000 107 Vista Lago Mini Park Playground $50,000 $50,000 108 Laguna Lake Golf Course Maintenance $20,000 $20,000 $40,000 109 Mission Plaza Concept Plan Implementation $0 $1,035,000 $1,035,000 110 Phase 1 - Restroom Replacement and Kiosk Café $0 $1,035,000 $1,035,000 111 Circulation Element: Manage City operations for energy efficiency, including purchase and use of vehicles, equipment and materials.$4,219,000 $3,620,000 $7,839,000 112 Bus Replacements with EV $1,854,000 $1,910,000 $3,764,000 113 Transit Facility EV Charging Infrastructure $715,000 $0 $715,000 114 EV Charger Installations $100,000 $0 $100,000 115 EV Infrastructure Upgrades Behind the Meter $615,000 $0 $615,000 116 Fleet Replacement: Public Works $631,000 $298,000 $929,000 117 Engineering Pickup (2), 3 Yr Temp $66,000 $0 $66,000 118 Facilities Maintenance 3/4 ton Pickup with Utility Bed (0612)$0 $60,000 $60,000 119 Fleet Maintenance (Corp Yard) Stationary Generator (200kw)$100,000 $0 $100,000 120 Park Maintenance Mower (1007)$75,000 $0 $75,000 121 Park Maintenance Tractor (0218)$0 $75,000 $75,000 122 Parking 1/2 ton Pickup (0813)$0 $55,000 $55,000 123 Parking Scooters (1403,1404 Go-4's) replc with 1 LPR equiped vehiclectup $0 $75,000 $75,000 124 Parks Maintenance Trailer (0320)$0 $15,000 $15,000 125 Parks Maintenance Trailer (9915)$0 $8,000 $8,000 126 Parks Maintenance Trailers (0007, 9405)$0 $10,000 $10,000 127 Streets Maint 2 Axle Kneeling trailer (0420) $30,000 $0 $30,000 128 Streets Maint Asphalt Zipper Safety Improvements (1802)$75,000 $0 $75,000 129 Streets Maintenance F550 Truck with Hooklift Bed(0843)$150,000 $0 $150,000 130 Streets Maintenance F550 Truck with Utility Bed and Crane(0842)$135,000 $0 $135,000 131 Fleet Replacement: Utilities $315,000 $535,000 $850,000 132 Sewer Hydrocleaner (0718)$0 $475,000 $475,000 133 Sewer WWCL Tilt-Trailer (0616)$0 $30,000 $30,000 134 Water Distribution F550 Truck-Utility Bed / Crane (0841-Diesel)$180,000 $0 $180,000 135 Water Distribution Signboard (0613)$15,000 $0 $15,000 136 Water Distribution Trailer (0235)$0 $15,000 $15,000 137 Whale Rock Trailer (0417)$0 $15,000 $15,000 138 WRRF F550 Flatbed with crane (0611-F550 Diesel)$80,000 $0 $80,000 139 WRRF Forklift (0622)$40,000 $0 $40,000 140 Fleet Replacement: Fire $275,000 $465,000 $740,000 141 Fire 1/2 ton Truck $75,000 $0 $75,000 142 Fire Compact Truck $0 $50,000 $50,000 143 Fire Heavy Duty Truck (Type 3 Wildland)$0 $415,000 $415,000 144 Fire Medium Duty Truck with Utility Bed $125,000 $0 $125,000 145 Open Space Rescue 4x4 1/2 Ton Truck $75,000 $0 $75,000 146 Fleet Replacement: Police $220,000 $235,000 $455,000 147 Police Investigations SUV $0 $65,000 $65,000 148 Police Motorcycles $40,000 $40,000 $80,000 149 Police Patrol Hybrid SUV (2 Vehicles per Year))$130,000 $130,000 $260,000 150 Police SNAP SUV Hybrid (0818)$50,000 $0 $50,000 151 Fleet Replacement: Parks and Recreation $139,000 $103,000 $242,000 152 Dump Trailer $9,000 $0 $9,000 153 Golf Course Mower (1201)$65,000 $0 $65,000 154 Golf Course Trailer (0506)$10,000 $0 $10,000 155 Masticator attached to Skid-Steer $35,000 $0 $35,000 156 Parks and Rec Ranger Truck, F350 HD Towing $0 $55,000 $55,000 157 Parks and Recreation Event Trailer $20,000 $0 $20,000 Page 3 of 7 Item 2 Packet Page 9 158 Parks and Recreation Minivan (0802)$0 $48,000 $48,000 159 Transit Supervisor ADA EV Van $70,000 $0 $70,000 160 Fleet Replacement: CDD $0 $74,000 $74,000 161 Building & Safety SUV (#0129, <> Chevy Bolt EV)$0 $37,000 $37,000 162 Building & Safety SUV (NEW <> Chevy Bolt EV)$0 $37,000 $37,000 163 Circulation Element: The City shall design and maintain bikeways to make bicycling safe, convenient and enjoyable. The City shall encourage and promote walking as a regular means of transportation.$3,120,000 $225,000 $3,345,000 164 Anholm Neighborhood Greenway Plan Implementation $2,450,000 $0 $2,450,000 165 Phase II $2,450,000 $0 $2,450,000 166 Pedestrian and Bicycle Pathway Maintenance $370,000 $200,000 $570,000 167 Madonna Inn Frontage Bike Pathway (Madonna to Fernandez)$150,000 $150,000 168 Meadow Park Pathways $350,000 $0 $350,000 169 Pedestrian and Bicycle Pathway Inventory and PCI Study $20,000 $0 $20,000 170 Railroad Safety Trail from Cal Poly to Taft Street $0 $50,000 $50,000 171 Open SLO $200,000 $0 $200,000 172 Downtown Renewal - Supplemental funding for Curbside Parklets $200,000 $0 $200,000 173 Banner Arms, Bench Arm Rests, Signs $100,000 $25,000 $125,000 174 Water and Wastewater Management Element: Manage the City’s water resources to meet the current and future water demand requirements associated with development envisioned by the General Plan.$2,495,000 $4,904,000 $7,399,000 175 Waterline Replacements $730,000 $1,650,000 $2,380,000 176 California Ave - Stafford to Mill $140,000 $1,650,000 $1,790,000 177 Point Repair $590,000 $0 $590,000 178 Water Treatment Plant Emergency Power - PSPS $465,000 $0 $465,000 179 Water Meters and Boxes $286,000 $330,000 $616,000 180 Water Treatment Plant Major Facility Maintenance $275,000 $180,000 $455,000 181 Actiflo Train #2 Mixer Bearing/Gear $0 $35,000 $35,000 182 Aluminum Bulk Tank #1 Replacement $50,000 $0 $50,000 183 Cityworks Integration (water)$50,000 $90,000 $140,000 184 Facility Master Plan $150,000 $0 $150,000 185 Lab TOC Analyzer Replacement $0 $30,000 $30,000 186 Package Thickener $0 $25,000 $25,000 187 Transfer Pump CLA-VAL Re-build $25,000 $0 $25,000 188 Treatment Major Facilities Maintenance $274,000 $109,000 $383,000 189 Air Compressor and Dryer Maintenance $36,000 $36,000 $72,000 190 Chemical System Maintenance $33,000 $33,000 $66,000 191 Ozone System Maintenance $125,000 $40,000 $165,000 192 WTP Roof Repair $80,000 $0 $80,000 193 Sustainable Groundwater Management Act GSP $150,000 $150,000 $300,000 194 Recycled Water Tank - SH Line and Pump & Bioassay Test $150,000 $50,000 $200,000 195 Reservoir Maintenance $50,000 $1,355,000 $1,405,000 196 Edna Tank Recoating $0 $80,000 $80,000 197 Reservoir 2 Cover Replacement $10,000 $950,000 $960,000 198 Wash water tank #1 $40,000 $325,000 $365,000 199 Recycled Water Broad Street - Tank Farm to Aerovista $45,000 $1,040,000 $1,085,000 200 Fire Hydrants $40,000 $40,000 $80,000 201 Water Treatment Plant - Power Storage Units Tesla Battery Grant $30,000 $0 $30,000 Page 4 of 7 Item 2 Packet Page 10 202 Land Use Element: The City shall ensure there is a diversity of parking opportunities in the Downtown. Any major increments in parking supply should take the form of structures, located at the edges of the commercial core, so people can walk rather than drive between points within the core.$1,790,000 $6,572,000 $8,362,000 203 Palm - Nipomo Parking Structure $850,000 $5,582,000 $6,432,000 204 842 Palm Parking Structure Maintenance $400,000 $400,000 $800,000 205 871 Marsh Street Structure Maintenance $400,000 $400,000 $800,000 206 919 Palm Street Structure Maintenance $100,000 $100,000 $200,000 207 Parking Enforcement Equipment at Gate Entry $40,000 $90,000 $130,000 208 Conservation and Open Space Element: The City will manage its operations for efficient materials use by: A. Substituting electronic information exchange for paper whenever feasible and cost-effective.$1,612,558 $1,606,445 $3,219,003 209 IT Replacement $1,112,558 $606,445 $1,719,003 210 911 Phone System $250,000 $0 $250,000 211 Asset Management (Cityworks - Utilities Integration)$35,300 $0 $35,300 212 Audio Recording System Replacement $150,000 $0 $150,000 213 City SAN $0 $198,500 $198,500 214 IT Pipes Inspection Software and Licenses $82,250 $0 $82,250 215 PD SAN $0 $145,000 $145,000 216 Police CAD Hardware (Servers and Storage) $233,000 $117,000 $350,000 217 Public Safety Specialized Surveillance cameras (PODs) Replacement (9K ea, 14 total)$63,000 $54,000 $117,000 218 Radio Handhelds & Mobiles $116,758 $0 $116,758 219 Uninterruptible Power Supplies (UPS’s Servers and Storage) $51,000 $0 $51,000 220 VMware Infrastructure Upgrade $131,250 $0 $131,250 221 Wireless System Citywide $0 $91,945 $91,945 222 CIP Project Delivery Augmentation $500,000 $1,000,000 $1,500,000 223 Conservation and Open Space Element: The City will use material efficiently in its buildings and facilities, services and operations, and encourage others to do the same.$1,327,500 $1,238,200 $2,565,700 224 Major Facility Maintenance $772,500 $633,200 $1,405,700 225 879 Morro - Roof $0 $15,000 $15,000 226 ADA Transition Plan Implementation $10,500 $10,500 $21,000 227 City Hall Landing Repair $60,000 $0 $60,000 228 Corp Yard Fuel Island Siding / Recoating of Fuel Island and Dispensers $0 $300,000 $300,000 229 Energy Management Controls Upgrade $75,000 $50,000 $125,000 230 Facility Roll Up Door Replacements - Various Locations $17,000 $15,000 $32,000 231 Fire Station #1 Administration Bldg Roof $270,000 $0 $270,000 232 Fire Station #4 - Exterior Paint $0 $27,500 $27,500 233 Fire Station 1 Campus Roof Access Ladders $50,000 $0 $50,000 234 HVAC Air Handler at Parking Services $5,000 $25,000 $30,000 235 Hydration Stations $15,000 $15,000 $30,000 236 IT Room Heat Pump Replacements $20,000 $0 $20,000 237 Jack House Widows Walk Railing $100,000 $0 $100,000 238 Ludwick and Senior Center - Exterior Paint and Shell Rehab $0 $30,000 $30,000 239 Ludwick Community Center - Roof and Solar Replacement $0 $40,000 $40,000 240 Police Evidence Storage Bldg. and Police Range - Roof $5,000 $47,200 $52,200 241 Swim Center Auto Vacuum $0 $18,000 $18,000 242 Swim Center Bath House Ceiling $5,000 $0 $5,000 243 Swim Center Furnaces (2 Furnaces)$0 $40,000 $40,000 244 Swim Center Olympic Pool Thermal Blankets $5,000 $0 $5,000 245 Swim Center Pool Water Chemical Regulator $50,000 $0 $50,000 246 Swim Center Therapy Pool Boiler $85,000 $0 $85,000 Page 5 of 7 Item 2 Packet Page 11 247 Major Facility Replacements $200,000 $300,000 $500,000 248 Parks and Recreation Interior Office Rehabilitation $100,000 $0 $100,000 249 Police Station Replacement $100,000 $300,000 $400,000 250 Electric Vehicle Charging Station at Various Facilities $175,000 $100,000 $275,000 251 Corporation Yard $50,000 $0 $50,000 252 Parks and Recreation $50,000 $0 $50,000 253 Utilities - 879 Morro $75,000 $0 $75,000 254 Various City Facilities $0 $100,000 $100,000 255 City Facility Energy Infrastructure Plan $100,000 $0 $100,000 256 Microgrid Pilot $40,000 $0 $40,000 257 Fire Station 3&4 Remodel Space Study and Design $25,000 $75,000 $100,000 258 Lighting Energy Efficiency Retrofits $15,000 $0 $15,000 259 Priority Facility Efficiency Retrofits Using On-Bill Financing $15,000 $0 $15,000 260 Council Hearing Room TI $0 $130,000 $130,000 261 Land Use Element: Develop buildings and facilities which will contribute to our sense of place and architectural heritage.$892,500 $457,500 $1,350,000 262 Roundabout Public Art Installations $300,000 $300,000 $600,000 263 Downtown Zig-Zag Lighting $250,000 $0 $250,000 264 Downtown Public Art Installations $200,000 $0 $200,000 265 Annual Public Art Maintenance and Projects $142,500 $142,500 $285,000 266 Public Art Annual Asset Maintenance $20,000 $20,000 $40,000 267 Small Public Art Projects $102,500 $102,500 $205,000 268 Utility Box Beautify $20,000 $20,000 $40,000 269 City Hall Lighting $0 $15,000 $15,000 270 Water and Wastewater Management Element: The City will coordinate the operation of the Salinas, Whale Rock, and Nacimiento Reservoirs to maximize available water resources.$875,000 $655,000 $1,530,000 271 Whale Rock Reservoir - Major Facility Maintenance $815,000 $145,000 $960,000 272 Reservoir Fencing $20,000 $20,000 $40,000 273 Spillway Drain Repairs $765,000 $0 $765,000 274 Stilling Basin $30,000 $90,000 $120,000 275 Whale Rock Reroof of Shop and Residence $0 $35,000 $35,000 276 Whale Rock Pipeline Reliability Assessment $60,000 $510,000 $570,000 277 Transmission Pipeline Repairs $60,000 $510,000 $570,000 278 Safety Element: The City should allow flood waters to move through natural channels. Flow should be accommodated by removing debris and manmade obstructions.$402,272 $200,000 $602,272 279 Silt Removal $210,000 $100,000 $310,000 280 Mid-Higuera Bypass $100,000 $100,000 $200,000 281 Pismo/Johnson/SL Creek Bank Stabilization $92,272 $0 $92,272 282 Conservation and Open Space Element: Secure and maintain a healthy and attractive Greenbelt around the urban area.$335,000 $355,000 $690,000 283 Open Space Acquisition $250,000 $250,000 $500,000 284 Open Space Maintenance $85,000 $105,000 $190,000 285 General Open Space Maintenance $60,000 $80,000 $140,000 286 Open Space Fencing $25,000 $25,000 $50,000 287 Conservation and Open Space Element: Emphasize the planting and maintenance of California Native tree species of sufficient height, spread, form and horticultural characteristics to create the desired streetscape canopy, shade, buffering from adjacent uses, and other desired streetscape characteristics, consistent with the Tree Ordinance or as recommended by the Tree Committee or as approved by the Architectural Review Commission.$315,000 $175,000 $490,000 288 Urban Forest Maintenance $315,000 $175,000 $490,000 Page 6 of 7 Item 2 Packet Page 12 289 Urban Forest Maintenance $175,000 $175,000 $350,000 290 Urban Forest Master Plan $140,000 $0 $140,000 291 Circulation Element: The City shall improve and expand city bus service to make the system more convenient and accessible for everyone.$185,000 $965,000 $1,150,000 292 Bus Shelter Replacements $105,000 $0 $105,000 293 Bus Wash Replacement $75,000 $450,000 $525,000 294 Parking Lot Maintenance - Bus Yard $5,000 $500,000 $505,000 295 Vault Room Addition Design Study $0 $15,000 $15,000 296 Grand Total $60,892,653 $66,964,318 $127,906,971 Page 7 of 7 Item 2 Packet Page 13