Re:546 Higuera Street
Higuera Commons,LLC:
I have been requested to comment on the potential for restoration
of the referenced property.As a general contractor and the owner
of Molnar Construction and Development,Inc.,1 have developed
expertise in the application of guidelines for restoration of such
buildings.Most recently,I have participated in the evaluation with
historians and architects in preparation of restoration plans for the
Avila Schoolhouse in downtown Avila and the Leitcher House on
Monterey Street in SLO,both owned by my partnership,Shear Edge
Development.My company has built numerous custom homes on
the central coast,retailing for between $400 and $2000 per square
foot.As a result I have substantial expertise in various and sundry
construction techniques,both restoration and new construction.
The red house at 546 Higuera Street cannot be restored without a
complete reconstruction of the building.The reconstruction is
problematic given the absence of a foundation.The house may
simply collapse when raised for foundation work,given the lack of
MOLNARCUSTOMHOMES.COM
805-235-2295
-----------
structural integrity in the building.Even if it could be done,the total
cost to do so would exceed the cost of new construction.The
market value of the project would be less than the cost of the new
construction.Due to the extreme deterioration and age of the
structure and its sub-par structural components,there is simply no
efficient way to restore this building.I estimate the reconstruction
of this house would cost $500 per square foot and possibly much
more,depending on the historic features required to be included in
a reconstruction effort.The value of downtown luxury homes
recently sold in the Marsh Street Commons project was less than
this amount.
The following are specific challenges with respect to a potential
reconstruction of the building:
l.Lack of a foundation.At present there is no foundation.To
construction one,the house would have to be raised on steel
beams.This is likely to result in substantial cracking of walls and
potential collapse of entire section of the house,given its lack of
structural integrity.The front porch is severely cracked and will
have to be demolished.The connections of the roof supports to the
porch are not to code and would have to be replaced.
2.Lack of structural integrity.The building has a bizarre collection
of inconsistent and substandard structural components.Much of
the walls are constructed with "flat stud"framing (2 bys turned the
wrong way)or in some cases,1x8 planks,which provides virtually
no framing.Some exterior walls were observed with 2x3 stud
framing.All of these walls would have to be torn down and re-
framed.Of the full-size 2x4 framing observed in at least one
interior wall,I would estimate 50%of those studs would be unusable
due to aging and rot.None of the modern code shear wall strength
requirements are present and would have to be incorporated into a
rebuild effort.I would expect to replace all the joists between floors
and the roof.In other words,every wall of the entire building would
have to be disassembled and reconstructed to achieve structural
integrity.
MOLNARCUSTOMHOMES.COM
80:'5-23:'5-2295
3.Siding replacement.All the siding would have to be removed.To
preserve any of the siding,each board would have to be removed by
hand,which will result in substantial cracking and damage.I would
estimate at least 65%of these boards would be unusable due to
damage in removal,warping,rot,etc.
4.Roofing.The roof is completely unusable and will have to be
rebuilt from the joists up.
5.lnterior wall coverings.The interior walls are a collection of
paperboard,wallboard,lath and plaster and non-original panelling.
Most of the walls are in substantial disrepair.Since the studs will all
have to be replaced insulation added and since the construction is
all cracked and substandard,virtually all the interior wall coverings
will have to be completely removed down to the studs and nothing
will be preserved.
6.Fenestration.The windows are all single pane and will no doubt
have to be replaced to meet Title 24 requirements.Many do not
meet exiting requirements of modern codes and would have to be
replaced for that reason,as well.
7.Chimneys.The chimneys are made of unreinforced masonry and
likely cannot be functionally preserved,structurally or consistent
with current air quality requirements.
8.Interior stairway.The custom stairway balustrade is obviously too
short to meet code and would have to be replaced.
In sum,only cosmetic features could be preserved in a
reconstruction of this building.Even the siding would have to be
replaced.
Electrical.All must be replaced.
Steve M~lnJ';1
~~