HomeMy WebLinkAbout2021-01-13Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Wednesday 1/13/2021      NOTES LOG   No.Comments   1 Arrived on site at 9:30. Post were grouted and in place. Top of fence railing was not level because it was following the grade of the retaining wall (7.5" rise from bridge railing to 4' park fence). Conversation with Lyle (City) and Jeff (FE), it was decided that the top of fence needs to be level with the bridge railing. I spoke with Garret (Souza) and explained the situation, he agreed that the fence should be level. It was decided that 2 of the 3 post would come out leaving the post closest to the bridge railing. The fence would be a max of 6' tapering down 7.5" as it gets to the 4' fence. Anthony (CCF) left the site at 11:50. Mike (Souza) and Ryan (CCF) started working on removing the 2 posts. Using a rotohammer and jack, the fence posts were removed. 2nd post was removed at 2:15. Ryan (CCF) and Mike (Souza) left site at 2:30. Coatings on the new fence structure started to fail (bubbling/peeling). I called Garrett and asked them what the coating process was- He explained that they HDG the structure then sprayed rustoleum over. I explained that surface prep on HDG is required so that the coatings would adhere. Steve (Souza) showed up on site and we had a conversation about the coatings- He agreed that the galvanized surfaces needed to be prepped prior to topcoating and he will get materials from Sherwin Williams to properly prep and coat the steel. They plan on stripping spray paint, rolling on primer, and then rolling on finish coat. One of the posts was not removed and will have to be prepped/coated in the field.      MANPOWER LOG 3 Workers  |   19.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Mike Keuntje- truck & dump trailer   1 7.0 7.0       2 Souza Central Coast Fence- Ryan Lundeberg- Foreman-6500 silverado truck 33   1 8.0 8.0       3 Souza Central Coast Fence- Anthony Leornas/laborer   1 4.0 4.0          3  19.0      OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        Filippin Engineering Page 1 of 2 Printed on 2/4/2021 at 01:30 PM PST      WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 73°F 59°F 0.01 in.0.02 in.0.03 in.24%45%74%36°F 8.8 mph 13 mph 26 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   49°F partly-cloudy-day   57°F partly-cloudy-day   69°F partly-cloudy-day   72°F partly-cloudy-night   65°F clear-night   60°F     By  Date  Copies To     Filippin Engineering Page 2 of 2 Printed on 2/4/2021 at 01:30 PM PST        Austin Della 1/13/2021