HomeMy WebLinkAbout2021-01-04Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Monday 1/4/2021      NOTES LOG   No.Comments   1 Observatoin By Jerry Missamore: Souza crew on site at 7 AM to wrk on extra work in the Maino Parking lot installing a 6'' curb along the west bank from the type 742 barrier rail to the north along the redwood tree to allow water to drain on to the dirt area of the parking lot at the far north end. Souza crews also working on re installing the curb at the Davita Hollister Property. Lee Wilson on site to finsih splicing wires together for the lighting system. Spoke with Lyle N. (City Of SLO) about the banner arms needed to be installed on the lights and he was going to bring out Lee Wilson unsure if they were going to install today.   2 Souza crews were only able to demo the parking lot driveway area at the Davita Hollister property today. Went over December pay estimate with Steve S. (Souza) and Jeff P. (FE).   3 Spoke with Garrett V. (Souza) about expansion joints in the curb and also deep joints at the Maino Property   4   5 Review of the Type C411 rail today and there appeard to be a white efflulence that came out the rail and discolored the rail. Spoke with Garrett V. and Steve S. (Souza) about the discoloration and and Steve indicated Souza should get of Calportland and let them come look at the concrete and see if it is a reaction with every the anti graffitti.      MANPOWER LOG 8 Workers  |   64.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Garrett Vanfleet- Carpenter Foreman extra work 8 hours BI 57 2 hours   1 8.0 8.0       2 Souza Dana Missamore-Laborer BI 57 extra work 2 hrs   1 8.0 8.0       3 Souza Mylan Elder-Carpenter Apprentice extra work BI 57   1 8.0 8.0       4 Souza Raymond Garcia-Carpenter Apprentice extra work 8hrs   1 8.0 8.0       5 Souza Carlos Pina-Cement Mason extra work 10 hrs Bi 57   1 8.0 8.0         Filippin Engineering Page 1 of 2 Printed on 1/14/2021 at 03:00 PM PST       MANPOWER LOG 8 Workers  |   64.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   6 Souza Jorge Garcia-Cement Mason extra work 10 hrs BI 57   1 8.0 8.0       7 Lee Wilson Electric Jason Haynes-Apprentice electrician BI 116 5 hrs   1 8.0 8.0       8 Lee Wilson Electric Jason Heller- Electrician Foreman BI 116 5 hrs   1 8.0 8.0          8  64.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 2500 GMC utility Truck No   09:20 AM    Notes:Lee Wilson  2 F450 Super Duty No   09:20 AM    Notes:Souza  3 Dump Trailer No   09:20 AM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 58°F 52°F 0.01 in.0.02 in.0.03 in.76%86%97%48°F 3.4 mph 8 mph 12 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM partly-cloudy-night   47°F partly-cloudy-day   52°F cloudy   57°F cloudy   59°F partly-cloudy-night   57°F partly-cloudy-night   54°F     By  Date  Copies To     Filippin Engineering Page 2 of 2 Printed on 1/14/2021 at 03:00 PM PST        Jerry Missamore 1/4/2021